Letter Sequence Other |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request
- Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Results
Other: ML040300802, ML040631055, ML042520157, ML042670485, ML050870511, ML051090111, W3F1-2004-0085, Schedule Clarification for Amendment Request NPF-38-249, Extended Power Uprate, W3F1-2004-0101, to Amendment Request NPF-38-256, Alternate Source Term, Waterford Steam Electric Station, Unit 3
|
MONTHYEARML0401405152004-01-14014 January 2004 Meeting with Entergy, Waterford Steam Electric Station, Unit 3 Extended Power Uprate Amendment Request Dated 11/13/2003 Project stage: Meeting ML0425201572004-01-14014 January 2004 E-mail to T. Alexion Dated 1/14/04 Waterford - Extended Power Uprate Project stage: Other ML0403008022004-01-28028 January 2004 FRN -Notice of Consideration of Issuance of Amendment for Extended Power Uprate and Opportunity for Hearing Project stage: Other ML0403302602004-01-28028 January 2004 1/28/04 Waterford 3 - RAI Revision to Facility Operating License & TS - Extended Power Uprate Request. TAC MC1355 Project stage: RAI W3F1-2004-0004, Supplemental Information Extended Power Uprate - Power Ascension Testing2004-01-29029 January 2004 Supplemental Information Extended Power Uprate - Power Ascension Testing Project stage: Request ML0425201642004-01-30030 January 2004 E-mail Dated 1/30/04 RAI from Environmental Section on Waterford Unit 3 Project stage: RAI ML0425201672004-02-10010 February 2004 E-mail Dated 2/10/04 Waterford - Draft RAI from Human Performance, Piping Integrity and Electrical Groups Project stage: Draft RAI ML0425201702004-02-18018 February 2004 E-mail Dated 2/18/04 Re RAI from I&C - Waterford Project stage: RAI ML0405506052004-02-20020 February 2004 Westinghouse Request Withholding from Public Disclosure, Waterford 3, Extended Power Uprate, Appendix 1 - Safety Evaluation Report Compliance, MC1355 Project stage: Approval ML0425201712004-02-23023 February 2004 E-mail Dated 2/23/04 Waterford RAI Containment Systems Project stage: RAI ML0406310552004-02-26026 February 2004 Summary of Entergy Operations, Inc. Presentation of Extended Power Uprate Project stage: Other ML0426704892004-03-0202 March 2004 E-mail from B. Miller to N. Kalyanam RAI from SPLB-Angelo Stubbs Project stage: RAI ML0426704852004-03-0202 March 2004 E-mail from D. Miller to K. Kalyanam Re RAI from J. Tsao Project stage: Other W3F1-2004-0017, Supplement to Amendment Request NPF-38-249 Regarding Extended Power Uprate2004-03-0404 March 2004 Supplement to Amendment Request NPF-38-249 Regarding Extended Power Uprate Project stage: Supplement ML0406909622004-03-0909 March 2004 Extended Power Uprate Acceptance Review Project stage: Acceptance Review ML0407809952004-03-16016 March 2004 RAI, Proposed Revision to Facility Operation License and TSs - Extended Power Uprate Request Project stage: RAI ML0408506542004-03-24024 March 2004 RAI Related to Revision to Facility Operating License and TSs - Extended Power Uprate Request Project stage: RAI ML0412102452004-03-26026 March 2004 Request for Additional Information, Revision to Facility Operating License & Technical Specifications - Extended Power Uprate Request Project stage: RAI ML0409102392004-03-31031 March 2004 RAI Related to Revision to Facility Operating License and TSs - Extended Power Uprate Request Project stage: RAI ML0410005142004-04-0808 April 2004 RAI Related to Revision to Facility Operating License and TSs - Extended Power Uprate Request Project stage: RAI W3F1-2004-0029, Extended Power Uprate, Waterford, Unit 3 Supplement to Amendment Request2004-04-15015 April 2004 Extended Power Uprate, Waterford, Unit 3 Supplement to Amendment Request Project stage: Supplement ML0411301942004-04-20020 April 2004 RAI Related to Revision to Facility Operating License and TSs - Extended Power Uprate Request Project stage: