Letter Sequence Other |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Results
Other: ML040300802, ML040631055, ML042520157, ML042670485, ML050870511, ML051090111, ML052290107, ML052800176, W3F1-2004-0076, To Amendment Request NPF-38-256, Alternate Source Term, W3F1-2004-0085, Schedule Clarification for Amendment Request NPF-38-249, Extended Power Uprate, W3F1-2004-0095, To Amendment Request NPF-38-256 Alternate Source Term, W3F1-2004-0101, To Amendment Request NPF-38-256, Alternate Source Term, Waterford Steam Electric Station, Unit 3
|
MONTHYEARML0425201572004-01-14014 January 2004 E-mail to T. Alexion Dated 1/14/04 Waterford - Extended Power Uprate Project stage: Other ML0401405152004-01-14014 January 2004 Meeting with Entergy, Waterford Steam Electric Station, Unit 3 Extended Power Uprate Amendment Request Dated 11/13/2003 Project stage: Meeting ML0403302602004-01-28028 January 2004 1/28/04 Waterford 3 - RAI Revision to Facility Operating License & TS - Extended Power Uprate Request. TAC MC1355 Project stage: RAI ML0403008022004-01-28028 January 2004 FRN -Notice of Consideration of Issuance of Amendment for Extended Power Uprate and Opportunity for Hearing Project stage: Other W3F1-2004-0004, Supplemental Information Extended Power Uprate - Power Ascension Testing2004-01-29029 January 2004 Supplemental Information Extended Power Uprate - Power Ascension Testing Project stage: Request ML0425201642004-01-30030 January 2004 E-mail Dated 1/30/04 RAI from Environmental Section on Waterford Unit 3 Project stage: RAI ML0425201672004-02-10010 February 2004 E-mail Dated 2/10/04 Waterford - Draft RAI from Human Performance, Piping Integrity and Electrical Groups Project stage: Draft RAI ML0425201702004-02-18018 February 2004 E-mail Dated 2/18/04 Re RAI from I&C - Waterford Project stage: RAI ML0405506052004-02-20020 February 2004 Westinghouse Request Withholding from Public Disclosure, Waterford 3, Extended Power Uprate, Appendix 1 - Safety Evaluation Report Compliance, MC1355 Project stage: Approval ML0425201712004-02-23023 February 2004 E-mail Dated 2/23/04 Waterford RAI Containment Systems Project stage: RAI ML0406310552004-02-26026 February 2004 Summary of Entergy Operations, Inc. Presentation of Extended Power Uprate Project stage: Other ML0426704852004-03-0202 March 2004 E-mail from D. Miller to K. Kalyanam Re RAI from J. Tsao Project stage: Other ML0426704892004-03-0202 March 2004 E-mail from B. Miller to N. Kalyanam RAI from SPLB-Angelo Stubbs Project stage: RAI W3F1-2004-0017, Supplement to Amendment Request NPF-38-249 Regarding Extended Power Uprate2004-03-0404 March 2004 Supplement to Amendment Request NPF-38-249 Regarding Extended Power Uprate Project stage: Supplement ML0406909622004-03-0909 March 2004 Extended Power Uprate Acceptance Review Project stage: Acceptance Review ML0407809952004-03-16016 March 2004 RAI, Proposed Revision to Facility Operation License and TSs - Extended Power Uprate Request Project stage: RAI ML0408506542004-03-24024 March 2004 RAI Related to Revision to Facility Operating License and TSs - Extended Power Uprate Request Project stage: RAI ML0412102452004-03-26026 March 2004 Request for Additional Information, Revision to Facility Operating License & Technical Specifications - Extended Power Uprate Request Project stage: RAI ML0409102392004-03-31031 March 2004 RAI Related to Revision to Facility Operating License and TSs - Extended Power Uprate Request Project stage: RAI ML0410005142004-04-0808 April 2004 RAI Related to Revision to Facility Operating License and TSs - Extended Power Uprate Request Project stage: RAI W3F1-2004-0029, Extended Power Uprate, Waterford, Unit 3 Supplement to Amendment Request2004-04-15015 April 2004 Extended Power Uprate, Waterford, Unit 3 Supplement to Amendment Request Project stage: Supplement ML0411301942004-04-20020 April 2004 RAI Related to Revision to Facility Operating License and TSs - Extended Power Uprate Request Project stage: RAI ML0412705672004-05-0404 May 2004 RAI, Revision to Facility Operating License and TSs - Extended Power Uprate Request Project stage: RAI W3F1-2004-0035, Supplemental to Amendment Request for Extended Power Uprate2004-05-0707 May 2004 Supplemental to Amendment Request for Extended Power Uprate Project stage: Supplement W3F1-2004-0028, License Amendment Request NPF-38-254, Reactor Coolant System Leakage Detection2004-05-0707 May 2004 License Amendment Request NPF-38-254, Reactor Coolant System Leakage Detection Project stage: Request W3F1-2004-0037, Supplement to Amendment Request