ML21083A140
From kanterella
Jump to navigation
Jump to search
ML21083A140 | |
Person / Time | |
---|---|
Site: | Grand Gulf, Arkansas Nuclear, Waterford |
Issue date: | 03/22/2021 |
From: | Office of Nuclear Reactor Regulation |
To: | |
Kalathiveettil D | |
Shared Package | |
ML21083A135 | List: |
References | |
Download: ML21083A140 (1) | |
Category:Report
MONTHYEARW3F1-2023-0056, Owner'S Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 242023-12-19019 December 2023
[Table view]Owner'S Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 24 ML23325A1442023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1422023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23270B1892023-09-27027 September 2023 Evacuation Time Estimate Study 1CAN062304, Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation2023-06-29029 June 2023 Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation 1CAN062302, Enclosure 2: ANO-1 SAR Amendment 31 - Redacted Version2023-06-20020 June 2023 Enclosure 2: ANO-1 SAR Amendment 31 - Redacted Version ML23180A1082023-06-20020 June 2023 ANO Unit 1 SAR Amendment 31, TRM, TS Bases, 10 CFR 50.59 Report, and Commitment Change Summary Report ML23088A2172022-12-31031 December 2022 Relief Request for Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 - Technical Report, ANP-4023NP, Revision 0, December 2022 W3F1-2022-0042, SR-22-003-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days2022-06-27027 June 2022 SR-22-003-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days 2CAN022202, Requests for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fourth 10-Year Interval, Second and Third Periods2022-02-24024 February 2022 Requests for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fourth 10-Year Interval, Second and Third Periods ML22011A2982022-01-11011 January 2022 ANS Evaluation Report W3F1-2021-0064, Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule to Support Relocation of Capsules 104 and 2842021-11-30030 November 2021 Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule to Support Relocation of Capsules 104 and 284 0CAN102102, Units 1 and 210 CFR 50.71(e) Report Revision 20 of the ANO Fire Hazards Analysis2021-10-0606 October 2021 Units 1 and 210 CFR 50.71(e) Report Revision 20 of the ANO Fire Hazards Analysis CNRO-2021-00023, Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L2021-10-0606 October 2021 Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L W3F1-2021-0050, Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request to Adopt2021-10-0101 October 2021 Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request to Adopt ML21272A3032021-09-30030 September 2021 Technology Inclusive Content of Application Project (Ticap) for Non-Light Water Reactors Westinghouse Evinci; Micro-Reactor Tabletop Exercise Report ML21237A0512021-08-25025 August 2021 Follow-on Risk Informed Performance Based Implementation Guidance Needed for Advanced Non-Light Water Reactors ML21081A1922021-06-30030 June 2021 Enclosure - USNRC-CNSC Joint Report Concerning X-Energy's Reactor Pressure Vessel Construction Code Assessment 2CAN062103, Request for Alternative ANO2-PT-003 End-of-Interval System Leakage Test for Extended Reactor Coolant Pressure Boundary Piping - Fifth Interval2021-06-29029 June 2021 Request for Alternative ANO2-PT-003 End-of-Interval System Leakage Test for Extended Reactor Coolant Pressure Boundary Piping - Fifth Interval 0CAN052102, Annual 10 CFR 50.46 Report for Calendar Year 2020 Emergency Core Cooling System Evaluation Changes2021-05-10010 May 2021 Annual 10 CFR 50.46 Report for Calendar Year 2020 Emergency Core Cooling System Evaluation Changes GNRO-2021/00011, Revision of Original Report of 10CFR50.59 and Commitments Change Evaluations - July 1, 2018 Through May 21, 20202021-04-19019 April 2021 Revision of Original Report of 10CFR50.59 and Commitments Change Evaluations - July 1, 2018 Through May 21, 2020 W3F1-2021-0004, License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to the Technical Requirements Manual2021-04-0505 April 2021 License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to the Technical Requirements Manual ML21272A3382021-04-0101 April 2021 Technology Inclusive Content of Application Project (Ticap) for Non-Light Water Reactors Versatile Test Reactor Ticap Tabletop Exercise Report ML21090A0332021-03-31031 March 2021 Historical Context and Perspective on Allowable Stresses and Design Parameters in ASME Section III, Division 5, Subsection Hb, Subpart B (ANL/AMD-21/1) ML21083A1362021-03-23023 March 2021 Completed Activities ML21083A1372021-03-22022 March 2021 NEIMA Reporting