RAI ML0412705672004-05-0404 May 2004 RAI, Revision to Facility Operating License and TSs - Extended Power Uprate Request Project stage: RAI W3F1-2004-0035, Supplemental to Amendment Request for Extended Power Uprate2004-05-0707 May 2004 Supplemental to Amendment Request for Extended Power Uprate Project stage: Supplement W3F1-2004-0037, Supplement to Amendment Request NPF-38-249, Extended Power Uprate2004-05-12012 May 2004 Supplement to Amendment Request NPF-38-249, Extended Power Uprate Project stage: Supplement ML0413801452004-05-13013 May 2004 Supplement to Amendment Request NPF-38-249, Extended Power Uprate Project stage: Supplement W3F1-2004-0043, Supplement to Amendment Request NPF-38-249, Extended Power Uprate2004-05-21021 May 2004 Supplement to Amendment Request NPF-38-249, Extended Power Uprate Project stage: Supplement W3F1-2004-0047, Supplement to Amendment Request NPF-38-249, Extended Power Uprate2004-05-26026 May 2004 Supplement to Amendment Request NPF-38-249, Extended Power Uprate Project stage: Supplement ML0417405772004-06-21021 June 2004 RAI, Revision to Facility Operating License and Technical Specifications - Extended Power Uprate Request, TAC MC1355 Project stage: RAI W3F1-2004-0052, Supplement to Amendment Request NPF-38-249, Extended Power Uprate2004-07-14014 July 2004 Supplement to Amendment Request NPF-38-249, Extended Power Uprate Project stage: Supplement ML0420202942004-07-15015 July 2004 License Amendment Request NPF-38-256, Alternate Source Term Project stage: Request W3F1-2004-0061, Supplement to Amendment Request NPF-38-249, Extended Power Uprate2004-07-28028 July 2004 Supplement to Amendment Request NPF-38-249, Extended Power Uprate Project stage: Supplement ML0421100882004-07-29029 July 2004 Meeting with Entergy to Discuss Issues with Extended Power Uprate and Alternate Source Term Submittals Project stage: Request ML0422303352004-08-10010 August 2004 August 11, 12 and 13, 2004 Meeting with Westinghouse Re Waterford Main Steam Line Break, Feedwater Line Break and EPU Project stage: Meeting W3F1-2004-0068, Supplement to Amendment Request NPF-38-249 Extended Power Uprate2004-08-10010 August 2004 Supplement to Amendment Request NPF-38-249 Extended Power Uprate Project stage: Supplement W3F1-2004-0071, Supplement to Alternate Source Term Submittal2004-08-19019 August 2004 Supplement to Alternate Source Term Submittal Project stage: Request ML0423904892004-08-26026 August 2004 Meeting with Entergy to Discuss Issues with Extended Power Uprate and Alternate Source Term Submittals Project stage: Meeting W3F1-2004-0076, Supplement 2 to Amendment Request NPF-38-256, Alternate Source Term2004-09-0101 September 2004 Supplement 2 to Amendment Request NPF-38-256, Alternate Source Term Project stage: Supplement W3F1-2004-0078, Supplement to Amendment Request NPF-38-249, Extended Power Uprate2004-09-14014 September 2004 Supplement to Amendment Request NPF-38-249, Extended Power Uprate Project stage: Supplement ML0427505192004-09-29029 September 2004 RAI Extended Power Uprate Request and Alternate Source Term Request Project stage: RAI ML0427402482004-09-30030 September 2004 (3) Steam Elecric Station, #3, Draft EA and Finding of No Significant Impact Related to a Proposed License Amendment to Increase the Licensed Power Level (Tac. MC1355) Project stage: Draft Other W3F1-2004-0092, Supplement to Amendment Request NPF-38-249 Extended Power Uprate2004-10-0808 October 2004 Supplement to Amendment Request NPF-38-249 Extended Power Uprate Project stage: Supplement W3F1-2004-0086, Supplement to Amendment Request NPF-38-249, Extended Power Uprate2004-10-0808 October 2004 Supplement to Amendment Request NPF-38-249, Extended Power Uprate Project stage: Supplement W3F1-2004-0085, Schedule Clarification for Amendment Request NPF-38-249, Extended Power Uprate2004-10-13013 October 2004 