W3F1-2021-0054, License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System, Dated July 23, 2020
Letter Sequence Request | |
---|---|
EPID:L-2020-LLA-0164, Presentation Cpc/Ceac Replacement License Amendment Request - September 22, 2020 (Approved, Closed) | |
Initiation Administration Results Other: ML20255A218, ML20255A239, ML20255A242, ML20255A253, ML20255A257, ML20258A071, ML20258A087, ML20258A088, ML20258A091, ML20258A092, ML21084A255, ML21091A147, ML21160A057, ML21160A085 | |
MONTHYEARML20255A2182018-07-25025 July 2018
[Table View]10 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant (EPID L-2020-LLA-0164) - Redacted Project stage: Other ML20255A2392018-07-25025 July 2018 10 to Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems (EPID L-2020-LLA-0164) - Redacted Project stage: Other ML20255A2422018-07-25025 July 2018 10 to Final Safety Analysis Report, Chapter 6, Engineered Safety Features (EPID L-2020-LLA-0164) - Redacted Project stage: Other ML20255A2572018-07-25025 July 2018 10 to Final Safety Analysis Report, Reference Drawings (EPID L-2020-LLA-0164) - Redacted Project stage: Other ML20255A2532018-07-25025 July 2018 10 to Final Safety Analysis Report, Chapter 12, Radiation Protection (EPID L-2020-LLA-0164) - Redacted Project stage: Other ML20258A0922019-09-11011 September 2019 11 to Final Safety Analysis Report, Reference Drawings (EPID L-2020-LLA-0164) - Redacted Project stage: Other ML20258A0912019-09-11011 September 2019 11 to Final Safety Analysis Report, Chapter 12 - Radiation Protection (EPID L-2020-LLA-0164) - Redacted Project stage: Other ML20258A0882019-09-11011 September 2019 11 to Final Safety Analysis Report, Chapter 06 - Engineered Safety Features (EPID L-2020-LLA-0164) - Redacted Project stage: Other ML20258A0872019-09-11011 September 2019 11 to Final Safety Analysis Report, Chapter 05 - Reactor Coolant System and Connected Systems (EPID L-2020-LLA-0164) - Redacted Project stage: Other ML20258A0712019-09-11011 September 2019 11 to Final Safety Analysis Report, Chapter 01 - Introduction and General Description of Plant - Redacted Project stage: Other W3F1-2020-0038, License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System2020-07-23023 July 2020 License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System Project stage: Request ML20239B0552020-08-26026 August 2020 NRR E-mail Capture - NRC LIC-109 Acceptance Review Results for Waterford U3 Digital Upgrade LAR Project stage: Acceptance Review ML20288A7292020-09-22022 September 2020 Presentation Cpc/Ceac Replacement License Amendment Request - September 22, 2020 Project stage: Request ML20289A2672020-09-22022 September 2020, 22 October 2020 Summary of September 22, 2020, Category 1 Public Meeting Di&C License Amendment Request Project stage: Request ML20265A2872020-10-0101 October 2020 Request for Withholding Information from Public Disclosure Submittals for a Digital Upgrade Project stage: Withholding Request Acceptance ML20268B3242020-10-0101 October 2020 Regulatory Audit in Support of Review of Digital Upgrade License Amendment Request Project stage: Approval PMNS20201184, Partially Closed Meeting with Entergy Operations, Inc. to Discuss a License Amendment Request for a Digital Upgrade at Waterford Steam Electric Station, Unit 32020-10-0707 October 2020 Partially Closed Meeting with Entergy Operations, Inc. to Discuss a License Amendment Request for a Digital Upgrade at Waterford Steam Electric Station, Unit 3 Project stage: Meeting ML20288A7422020-10-22022 October 2020 Summary of September 22, 2020, Meeting License Amendment Request to Install Digital Upgrade (EPID L-2020-LLA-0164) (Non-proprietary Version) Project stage: Meeting PMNS20201234, Partially Closed Meeting with Entergy Operations, Inc. to Discuss a License Amendment Request for a Digital Upgrade at Waterford Steam Electric Station, Unit 32020-10-28028 October 2020 Partially Closed Meeting with Entergy Operations, Inc. to Discuss a License Amendment Request for a Digital Upgrade at Waterford Steam Electric Station, Unit 3 Project stage: Meeting PMNS20201233, Partially Closed Meeting with Entergy Operations, Inc. to Discuss a License Amendment Request for a Digital Upgrade at Waterford Steam Electric Station, Unit 32020-10-28028 October 2020 Partially Closed Meeting with Entergy Operations, Inc. to Discuss a License Amendment Request for a Digital Upgrade at Waterford Steam Electric Station, Unit 3 Project stage: Meeting PMNS20201232, Partially Closed Meeting with Entergy Operations, Inc. to Discuss a