ML21083A1382021-03-22022 March 2021 Rulemaking ML21083A1392021-03-22022 March 2021 Strategy 1 ML21083A1402021-03-22022 March 2021 Strategy 2 ML21083A1412021-03-22022 March 2021 Strategy 3 ML21083A1422021-03-22022 March 2021 Strategy 4 ML21083A1432021-03-22022 March 2021 Strategy 5 ML21083A1442021-03-22022 March 2021 Strategy 6 W3F1-2021-0015, Revised Vendor Oversight Plan Summary - License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System2021-01-29029 January 2021 Revised Vendor Oversight Plan Summary - License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System ML21014A2672021-01-14014 January 2021 Preapplication Engagement to Optimize Application Reviews January 12 Version - Copy ML21075A2752020-12-22022 December 2020 FAQ 20-06 GGNS Scram - Final Approved W3F1-2020-0038, License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System2020-07-23023 July 2020 License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System 1CAN032001, Supplemental Information Related to License Amendment Request to Revise Loss of Voltage Relay Allowable Values2020-03-19019 March 2020 Supplemental Information Related to License Amendment Request to Revise Loss of Voltage Relay Allowable Values 0CAN121901, Summary of Lost Specimens Investigation Report2019-12-0303 December 2019 Summary of Lost Specimens Investigation Report W3F1-2019-0043, Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 20182019-07-0101 July 2019 Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 2018 W3F1-2019-0022, Resubmittal of Reactor Vessel Material Surveillance Program Capsule Test Results2019-03-14014 March 2019 Resubmittal of Reactor Vessel Material Surveillance Program Capsule Test Results ML18275A2342018-12-27027 December 2018 NRC Record of Decision for the License Renewal Application for Waterford, Unit 3 ML18215A1782018-06-30030 June 2018 WCAP-18169-NP, Rev 1, Arkansas Nuclear One Unit 2 Heatup and Cooldown Limit Curves for Normal Operation. W3F1-2018-0029, Submittal of Annual Report on Westinghouse Electric Co., LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 20172018-06-0707 June 2018 Submittal of Annual Report on Westinghouse Electric Co., LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 2017 ML18123A3142018-05-0707 May 2018 Staff Assessment of Flooding Focused Evaluation (CAC No. MF9897; EPID L-2017-JLD-0015) ML18085A5792018-03-26026 March 2018 Proposed Revision of Replacement of Turbine First Stage Pressure Signals with Power Range Neutron Monitoring System Signals ML17214A0292018-02-12012 February 2018 Staff Assessment of Flooding Focused Evaluation (CAC Nos. MF9809 and MF9810) ML17291A0092017-10-26026 October 2017 Staff Assessment Regarding Program Plan for Aging Management for Reactor Vessel Internals (CAC No. MF8155; EPID L-2016-LRO-0001) ML17290B1372017-10-17017 October 2017 Recommendations for Future Inspection - Replacement Steam Dryer. with GE Hitachi Nuclear Energy Report 0000-0125-6316-R2-NP ML17236A1792017-08-22022 August 2017 Arkansas, Units 1 and 2, ANO Emergency Plan On-Shift Staffing Analysis Report, Revision 2 2023-09-27 Category:Miscellaneous MONTHYEARW3F1-2023-0056, Owner'S Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 242023-12-19019 December 2023
[Table view]Owner'S Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 24 ML23325A1442023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1422023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation W3F1-2022-0042, SR-22-003-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days2022-06-27027 June 2022 SR-22-003-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days ML22011A2982022-01-11011 January 2022 ANS Evaluation Report CNRO-2021-00023, Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L2021-10-0606 October 2021 Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L 0CAN052102, Annual 10 CFR 50.46 Report for Calendar Year 2020 Emergency Core Cooling System Evaluation Changes2021-05-10010 May 2021 Annual 10 CFR 50.46 Report for Calendar Year 2020 Emergency Core Cooling System Evaluation Changes GNRO-2021/00011, Revision of Original Report of 10CFR50.59 and Commitments Change Evaluations - July 1, 2018 Through May 21, 20202021-04-19019 April 2021 Revision of Original Report of 10CFR50.59 and Commitments Change Evaluations - July 1, 2018 Through May 21, 2020 ML21083A1362021-03-23023 March 2021 Completed Activities ML21083A1372021-03-22022 March 2021 NEIMA Reporting ML21083A1382021-03-22022 March 2021 Rulemaking ML21083A1392021-03-22022 March 2021 Strategy 1 ML21083A1402021-03-22022 March 2021 Strategy 2 ML21083A1412021-03-22022 March 2021 Strategy 3 ML21083A1422021-03-22022 