Schedule Clarification for Amendment Request NPF-38-249, Extended Power Uprate Project stage: Other W3F1-2004-0095, Supplement 3 to Amendment Request NPF-38-256 Alternate Source Term2004-10-13013 October 2004 Supplement 3 to Amendment Request NPF-38-256 Alternate Source Term Project stage: Supplement W3F1-2004-0096, Supplement to Amendment Request NPF-38-249, Extended Power Uprate2004-10-18018 October 2004 Supplement to Amendment Request NPF-38-249, Extended Power Uprate Project stage: Supplement W3F1-2004-0101, to Amendment Request NPF-38-256, Alternate Source Term, Waterford Steam Electric Station, Unit 32004-10-19019 October 2004 to Amendment Request NPF-38-256, Alternate Source Term, Waterford Steam Electric Station, Unit 3 Project stage: Other ML0430102382004-10-21021 October 2004 Supplement to Amendment Request NPF-38-249, Extended Power Uprate Project stage: Supplement ML0431006112004-10-26026 October 2004 RAI - Revision to Facility Operating License and Technical Specifications - Extended Power Uprate Request Project stage: RAI W3F1-2004-0089, Supplement to Amendment Request NPF-38-2492004-10-29029 October 2004 Supplement to Amendment Request NPF-38-249 Project stage: Supplement 2004-03-04
[Table View] |
|
---|
Category:Letter type:W
MONTHYEARW3F1-2024-0049, Notification of Readiness for Supplemental Inspection2024-10-21021 October 2024 Notification of Readiness for Supplemental Inspection W3F1-2024-0042, License Amendment Request to Extend Allowable Outage Times for One or More Control Room Air Conditioning Units Inoperable2024-10-16016 October 2024 License Amendment Request to Extend Allowable Outage Times for One or More Control Room Air Conditioning Units Inoperable W3F1-2024-0038, Response to Request for Additional Information - Proposed Alternative WF3-RR-24-01 for Examinations of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2024-09-24024 September 2024 Response to Request for Additional Information - Proposed Alternative WF3-RR-24-01 for Examinations of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds W3F1-2024-0039, Response to Request for Additional Information - Proposed Alternative WF3-RR-24-02 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles2024-09-24024 September 2024 Response to Request for Additional Information - Proposed Alternative WF3-RR-24-02 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles W3F1-2024-0041, Reply to a Notice of Violation, EA-24-0522024-09-19019 September 2024 Reply to a Notice of Violation, EA-24-052 W3F1-2024-0040, Special Report SR 2024-001-00 Radiation Monitor Inoperable Greater than 7 Days2024-09-0303 September 2024 Special Report SR 2024-001-00 Radiation Monitor Inoperable Greater than 7 Days W3F1-2024-0019, (Waterford 3) - Steam Generator Tube Inspection Report for the 25th Rf Inspection Performed During Operating Cycle 25 / Refuel 252024-07-22022 July 2024 (Waterford 3) - Steam Generator Tube Inspection Report for the 25th Rf Inspection Performed During Operating Cycle 25 / Refuel 25 W3F1-2024-0032, Completion of License Renewal Activities Prior to Entering the Period of Extended Operation2024-07-17017 July 2024 Completion of License Renewal Activities Prior to Entering the Period of Extended Operation W3F1-2024-0024, Special Report SR 2023-004-02 Radiation Monitor Inoperable Greater than 7 Days2024-06-17017 June 2024 Special Report SR 2023-004-02 Radiation Monitor Inoperable Greater than 7 Days W3F1-2024-0011, Licensee Amendment Request to Modify Surveillance Requirements in Support of Surveillance Frequency Control Program2024-05-0808 May 2024 Licensee Amendment Request to Modify Surveillance Requirements in Support of Surveillance Frequency Control Program W3F1-2024-0018, Submittal of Owners Activity Report Form for Inservice Inspection Performed During Operating Cycle 25 / Refuel 252024-05-0101 May 2024 Submittal of