License Amendment Request for a Digital Upgrade at Waterford Steam Electric Station, Unit 32020-10-28028 October 2020 Partially Closed Meeting with Entergy Operations, Inc. to Discuss a License Amendment Request for a Digital Upgrade at Waterford Steam Electric Station, Unit 3 Project stage: Meeting PMNS20201195, Partially Closed Meeting with Entergy Operations, Inc. to Discuss a License Amendment Request for a Digital Upgrade at Waterford Steam Electric Station, Unit 32020-10-28028 October 2020 Partially Closed Meeting with Entergy Operations, Inc. to Discuss a License Amendment Request for a Digital Upgrade at Waterford Steam Electric Station, Unit 3 Project stage: Meeting ML20315A2672020-12-17017 December 2020 Summary of October 21,2020, Redacted Category 1 Public Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06,Rev.2, Licensing Processes(NON-PROPRIETARY) Project stage: Meeting ML20325A3212020-12-17017 December 2020 Summary of November 4, 2020, Nonproprietary - Category 1 Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06, Rev. 2, Licensing Processes (Redacted) Project stage: Meeting ML20325A2412020-12-17017 December 2020 Summary of November 18, 2020, REDACTED- Category 1 Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06, Rev. 2, Licensing Processes Project stage: Meeting W3F1-2021-0002, Open Item Response - License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System2021-01-22022 January 2021 Open Item Response - License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System Project stage: Request W3F1-2021-0015, Revised Vendor Oversight Plan Summary - License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System2021-01-29029 January 2021 Revised Vendor Oversight Plan Summary - License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System Project stage: Request PMNS20201419, Partially Closed Meeting with Entergy Operations, Inc. to Discuss a License Amendment Request for a Digital Upgrade at Waterford Steam Electric Station, Unit 32021-02-0505 February 2021 Partially Closed Meeting with Entergy Operations, Inc. to Discuss a License Amendment Request for a Digital Upgrade at Waterford Steam Electric Station, Unit 3 Project stage: Meeting ML21032A0132021-02-19019 February 2021 01/06 and 01/21/2021 Summary of - Category 1 Meetings with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C ISG No. 06, Rev. 2 for Waterford Steam Electric Station Project stage: Meeting ML21039A2682021-02-22022 February 2021 Summary of Category 1 Meetings with Entergy Operations, Inc. LAR to Install Digital Upgrade in Accordance with Digital I&C ISG No. 06, Rev. 2 for Waterford Steam Electric Station, Unit 3 Project stage: Meeting W3F1-2021-0025, Open Item Response - License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System2021-03-0505 March 2021 Open Item Response - License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System Project stage: Request W3F1-2021-0026, Open Item Response, License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System2021-03-19019 March 2021 Open Item Response, License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System Project stage: Request ML21084A2552021-03-22022 March 2021 NRR E-mail Capture - Supplement to Audit Plan Dated October 1, 2020 (Waterford 3, L-2020-LLA-0164) Project stage: Other ML21091A1472021-04-0101 April 2021 Annual Report for Entergy Quality Assurance Program Manual and Indian Point Energy Center Quality Assurance Program Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to Project stage: Other ML21071A2862021-04-0101 April 2021 Summary of Cat. 1 Public Meeting with Entergy Operations,Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital Instrumentation and Control Interim Staff Guidance No.06,Rev.2,Licensing Processes NON-PROPRIETARY Project stage: Meeting ML21075A0322021-04-0202 April 2021 Summary of Redacted - Category 1 Public Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C ISG No. 06, Revision 2, Licensing Processes Project stage: Meeting ML21095A1932021-04-0707 April 2021 Request for Withholding Information from Public Disclosure, Project stage: Withholding Request Acceptance ML21085A8652021-04-0808 April 2021 Summary of March 17, 2021, Category 1 Public Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06, Rev. 2, Licensing Processes (EPID L-2020-LLA-0164) Non Project stage: Meeting ML21090A0022021-04-12012 April 2021 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML21112A2542021-04-29029 April 2021 Request for Additional Information Digital Upgrade to