March 2021 Strategy 4 ML21083A1432021-03-22022 March 2021 Strategy 5 ML21083A1442021-03-22022 March 2021 Strategy 6 ML21014A2672021-01-14014 January 2021 Preapplication Engagement to Optimize Application Reviews January 12 Version - Copy ML21075A2752020-12-22022 December 2020 FAQ 20-06 GGNS Scram - Final Approved 1CAN032001, Supplemental Information Related to License Amendment Request to Revise Loss of Voltage Relay Allowable Values2020-03-19019 March 2020 Supplemental Information Related to License Amendment Request to Revise Loss of Voltage Relay Allowable Values 0CAN121901, Summary of Lost Specimens Investigation Report2019-12-0303 December 2019 Summary of Lost Specimens Investigation Report W3F1-2019-0043, Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 20182019-07-0101 July 2019 Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 2018 ML18275A2342018-12-27027 December 2018 NRC Record of Decision for the License Renewal Application for Waterford, Unit 3 W3F1-2018-0029, Submittal of Annual Report on Westinghouse Electric Co., LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 20172018-06-0707 June 2018 Submittal of Annual Report on Westinghouse Electric Co., LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 2017 ML18123A3142018-05-0707 May 2018 Staff Assessment of Flooding Focused Evaluation (CAC No. MF9897; EPID L-2017-JLD-0015) ML18085A5792018-03-26026 March 2018 Proposed Revision of Replacement of Turbine First Stage Pressure Signals with Power Range Neutron Monitoring System Signals ML17214A0292018-02-12012 February 2018 Staff Assessment of Flooding Focused Evaluation (CAC Nos. MF9809 and MF9810) ML17291A0092017-10-26026 October 2017 Staff Assessment Regarding Program Plan for Aging Management for Reactor Vessel Internals (CAC No. MF8155; EPID L-2016-LRO-0001) ML17290B1372017-10-17017 October 2017 Recommendations for Future Inspection - Replacement Steam Dryer. with GE Hitachi Nuclear Energy Report 0000-0125-6316-R2-NP GNRO-2017/00042, Report Pursuant to 10 CFR 71.95 (a)(3) and (B) of Seven Potential Instances of Noncompliance with Certificate of Compliance No. 9233 for TN-RAM Package2017-07-12012 July 2017 Report Pursuant to 10 CFR 71.95 (a)(3) and (B) of Seven Potential Instances of Noncompliance with Certificate of Compliance No. 9233 for TN-RAM Package ML17167A0832017-06-28028 June 2017 Arkansas Nuclear One, Unit 2 - Review of Commitment Submittal for License Renewal Regarding Nickel-Based Alloy Aging Management Program Plan (CAC No. MF8154) GNRO-2017/00038, Focused Evaluation of External Flooding2017-06-27027 June 2017 Focused Evaluation of External Flooding W3F1-2017-0042, Focused Evaluation of External Flooding2017-05-17017 May 2017 Focused Evaluation of External Flooding ML17023A2822017-02-27027 February 2017 Flood Hazard Mitigating Strategies Assessment 2CAN011703, Submittal of Additional Protocol Report2017-01-26026 January 2017 Submittal of Additional Protocol Report ML17024A0362016-12-31031 December 2016 Operating Data Report for 2016 0CAN121602, Mitigating Strategies Assessment (MSA) Report for the New Seismic Hazard Information Per Nuclear Energy Institute (NEI) 12-06, Appendix H, Revision 2, H.4.3 Path 32016-12-30030 December 2016 Mitigating Strategies Assessment (MSA) Report for the New Seismic Hazard Information Per Nuclear Energy Institute (NEI) 12-06, Appendix H, Revision 2, H.4.3 Path 3 GNRO-2016/00053, Mitigating Strategies Assessment (MSA) for Flooding Submittal2016-12-30030 December 2016 Mitigating Strategies Assessment (MSA) for Flooding Submittal ML17003A2902016-12-20020 December 2016 Areva, Inc. - Engineering Information Record - Arkansas Nuclear One HFE-High Frequency Confirmation Report ML16308A4472016-10-19019 October 2016 Final ASP Program Analysis Precursor for Waterford Steam Electric Station, Unit 3 Re. Both Emergency Diesel Generators Declared Inoperable (LER 382-2015-007) 1CAN091601, Submittal of Initial Examination Completion of Post-Examination Analysis2016-09-0101 September 2016 Submittal of Initial Examination Completion of Post-Examination Analysis GNRO-2016/00046, Report of 10CFR50.59 Evaluations and Commitment Change Evaluations for the Period July 1, 2014 Through June 30, 20162016-08-23023 August 2016 Report of 10CFR50.59 Evaluations and Commitment Change Evaluations for the Period July 1, 2014 Through June 30, 2016 ML16147A3242016-05-31031 May 2016 ANP-3417NP, Rev. 1, MRP-227-A Applicant/Licensee Action Item #7 Analysis for Arkansas Nuclear One, Unit 1. ML15259A3422015-08-24024 August 2015 10 CFR 71.95 Report Evaluation Form; Submitted by Fenok, Erwin Resin Solutions, North Anna Power