Owners Activity Report Form for Inservice Inspection Performed During Operating Cycle 25 / Refuel 25 W3F1-2024-0014, Report of Facility Changes, Tests, and Experiments and Commitment Changes for Two Year Period Ending April 28, 20242024-04-29029 April 2024 Report of Facility Changes, Tests, and Experiments and Commitment Changes for Two Year Period Ending April 28, 2024 W3F1-2024-0015, Annual Radioactive Effluent Release Report (ARERR) 2023 with Revised ODCM and Revised Process Control Program Procedure2024-04-24024 April 2024 Annual Radioactive Effluent Release Report (ARERR) 2023 with Revised ODCM and Revised Process Control Program Procedure W3F1-2024-0016, Annual Radiological Environmental Operating Report (AREOR) - 20232024-04-24024 April 2024 Annual Radiological Environmental Operating Report (AREOR) - 2023 W3F1-2024-0017, Annual Report of Individual Monitoring of Radiation Exposure for 2023 Per 10 CFR 20.22062024-04-23023 April 2024 Annual Report of Individual Monitoring of Radiation Exposure for 2023 Per 10 CFR 20.2206 W3F1-2024-0020, Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 20232024-04-11011 April 2024 Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 2023 W3F1-2024-0008, Proposed Alternative WF3-RR-24-01 for Examinations of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2024-03-18018 March 2024 Proposed Alternative WF3-RR-24-01 for Examinations of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds W3F1-2024-0009, Proposed Alternative WF3-RR-24-02 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles2024-03-18018 March 2024 Proposed Alternative WF3-RR-24-02 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles W3F1-2024-0012, Response to NRC Integrated Inspection Report 05000382/20230042024-03-11011 March 2024 Response to NRC Integrated Inspection Report 05000382/2023004 W3F1-2024-0006, Special Report SR-2023-004-01, Radiation Monitor Inoperable Greater than 7 Days2024-02-28028 February 2024 Special Report SR-2023-004-01, Radiation Monitor Inoperable Greater than 7 Days W3F1-2023-0056, Owners Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 242023-12-19019 December 2023 Owners Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 24 W3F1-2023-0055, Reply to a Notice of Violation2023-12-14014 December 2023 Reply to a Notice of Violation W3F1-2023-0052, Core Operating Limits Report (COLR) - Cycle 26, Revision O2023-11-0707 November 2023 Core Operating Limits Report (COLR) - Cycle 26, Revision O W3F1-2023-0049, Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability - Withdrawal2023-09-28028 September 2023 Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability - Withdrawal W3F1-2023-0048, Special Report SR 2023-004-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days2023-09-25025 September 2023 Special Report SR 2023-004-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days W3F1-2023-0035, Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program2023-07-26026 July 2023 Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program W3F1-2023-0036, Special Report SR-2023-003-01 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days2023-05-0404 May 2023 Special Report SR-2023-003-01 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days W3F1-2023-0032, Annual Radioactive Effluent Release Report (ARERR) 20222023-04-27027 April 2023 Annual Radioactive Effluent Release Report (ARERR) 2022 W3F1-2023-0033, Submittal of Annual Radiological Environmental Operating Report - 20222023-04-27027 April 2023 Submittal of Annual Radiological Environmental Operating Report - 2022 W3F1-2023-0025, Annual Report of Individual Monitoring of Radiation Exposure for 2022 Per 10 CFR 20.22062023-04-11011 April 2023 Annual Report of Individual Monitoring of Radiation Exposure for 2022 Per 10 CFR 20.2206 W3F1-2023-0018, Updated Final Supplemental Response to NRC