the Core Protection and Control Element Assembly Calculator System (EPID L 2020 Lla 0164) - Redacted Version Project stage: RAI ML21112A2492021-05-0707 May 2021 Summary of April 14, 2021, Redacted - Partially Closed Observation Meeting with Entergy Operations Inc., LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06, Revision 2 (EPID L-2020-LLA-0164) (Non-Pro Project stage: Meeting W3F1-2021-0032, Revised License Amendment Request - Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System2021-05-21021 May 2021 Revised License Amendment Request - Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System Project stage: Request W3F1-2021-0041, Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request for Digital Upgrade to the Core Protection Calculator and Control Element Assembly Calculator System2021-06-0202 June 2021 Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request for Digital Upgrade to the Core Protection Calculator and Control Element Assembly Calculator System Project stage: Request ML21160A0852021-06-0404 June 2021 NRR E-mail Capture - (External_Sender) NRC Notification to the State of Louisiana Regarding a Waterford Steam Electric Station, Unit 3 Amendment - Digital Upgrade I&C Project stage: Other W3F1-2021-0047, Open Item Response - License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System2021-06-21021 June 2021 Open Item Response - License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System Project stage: Request W3F1-2021-0051, Revised Licensing Technical Report for the Common Q Core Protection Calculator System - License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator System and Control Element Assembly Calculator2021-07-19019 July 2021 Revised Licensing Technical Report for the Common Q Core Protection Calculator System - License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator System and Control Element Assembly Calculator Project stage: Request W3F1-2021-0054, License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System, Dated July 23, 20202021-07-29029 July 2021 License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System, Dated July 23, 2020 Project stage: Request ML21203A3532021-08-0909 August 2021 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML21160A0572021-08-16016 August 2021 Summary of Regulatory Audit in Support of Digital Upgrade License Amendment Request (EPID L-2020-LLA-0164)Non-Proprietary Project stage: Other ML21131A2432021-08-24024 August 2021 Issuance of Amendment No. 260 Digital Upgrade to the Core Protection and Control Element Assembly Calculator System Project stage: Approval 2021-03-22 |
ML21210A283 | |
Person / Time | |
---|---|
Site: | Waterford |
Issue date: | 07/29/2021 |
From: | Gaston R Entergy Operations |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
W3F1-2021-0054 | |
Download: ML21210A283 (4) | |
Similar Documents at Waterford | |
---|---|
Category:Letter type:W
MONTHYEARW3F1-2023-0056, Owner'S Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 242023-12-19019 December 2023
[Table view]Owner'S Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 24 W3F1-2023-0055, Reply to a Notice of Violation2023-12-14014 December 2023 Reply to a Notice of Violation W3F1-2023-0052, Core Operating Limits Report (COLR) - Cycle 26, Revision O2023-11-0707 November 2023 Core Operating Limits Report (COLR) - Cycle 26, Revision O W3F1-2023-0049, Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability - Withdrawal2023-09-28028 September 2023 Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability - Withdrawal W3F1-2023-0048, Special Report SR 2023-004-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days2023-09-25025 September 2023 Special Report SR 2023-004-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days W3F1-2023-0035, Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program2023-07-26026 July 2023 Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program W3F1-2023-0036, Special Report SR-2023-003-01 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days2023-05-0404 May 2023 Special Report SR-2023-003-01 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days W3F1-2023-0032, Annual Radioactive Effluent Release Report (ARERR) 20222023-04-27027 April 2023 Annual Radioactive Effluent Release Report (ARERR) 2022 W3F1-2023-0033, Submittal of Annual Radiological Environmental Operating Report - 20222023-04-27027 April 2023 Submittal of Annual Radiological Environmental Operating Report - 2022 W3F1-2023-0025, Annual Report of Individual