NPF-38-249, Extended Power Uprate2004-05-12012 May 2004 Supplement to Amendment Request NPF-38-249, Extended Power Uprate Project stage: Supplement ML0413801452004-05-13013 May 2004 Supplement to Amendment Request NPF-38-249, Extended Power Uprate Project stage: Supplement W3F1-2004-0043, Supplement to Amendment Request NPF-38-249, Extended Power Uprate2004-05-21021 May 2004 Supplement to Amendment Request NPF-38-249, Extended Power Uprate Project stage: Supplement W3F1-2004-0047, Supplement to Amendment Request NPF-38-249, Extended Power Uprate2004-05-26026 May 2004 Supplement to Amendment Request NPF-38-249, Extended Power Uprate Project stage: Supplement ML0417405772004-06-21021 June 2004 RAI, Revision to Facility Operating License and Technical Specifications - Extended Power Uprate Request, TAC MC1355 Project stage: RAI ML0420202942004-07-15015 July 2004 License Amendment Request NPF-38-256, Alternate Source Term Project stage: Request W3F1-2004-0061, Supplement to Amendment Request NPF-38-249, Extended Power Uprate2004-07-28028 July 2004 Supplement to Amendment Request NPF-38-249, Extended Power Uprate Project stage: Supplement ML0421100882004-07-29029 July 2004 Meeting with Entergy to Discuss Issues with Extended Power Uprate and Alternate Source Term Submittals Project stage: Request ML0422303352004-08-10010 August 2004 August 11, 12 and 13, 2004 Meeting with Westinghouse Re Waterford Main Steam Line Break, Feedwater Line Break and EPU Project stage: Meeting W3F1-2004-0068, Supplement to Amendment Request NPF-38-249 Extended Power Uprate2004-08-10010 August 2004 Supplement to Amendment Request NPF-38-249 Extended Power Uprate Project stage: Supplement W3F1-2004-0071, Supplement to Alternate Source Term Submittal2004-08-19019 August 2004 Supplement to Alternate Source Term Submittal Project stage: Request ML0423904892004-08-26026 August 2004 Meeting with Entergy to Discuss Issues with Extended Power Uprate and Alternate Source Term Submittals Project stage: Meeting W3F1-2004-0076, To Amendment Request NPF-38-256, Alternate Source Term2004-09-0101 September 2004 To Amendment Request NPF-38-256, Alternate Source Term Project stage: Other W3F1-2004-0078, Supplement to Amendment Request NPF-38-249, Extended Power Uprate2004-09-14014 September 2004 Supplement to Amendment Request NPF-38-249, Extended Power Uprate Project stage: Supplement ML0427505192004-09-29029 September 2004 RAI Extended Power Uprate Request and Alternate Source Term Request Project stage: RAI ML0427402482004-09-30030 September 2004 (3) Steam Elecric Station, 3, Draft EA and Finding of No Significant Impact Related to a Proposed License Amendment to Increase the Licensed Power Level (Tac. MC1355) Project stage: Draft Other W3F1-2004-0086, Supplement to Amendment Request NPF-38-249, Extended Power Uprate2004-10-0808 October 2004 Supplement to Amendment Request NPF-38-249, Extended Power Uprate Project stage: Supplement W3F1-2004-0092, Supplement to Amendment Request NPF-38-249 Extended Power Uprate2004-10-0808 October 2004 Supplement to Amendment Request NPF-38-249 Extended Power Uprate Project stage: Supplement W3F1-2004-0085, Schedule Clarification for Amendment Request NPF-38-249, Extended Power Uprate2004-10-13013 October 2004 Schedule Clarification for Amendment Request NPF-38-249, Extended Power Uprate Project stage: Other W3F1-2004-0095, To Amendment Request NPF-38-256 Alternate Source Term2004-10-13013 October 2004 To Amendment Request NPF-38-256 Alternate Source Term Project stage: Other W3F1-2004-0101, To Amendment Request NPF-38-256, Alternate Source Term, Waterford Steam Electric Station, Unit 32004-10-19019 October 2004 To Amendment Request NPF-38-256, Alternate Source Term, Waterford Steam Electric Station, Unit 3 Project stage: Other ML0430102382004-10-21021 October 2004 Supplement to Amendment Request NPF-38-249, Extended Power Uprate Project stage: Supplement ML0431006112004-10-26026 October 2004 RAI - Revision to Facility Operating License and Technical Specifications - Extended Power Uprate Request Project stage: RAI W3F1-2004-0089, Supplement to Amendment Request NPF-38-2492004-10-29029 October 2004 Supplement to Amendment Request NPF-38-249 Project stage: Supplement W3F1-2004-0107, Supplement to Amendment Request NPF-38-2492004-10-29029 October 2004 Supplement to Amendment Request NPF-38-249 Project stage: Supplement 2004-03-04
[Table View] |
Text
N. Kaly Kalyanam - LETA BROWN'S RAI v
Page 1qi From:
To:
Date:
Subject:
Thomas Alexion N. Kaly Kalyanam 1/14/04 11:OOAM LETA BROWN'S RAI
- Kaly, See the attached.