Generic Letter 2004-022023-03-30030 March 2023 Updated Final Supplemental Response to NRC Generic Letter 2004-02 W3F1-2023-0022, Registration of Dry Fuel Storage Cask Use2023-03-22022 March 2023 Registration of Dry Fuel Storage Cask Use W3F1-2023-0021, Submittal of Special Report SR 2023-003-00 Radiation Monitor Inoperable Greater than 7 Days2023-03-17017 March 2023 Submittal of Special Report SR 2023-003-00 Radiation Monitor Inoperable Greater than 7 Days W3F1-2023-0016, Registration of Dry Fuel Storage Cask Use2023-03-0303 March 2023 Registration of Dry Fuel Storage Cask Use W3F1-2023-0014, Reply to a Notice of Violation; EA-22-1192023-02-20020 February 2023 Reply to a Notice of Violation; EA-22-119 W3F1-2023-0013, Notification of Readiness for Supplemental Inspection2023-02-15015 February 2023 Notification of Readiness for Supplemental Inspection W3F1-2023-0007, Registration of Dry Fuel Storage Cask Use2023-02-0606 February 2023 Registration of Dry Fuel Storage Cask Use W3F1-2023-0010, Special Report SR 2023-002-00, Radiation Monitor Inoperable Greater than 7 Days2023-01-25025 January 2023 Special Report SR 2023-002-00, Radiation Monitor Inoperable Greater than 7 Days W3F1-2023-0002, SR 2023-001-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 30 Days2023-01-0505 January 2023 SR 2023-001-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 30 Days W3F1-2022-0067, Commitment Change Notification for Generic Safety Issue – 191 and Generic Letter 2004-022022-12-20020 December 2022 Commitment Change Notification for Generic Safety Issue – 191 and Generic Letter 2004-02 W3F1-2022-0054, Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability2022-11-0101 November 2022 Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability W3F1-2022-0063, Submittal of Emergency Preparedness Documents. Includes EP-001-001, Revision 372022-10-27027 October 2022 Submittal of Emergency Preparedness Documents. Includes EP-001-001, Revision 37 W3F1-2022-0059, Response to Clarification Questions Concerning Supplement to License Amendment Request to Adopt TSTF-5052022-10-13013 October 2022 Response to Clarification Questions Concerning Supplement to License Amendment Request to Adopt TSTF-505 W3F1-2022-0058, Reply to a Notice of Violation; EA-22-0332022-10-12012 October 2022 Reply to a Notice of Violation; EA-22-033 W3F1-2022-0049, Response to Request for Additional Information Regarding License Amendment Requests to Adopt 10 CFR 50.69 and TSTF-5052022-08-19019 August 2022 Response to Request for Additional Information Regarding License Amendment Requests to Adopt 10 CFR 50.69 and TSTF-505 W3F1-2022-0037, Submittal of Owners Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 242022-08-0808 August 2022 Submittal of Owners Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 24 W3F1-2022-0044, SR-2022-004-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days2022-07-0606 July 2022 SR-2022-004-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days W3F1-2022-0042, SR-22-003-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days2022-06-27027 June 2022 SR-22-003-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days W3F1-2022-0015, Response to Request for Additional Information to License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk Informed Extended Completion Times - Ritstf.2022-05-16016 May 2022 Response to Request for Additional Information to License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk Informed Extended Completion Times - Ritstf. W3F1-2022-0026, Report of Facility Changes, Tests, and Experiments and Commitment Changes for Two Year Period Ending April 28, 20222022-04-28028 April 2022 Report of Facility Changes, Tests, and Experiments and Commitment Changes for Two Year Period Ending April 28, 2022 2024-09-03
[Table view] |
Text
Entergy Nuclear South Entergy Operations, Inc.