Monitoring of Radiation Exposure for 2022 Per 10 CFR 20.22062023-04-11011 April 2023 Annual Report of Individual Monitoring of Radiation Exposure for 2022 Per 10 CFR 20.2206 W3F1-2023-0018, Updated Final Supplemental Response to NRC Generic Letter 2004-022023-03-30030 March 2023 Updated Final Supplemental Response to NRC Generic Letter 2004-02 W3F1-2023-0022, Registration of Dry Fuel Storage Cask Use2023-03-22022 March 2023 Registration of Dry Fuel Storage Cask Use W3F1-2023-0021, Submittal of Special Report SR 2023-003-00 Radiation Monitor Inoperable Greater than 7 Days2023-03-17017 March 2023 Submittal of Special Report SR 2023-003-00 Radiation Monitor Inoperable Greater than 7 Days W3F1-2023-0016, Registration of Dry Fuel Storage Cask Use2023-03-0303 March 2023 Registration of Dry Fuel Storage Cask Use W3F1-2023-0014, Reply to a Notice of Violation; EA-22-1192023-02-20020 February 2023 Reply to a Notice of Violation; EA-22-119 W3F1-2023-0013, Notification of Readiness for Supplemental Inspection2023-02-15015 February 2023 Notification of Readiness for Supplemental Inspection W3F1-2023-0007, Registration of Dry Fuel Storage Cask Use2023-02-0606 February 2023 Registration of Dry Fuel Storage Cask Use W3F1-2023-0010, Special Report SR 2023-002-00, Radiation Monitor Inoperable Greater than 7 Days2023-01-25025 January 2023 Special Report SR 2023-002-00, Radiation Monitor Inoperable Greater than 7 Days W3F1-2023-0002, SR 2023-001-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 30 Days2023-01-0505 January 2023 SR 2023-001-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 30 Days W3F1-2022-0067, Commitment Change Notification for Generic Safety Issue 191 and Generic Letter 2004-022022-12-20020 December 2022 Commitment Change Notification for Generic Safety Issue 191 and Generic Letter 2004-02 W3F1-2022-0054, Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability2022-11-0101 November 2022 Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability W3F1-2022-0063, Submittal of Emergency Preparedness Documents. Includes EP-001-001, Revision 372022-10-27027 October 2022 Submittal of Emergency Preparedness Documents. Includes EP-001-001, Revision 37 W3F1-2022-0059, Response to Clarification Questions Concerning Supplement to License Amendment Request to Adopt TSTF-5052022-10-13013 October 2022 Response to Clarification Questions Concerning Supplement to License Amendment Request to Adopt TSTF-505 W3F1-2022-0058, Reply to a Notice of Violation; EA-22-0332022-10-12012 October 2022 Reply to a Notice of Violation; EA-22-033 W3F1-2022-0049, Response to Request for Additional Information Regarding License Amendment Requests to Adopt 10 CFR 50.69 and TSTF-5052022-08-19019 August 2022 Response to Request for Additional Information Regarding License Amendment Requests to Adopt 10 CFR 50.69 and TSTF-505 W3F1-2022-0037, Submittal of Owner'S Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 242022-08-0808 August 2022 Submittal of Owner'S Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 24 W3F1-2022-0044, SR-2022-004-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days2022-07-0606 July 2022 SR-2022-004-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days W3F1-2022-0042, SR-22-003-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days2022-06-27027 June 2022 SR-22-003-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days W3F1-2022-0015, Response to Request for Additional Information to License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk Informed Extended Completion Times - Ritstf.2022-05-16016 May 2022 Response to Request for Additional Information to License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk Informed Extended Completion Times - Ritstf. W3F1-2022-0026, Report of Facility Changes, Tests, and Experiments and Commitment Changes for Two Year Period Ending April 28, 20222022-04-28028 April 2022 Report of Facility Changes, Tests, and Experiments and Commitment Changes for Two Year Period Ending April 28, 2022 W3F1-2022-0028, Annual Radiological Environmental Operating Report - 20212022-04-26026 April 2022 Annual Radiological Environmental Operating Report - 2021 W3F1-2022-0029, Annual Report of Individual Monitoring of Radiation Exposure for 2021 Per 10 CFR 20.22062022-04-26026 April 2022 Annual Report of Individual Monitoring of Radiation Exposure for 2021 Per 10 CFR 20.2206 W3F1-2022-0009, Supplement to Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors2022-04-25025 April 2022 Supplement to Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors