License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System, Dated July 23, 2020
ML21210A283
Person / Time
Site: Waterford Entergy icon.png
Issue date: 07/29/2021
From: Gaston R
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
W3F1-2021-0054
Download: ML21210A283 (4)


Text

Entergy Operations, Inc.

1340 Echelon Parkway Jackson, MS 39213 Tel 601-368-5138 Ron Gaston Director, Nuclear Licensing 10 CFR 50.90 W3F1-2021-0054 July 29, 2021 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Subject:

Revised Commitment - License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (CEAC) System Waterford Steam Electric Station, Unit 3 NRC Docket No. 50-382 Renewed Facility Operating License No. NPF-38

References:

Entergy Operations, Inc. letter to U.S. Nuclear Regulatory Commission (NRC),

"License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) system and Control Element Assembly Calculator (CEAC) system," (ADAMS Accession No. ML20205L588), dated July 23, 2020.

In the Referenced letter, Entergy Operations, Inc. (Entergy) submitted a proposed amendment to Appendix A, "Technical Specifications" (TS) of Renewed Facility Operating License No.

NPF-38 for Waterford Steam Electric Station, Unit 3 (Waterford). The proposed change would revise the Waterford TS in order to implement a planned digital instrumentation and control (DI&C) modification at Waterford. The DI&C modification will replace the existing digital minicomputers of the Core Protection Calculator (CPC) system and Control Element Assembly Calculator (CEAC) system with the more reliable, digital system based on the Westinghouse Electric Company (Westinghouse) Common Qualified (Common QTM) Platform.

The referenced license amendment request (LAR) included a List of Regulatory Commitments in Attachment 15, which contained a single commitment. The purpose of this letter is to resubmit the commitment to reference WCAP-16096, Software Program Manual for Common QTM Systems, instead of WCAP-16097, Common Qualified Platform Topical Report. The Enclosure to this letter provides the revised List of Regulatory Commitments.

The No Significant Hazards Consideration determination provided in the referenced submittal is not altered by the information provided in this letter.

W3F1-2021-0054 Page 2 of 2 In accordance with 10 CFR 50.91(b)(1), "Notice for public comment; State consultation," a copy of this letter is being provided to the designated State Official.

Should you have any questions or require additional information, please contact Paul Wood, Regulatory Assurance Manager, Waterford, at (504) 464-3786 or pwood1@entergy.com.

I declare under penalty of perjury, that the foregoing is true and correct. Executed on July 29, 2021.

Respectfully, Ron Gaston RWG/rrd

Enclosure:

List of Regulatory Commitments cc: NRC Region IV Regional Administrator NRC Senior Resident Inspector - Waterford Steam Electric Station, Unit 3 Louisiana Department of Environmental Quality NRC Project Manager Waterford Steam Electric Station, Unit 3

Enclosure W3F1-2021-0054 List of Regulatory Commitments

W3F1-2021-0054 Enclosure Page 1 of 1 List of Regulatory Commitments The following table identifies those actions committed to by Entergy in this document. Any other statements in this submittal are provided for information purposes and are not considered to be regulatory commitments.

Type (check one) Scheduled Commitment One-Time Continuing Completion Action Compliance Date Entergy will evaluate Waterford CPCS Replacement Project Site Acceptance Test (SAT) and Installation Test Plans using the software process testing characteristics 12/17/2021 described in BTP 7-14 Section B.3.2.4. This is Plant-specific Action Item #5 per WCAP-16096, Software Program Manual for Common QTM Systems.