/fŽeCAA Jz2 K,
3
-1 Tom 1r0vcyL4
( L? -3 C I
WICa13
N. Kaly Kalyanam - Brown.wpd
~Page 1
WATERFORD 3 - EXTENDED POWER UPRATE (TAC MC1 355)
METEOROLOGICAL DATA AND ATMOSPHERIC DISPERSION CALCULATIONS REQUEST FOR ADDITIONAL INFORMATION The following preliminary questions are based upon information provided in or referenced by Section 2.13.0.5, "Radiological Consequences Calculation," Attachment 5 of the November 13, 2003, letter in support of a license amendment request related to an extended power uprate. If information associated with the following questions is provided in other parts of this submittal or was previously provided on the docket and still applies, please cite appropriate references.
Similarly, if the NRC has previously approved any of the following used in the dose assessment, such as relative concentration (X/Q) values or credit for dual control room intakes, provide reference citations of the approvals.
- 1.
Provide an electronic copy of the hourly meteorological data used to calculate the control room atmospheric dispersion factors as well as the joint frequency distributions used in the PAVAN calculations. The hourly data should be provided either in the format specified in Appendix A to Section 2.7, "Meteorology and Air Quality," of NUREG-1555, 'Environmental Standard Review Plan," or in the ARCON96 format described in NUREG/CR-6331, "Atmospheric Relative Concentrations in Building Wakes." Data may be provided in compressed form, but a method to decompress the data should be provided. What are the heights at which the data were measured? What wind measurement heights were provided as input to the dispersion analyses? Was stability class determined as a function of delta-temperature? If so, which delta-temperature measurement heights were used and how were these measurements converted to stability class (e.g., converted to OC/1 00 meters for comparison to Regulatory Guide 1.23 criteria)? What are the units of wind speed (e.g., miles per hour, meters per second). In generating the hourly meteorological files used as input to ARCON96, did the valid wind direction values range from 10 to 3600 and were invalid data designated by completely filling the field for that parameter with 9's? Page 2.13-12 states that data were obtained from "each of the meteorological towers." Which towers were used to provide what data and how were the data combined in the hourly data files and in the joint frequency distributions used to make the relative concentration (X/Q ) calculations?
- 2.
For control room X/Q calculations, provide a figure or figures showing the assumed locations of release and control room intakes with respect to the overall plant layout.
Provide a quantitative list of all inputs used in estimating the postulated transport of effluent from each of the release locations to the intakes. A copy of the ARCON96 printouts is acceptable to show inputs. Was the physical height of the release location assumed or was an effective release height used in any calculation? If flow rates were assumed when making X/Q calculations, were they based on Technical Specification values? If more than one release to the environment or more than one transport scenario could occur (e.g., loss of offsite power and non-loss of site power, single failure), were comparative X/Q calculations made to ensure consideration of the limiting dose?
X/Q values have been calculated for two intakes. Were the X/Q values used in the dose assessment based upon the more limiting release and intake pair, upon a weighted average (e.g., as described in Regulatory Guide 1.194, "Atmospheric Relative
I - - -
. - I.... I...-.,-- - - -.
- -
I N. Kalv Kalvanam - Brown.wpd Page 2 1 N. KalvKalvanam-Brown.wd Paae 2 H A-_ -
2 Concentrations for Control Room Radiological Habitability Assessments at Nuclear Power Plants"), or some other criteria? If weighted values were used, describe how estimates were calculated, including inflow rates of each intake and any reduction factors (e.g., due to automatic selection of the least contaminated outside air intake).
Provide justification for the use of any reduction factors. If applicable, are control room air intake inflow rates based upon measured values? Confirm that each of the control room intakes meet applicable design criteria of an engineered safeguards feature, including single-failure criterion, missile protection, seismic criteria, and operability technical specifications to merit reduction credit as dual intakes.
- 3.
Provide a list of all inputs and assumptions used in the PAVAN calculations. A copy of the summary pages of the PAVAN outputs is acceptable to show inputs.