W3F1-2022-0031, Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule to Reflect Location of Standby Capsules 3/W-104 and 6/W-2842022-04-25025 April 2022 Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule to Reflect Location of Standby Capsules 3/W-104 and 6/W-284 W3F1-2022-0020, Review of Preliminary Accident Sequence Precursor Report2022-04-11011 April 2022 Review of Preliminary Accident Sequence Precursor Report W3F1-2022-0017, Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 20212022-04-0707 April 2022 Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 2021 W3F1-2022-0019, WAT-2022-02 Post Exam Analysis2022-03-0909 March 2022 WAT-2022-02 Post Exam Analysis W3F1-2022-0011, Special Report SR-22-002-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days2022-02-0808 February 2022 Special Report SR-22-002-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days W3F1-2022-0008, SR-22-001-00, Waterford Steam Electric Station, Unit 3, Radiation Monitors Inoperable Greater than 7 Days2022-02-0101 February 2022 SR-22-001-00, Waterford Steam Electric Station, Unit 3, Radiation Monitors Inoperable Greater than 7 Days W3F1-2021-0074, Commitment Change Notification for Generic Safety Issue - 191 and Generic Letter 2004-022021-12-16016 December 2021 Commitment Change Notification for Generic Safety Issue - 191 and Generic Letter 2004-02 W3F1-2021-0064, Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule to Support Relocation of Capsules 104 and 2842021-11-30030 November 2021 Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule to Support Relocation of Capsules 104 and 284 W3F1-2021-0061, Supplement to License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to Technical Requirements Manual2021-10-14014 October 2021 Supplement to License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to Technical Requirements Manual W3F1-2021-0063, Request for One-Time Exemption from 10 CFR 50, Appendix E Biennial Emergency Preparedness Evaluated Exercise Requirements Due to Severe Storm Recovery2021-10-12012 October 2021 Request for One-Time Exemption from 10 CFR 50, Appendix E Biennial Emergency Preparedness Evaluated Exercise Requirements Due to Severe Storm Recovery W3F1-2021-0050, Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request to Adopt2021-10-0101 October 2021 Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request to Adopt W3F1-2021-0060, Response to Request for Additional Information Regarding License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to Technical Requirements Manual2021-09-30030 September 2021 Response to Request for Additional Information Regarding License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to Technical Requirements Manual W3F1-2021-0039, Application for Technical Specification Change to Revise Pressure/Temperature and Low Temperature Overpressure Protection for 55 Effective Full Power Years2021-08-25025 August 2021 Application for Technical Specification Change to Revise Pressure/Temperature and Low Temperature Overpressure Protection for 55 Effective Full Power Years W3F1-2021-0055, Supplement to License Amendment Request to Relocate Boration Systems Technical Specifications to the Technical Requirements Manual2021-08-20020 August 2021 Supplement to License Amendment Request to Relocate Boration Systems Technical Specifications to the Technical Requirements Manual W3F1-2021-0057, (Waterford 3) - Emergency Plan Revision 0522021-08-18018 August 2021 (Waterford 3) - Emergency Plan Revision 052 W3F1-2021-0054, License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System, Dated July 23, 20202021-07-29029 July 2021 License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System, Dated July 23, 2020 W3F1-2021-0051, Revised Licensing Technical Report for the Common Q Core Protection Calculator System - License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator System and Control Element Assembly Calculator2021-07-19019 July 2021 Revised Licensing Technical Report for the Common Q Core Protection Calculator System - License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator System and Control Element Assembly Calculator 2023-09-28 Category:License-Application for Construction Permit DKT 50 MONTHYEARW3F1-2021-0054, License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System, Dated July 23, 20202021-07-29029 July 2021
[Table view]License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System, Dated July 23, 2020 2021-07-29 |
Text
Entergy Operations, Inc.
