May 4, 2004 Mr. Joseph E. Venable Vice President Operations Entergy Operations, Inc.

17265 River Road Killona, LA 70066-0751

SUBJECT:

WATERFORD STEAM ELECTRIC STATION, UNIT 3 (WATERFORD 3) -

REQUEST FOR ADDITIONAL INFORMATION RELATED TO REVISION TO FACILITY OPERATING LICENSE AND TECHNICAL SPECIFICATIONS -

EXTENDED POWER UPRATE REQUEST (TAC NO. MC1355)

Dear Mr. Venable:

By letter dated November 13, 2003, and supplemented by letters dated January 29 and March 4, 2004, Entergy Operations, Inc. proposed revisions to the Waterford 3 operating license and Technical Specifications which would allow an increase in the rated power from 3,441 megawatts thermal (MWt) to 3,716 MWt.

After reviewing your request, the Nuclear Regulatory Commission staff has determined that additional information is required to complete the review. We discussed this information with your staff by telephone and they agreed to provide the additional information requested in the enclosure within 30 days of receipt of this letter.

If you have any questions, please call me at (301) 415-1480.

Sincerely,

/RA/

N. Kalyanam, Project Manager, Section 1 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-382

Enclosure:

Request for Additional Information cc w/encl: See next page

May 4, 2004 Mr. Joseph E. Venable Vice President Operations Entergy Operations, Inc.

17265 River Road Killona, LA 70066-0751

SUBJECT:

WATERFORD STEAM ELECTRIC STATION, UNIT 3 (WATERFORD 3) -

REQUEST FOR ADDITIONAL INFORMATION RELATED TO REVISION TO FACILITY OPERATING LICENSE AND TECHNICAL SPECIFICATIONS -

EXTENDED POWER UPRATE REQUEST (TAC NO. MC1355)

Dear Mr. Venable:

By letter dated November 13, 2003, and supplemented by letters dated January 29 and March 4, 2004, Entergy Operations, Inc. proposed revisions to the Waterford 3 operating license and Technical Specifications which would allow an increase in the rated power from 3,441 megawatts thermal (MWt) to 3,716 MWt.

After reviewing your request, the Nuclear Regulatory Commission staff has determined that additional information is required to complete the review. We discussed this information with your staff by telephone and they agreed to provide the additional information requested in the enclosure within 30 days of receipt of this letter.

If you have any questions, please call me at (301) 415-1480.

Sincerely,

/RA/

N. Kalyanam, Project Manager, Section 1 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-382

Enclosure:

Request for Additional Information cc w/encl: See next page DISTRIBUTION PUBLIC PDIV-1 r/f RidsOgcRp RidsAcrsAcnwMailCenter RidsNrrDlpmLpdiv1 (RGramm)

RidsNrrPMNKalyanam RidsNrrLADJohnson RidsRgn4MailCenter (AHowell)

MMItchell/JMedoff RidsNrrDlpmDpr RidsNrrDeDpr RidsNrrDssaDpr RidsNrrLADBaxley RidsNrrLADJohnson Accession No.: ML041270567

  • RAI input from the staff without any major change OFFICE PDIV-1/PM PDIV-1/LA DE/EMCB A PDIV-1/SC NAME NKalyanam DBaxley MMitchell/JMedoff RGramm DATE 5/4/04 5/4/04 5/4/04 5/4/04 OFFICIAL COPY

ENCLOSURE REQUEST FOR ADDITIONAL INFORMATION ENTERGY OPERATIONS, INC. (ENTERGY)

WATERFORD STEAM ELECTRIC STATION, UNIT 3 (WATERFORD 3)

DOCKET NO. 50-382 The U.S. Nuclear Regulatory Commission (NRC) Review Standard, NRR-RS-001, Revision 0, Review Standard for Extended Power Uprates (December 2003), provides the staffs standard review plan for the evaluation of license amendment requests for increasing power above 5 percent of the current core thermal power rated for a U.S. light-water reactor. Note 1 in Matrix 1 of Section 2.1 of NRR-RS-001, Revision 0, indicates that guidance on the neutron irradiation threshold for irradiation assisted stress corrosion cracking (IASCC) of pressurized water reactor (PWR) reactor vessel (RV) internals is given in WCAP-14577, Revision 1-A, License Renewal Evaluation: Aging Management for Reactor Internals. WCAP-14577 Revision 1-A states that the threshold fluence level for IASCC in PWR RV internals is 1x1021 neutrons per square centimeter (n/cm2) (E > 0.1 MeV). Entergy has indicated that the neutron fluence value for the limiting RV internal component (i.e., the core shroud) will be about 3.5x1022 n/cm2 (E > 1 MeV) at the end of the current operating period after the 8 percent extended power uprate has been implemented. Although these values are not expressed on an equivalent basis, it is clear that the projected neutron fluence for the Waterford 3 core shroud is above the NRCs threshold for IASSC of PWR RV internal components made from stainless or nickel-alloy components.

Note 1 in Matrix 1 of Section 2.1 of NRR-RS-001 also indicates that, for management of

... thermal and neutron embrittlement of cast austenitic stainless steel, stress-corrosion cracking, and void swelling [in RV internals under extended power uprated conditions],

licensees will need to provide plant-specific degradation management programs or participate in industry programs to investigate degradation effects and determine the appropriate management programs.

Since Entergy has indicated that the post-EPU limiting neutron fluence value will be significantly above the threshold for initiating IASCC in the components, consistent with Note 1 in Matrix 1 above, the NRC staff requests that Entergy either:

1. Submit an inspection program, including the scope, sample size, inspection method, frequency of examination, and acceptance criteria that will be utilized to manage the aging effects for the Waterford 3 RV internals for NRC staff review and approval, or
2. Provide a commitment to participate in the Electric Power Research Institute MRPs research initiatives on age-related degradation of RV internal components.

July 2003 Waterford Steam Electric Station, Unit 3 cc:

Mr. Michael E. Henry, State Liaison Officer Department of Environmental Quality Permits Division P.O. Box 4313 Baton Rouge, Louisiana 70821-4313 Vice President, Operations Support Entergy Operations, Inc.

P. O. Box 31995 Jackson, MS 39286-1995 Director Nuclear Safety Assurance Entergy Operations, Inc.

17265 River Road Killona, LA 70066-0751 Wise, Carter, Child & Caraway P. O. Box 651 Jackson, MS 39205 General Manager Plant Operations Waterford 3 SES Entergy Operations, Inc.

17265 River Road Killona, LA 70066-0751 Licensing Manager Entergy Operations, Inc.

17265 River Road Killona, LA 70066-0751 Winston & Strawn 1400 L Street, N.W.

Washington, DC 20005-3502 Resident Inspector/Waterford NPS P. O. Box 822 Killona, LA 70066-0751 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 Parish President Council St. Charles Parish P. O. Box 302 Hahnville, LA 70057 Executive Vice President

& Chief Operating Officer Entergy Operations, Inc.

P. O. Box 31995 Jackson, MS 39286-1995 Chairman Louisiana Public Services Commission P. O. Box 91154 Baton Rouge, LA 70825-1697