17265 River Road Entergy Killona, LA 70057 Tel 504 739 6440 Fax 504 739 6698 kpeters~entergy corn Ken Peters Director, Nuclear Safety Assurance Waterford 3 W3F1 -2004-0085 October 13, 2004 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
SUBJECT:
Schedule Clarification for Amendment Request NPF-38-249, Extended Power Uprate Waterford Steam Electric Station, Unit 3 Docket No. 50-382 License No. NPF-38
REFERENCES:
- 1. Entergy Letter dated November 13, 2003, "License Amendment Request NPF-38-249 Extended Power Uprate"
- 2. Entergy Letter dated July 15, 2004, "License Amendment Request NPF-38-256 Alternate Source Term"
- 3. NRC Meeting Summary dated August 26, 2004, "Summary of August 12, 2004, Meeting with Entergy Operations, Inc. on Extended Power Uprate (EPU) and Alternate Source Term (AST) Issues (TAC No.
MC1 355)"
Dear Sir or Madam:
By letter (Reference 1), Entergy Operations, Inc. (Entergy) proposed a change to the Waterford Steam Electric Station, Unit 3 (Waterford 3) Operating License and Technical Specifications to increase the unit's rated thermal power level from 3441 megawatts thermal (MWt) to 3716 MWt. In that letter, Entergy requested approval by January, 2005. Entergy's request was accepted as complete and the NRC review began in late January 2004.
Since making the initial Extended Power Uprate (EPU) submittal, Entergy has completed control room in-leakage testing in response to Generic Letter 2003-01, Control Room Habitability. Based on the results of that testing, Entergy has determined that an Alternative Source Term (AST) in accordance with 10 CFR 50.67 must be applied to achieve acceptable control room dose results for EPU. Entergy met with the NRC on August 12, 2004 (see Reference 3) to discuss the need and plans for the AST submittal to support control room habitability under power uprate conditions. The AST license amendment request was submitted in Reference 2. In addition, Waterford 3 has recently identified that revision of the diesel generator fuel oil storage technical specifications will also be needed. This change has been discussed with the NRC staff and is to be submitted by October 22, 2004.
It has been the Waterford 3 plan to implement the EPU during the Spring 2005 outage.
Entergy recognizes that the recent need to request additional changes in support of our uprate challenges the review schedule, which had been based on receipt of a complete submittal in January 2004. NRC approval of the amendment request by March 31, 2005 will support our implementation plans during the outage. Your prompt review and approval of 1 - ::
W3Fl -2004-0085 Page 2 of 3 these changes are important to our outage plans and preparation. The schedule delay can be somewhat mitigated by continued good communications regarding the progress of the review and the early identification of any potential concerns.
The submittal includes one new commitment as summarized in the attachment. If you have any questions or require additional information, please contact D. Bryan Miller at 504-739-6692.
Sincerely,
Attachment:
List of Regulatory Commitments
W3F1 -2004-0085 Page 3 of 3 cc: Dr. Bruce S. Mallett U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 NRC Senior Resident Inspector Waterford 3 P.O. Box 822 Killona, LA 70066-0751 U.S. Nuclear Regulatory Commission Attn: Mr. Nageswaran Kalyanam MS O-7D1 Washington, DC 20555-0001 Wise, Carter, Child & Caraway Attn: J. Smith P.O. Box 651 Jackson, MS 39205 Winston & Strawn Attn: N.S. Reynolds 1400 L Street, NW Washington, DC 20005-3502 Louisiana Department of Environmental Quality Office of Environmental Compliance Surveillance Division P. O. Box 4312 Baton Rouge, LA 70821-4312 American Nuclear Insurers Attn: Library Town Center Suite 300S 29th S. Main Street West Hartford, CT 06107-2445
Attachment To W3FI -2004-0085 List of Regulatory Commitments
Attachment W3F1F-2004-0085 Page 1 of 1 List of Regulatory Commitments The following table identifies those actions committed to by Entergy in this document. Any other statements in this submittal are provided for information purposes and are not considered to be regulatory commitments.
TYPE (Ch ck one) SCHEDULED ONE-TIME CONTINUING COMPLETION COMMITMENT ACTION COMPLIANCE DATE (If Required)
In addition, Waterford 3 has recently identified that revision of the diesel generator fuel oil storage technical specifications will also be X 10/22/04 needed. This change has been discussed with the NRC staff and is to be submitted by October 22, 2004.