1340 Echelon Parkway Jackson, MS 39213 Tel 601-368-5138 Ron Gaston Director, Nuclear Licensing 10 CFR 50.90 W3F1-2021-0054 July 29, 2021 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Subject:
Revised Commitment - License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (CEAC) System Waterford Steam Electric Station, Unit 3 NRC Docket No. 50-382 Renewed Facility Operating License No. NPF-38
References:
Entergy Operations, Inc. letter to U.S. Nuclear Regulatory Commission (NRC),
"License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) system and Control Element Assembly Calculator (CEAC) system," (ADAMS Accession No. ML20205L588), dated July 23, 2020.
In the Referenced letter, Entergy Operations, Inc. (Entergy) submitted a proposed amendment to Appendix A, "Technical Specifications" (TS) of Renewed Facility Operating License No.
NPF-38 for Waterford Steam Electric Station, Unit 3 (Waterford). The proposed change would revise the Waterford TS in order to implement a planned digital instrumentation and control (DI&C) modification at Waterford. The DI&C modification will replace the existing digital minicomputers of the Core Protection Calculator (CPC) system and Control Element Assembly Calculator (CEAC) system with the more reliable, digital system based on the Westinghouse Electric Company (Westinghouse) Common Qualified (Common QTM) Platform.
The referenced license amendment request (LAR) included a List of Regulatory Commitments in Attachment 15, which contained a single commitment. The purpose of this letter is to resubmit the commitment to reference WCAP-16096, Software Program Manual for Common QTM Systems, instead of WCAP-16097, Common Qualified Platform Topical Report. The Enclosure to this letter provides the revised List of Regulatory Commitments.
The No Significant Hazards Consideration determination provided in the referenced submittal is not altered by the information provided in this letter.
W3F1-2021-0054 Page 2 of 2 In accordance with 10 CFR 50.91(b)(1), "Notice for public comment; State consultation," a copy of this letter is being provided to the designated State Official.
Should you have any questions or require additional information, please contact Paul Wood, Regulatory Assurance Manager, Waterford, at (504) 464-3786 or pwood1@entergy.com.
I declare under penalty of perjury, that the foregoing is true and correct. Executed on July 29, 2021.
Respectfully, Ron Gaston RWG/rrd
Enclosure:
List of Regulatory Commitments cc: NRC Region IV Regional Administrator NRC Senior Resident Inspector - Waterford Steam Electric Station, Unit 3 Louisiana Department of Environmental Quality NRC Project Manager Waterford Steam Electric Station, Unit 3
Enclosure W3F1-2021-0054 List of Regulatory Commitments
W3F1-2021-0054 Enclosure Page 1 of 1 List of Regulatory Commitments The following table identifies those actions committed to by Entergy in this document. Any other statements in this submittal are provided for information purposes and are not considered to be regulatory commitments.
Type (check one) Scheduled Commitment One-Time Continuing Completion Action Compliance Date Entergy will evaluate Waterford CPCS Replacement Project Site Acceptance Test (SAT) and Installation Test Plans using the software process testing characteristics 12/17/2021 described in BTP 7-14 Section B.3.2.4. This is Plant-specific Action Item #5 per WCAP-16096, Software Program Manual for Common QTM Systems.