Stations, Et Al ML15204A3232015-07-21021 July 2015 Attachment 2 to WF3-CS-15-00010, Rev. 0, Document 51-9227040-000, Fukushima Flood Hazard Reevaluation Report, Pp. 1 Through 3-61 W3F1-2015-0042, Attachment 2 to WF3-CS-15-00010, Rev. 0, Document 51-9227040-000, Fukushima Flood Hazard Reevaluation Report, Pp. 3-147 Through the End2015-07-21021 July 2015 Attachment 2 to WF3-CS-15-00010, Rev. 0, Document 51-9227040-000, Fukushima Flood Hazard Reevaluation Report, Pp. 3-147 Through the End ML15204A3242015-07-21021 July 2015 Attachment 2 to WF3-CS-15-00010, Rev. 0, Document 51-9227040-000, Fukushima Flood Hazard Reevaluation Report, Pp. 3-62 Through 3-146 ML15099A1522015-04-16016 April 2015 Review of Spring 2014 Steam Generator Tube Inspection Report, Inspection During Refueling Outage 2R23 ML15086A0242015-03-25025 March 2015 ANP-3300Q3NP, Revision 0 to Response to Request for Additional Information on Reactor Coolant System Pressure/Temperature and Low Temperature Overpressure Protection System Limits to 54 EFPY for Arkansas Nuclear One, Unit 1 (Non-Proprietary ML15043A1032015-02-10010 February 2015 Areva Document ANP-3383NP, Response to Request for Additional Information for the Reactor Pressure Vessel Internals Aging Management Program Plan for Arkansas Nuclear One Unit 1 2023-12-19 Category:Schedule and Calendars MONTHYEARML23130A2732023-05-10010 May 2023
[Table view]and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations W3F1-2022-0031, Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule to Reflect Location of Standby Capsules 3/W-104 and 6/W-2842022-04-25025 April 2022 Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule to Reflect Location of Standby Capsules 3/W-104 and 6/W-284 ML21354A7512021-12-20020 December 2021 Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 6 of 18 ML21354A7522021-12-20020 December 2021 Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 7 of 18 ML21354A7532021-12-20020 December 2021 Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 8 of 18 ML21126A3032021-05-10010 May 2021 Entergy Operations, Inc. Pre-Submittal Meeting - Grand Gulf Nuclear Station, Unit 1 Relief Request to Adopt Performance-based Testing for Pressure Isolation Valves (Pivs) ML21083A1372021-03-22022 March 2021 NEIMA Reporting ML21083A1442021-03-22022 March 2021 Strategy 6 ML21083A1432021-03-22022 March 2021 Strategy 5 ML21083A1422021-03-22022 March 2021 Strategy 4 ML21083A1412021-03-22022 March 2021 Strategy 3 ML21083A1402021-03-22022 March 2021 Strategy 2 ML21083A1392021-03-22022 March 2021 Strategy 1 ML21083A1382021-03-22022 March 2021 Rulemaking ML20365A0702020-12-30030 December 2020 Schedule Change to Open Phase Condition Detection Implementation ML20318A3862020-11-13013 November 2020 Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic W3F1-2019-0001, Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule2019-04-25025 April 2019 Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule ML17347A1272017-12-20020 December 2017 Status Update and Schedule Revision for the Review of the Waterford Steam Electric Station, Unit 3, License Renewal Application (CAC Nos. MF7492 and MF7493) ML16012A3912016-02-0303 February 2016 Schedule Revision for the Review of the Grand Gulf Nuclear Station, License Renewal Application ML15225A2542015-08-14014 August 2015 Summary of 4/20-23/2015 Audit in Support of Request to Adopt National Fire Protection Association NFPA 805, Performance-Based Standard for Fire Protection for LWR Generating Plants (2001 Edition) ML15007A4782015-01-15015 January 2015 Summary of July 15-18, 2013, Arkansas Nuclear One, Unit 2, Audit Associated with License Amendment Request to Transition to National Fire Protection Association Standard 805 ML14356A1722014-12-22022 December 2014 Summary of Site Audit to Support the Review of a License Amendment Request for Arkansas Nuclear One, Unit 2 to Transition to the National Fire Protection Association (NFPA) Standard 805 Fire Protection Licensing Basis ML13297A2502013-10-30030 October 2013 Schedule Revision for the Environmental Review of the Grand Gulf Nuclear Station License Renewal Application ML13002A4302013-02-26026 February 2013 Revision of Schedule for the Conduct of a Review of the Grand Gulf Nuclear Station, License Renewal Application ML1226400582012-09-20020 September 2012 NFPA 805 SE Schedule - September 2012 ML12242A5452012-09-0707 September 2012 Revision of Schedule for the Conduct of Review of the Grand Gulf Nuclear Station, LRA 0CAN071202, Response to Regulatory Issue Summary 2012-07, Preparation and Scheduling of Operator Licensing Examinations, (ML120650174)2012-07-12012 July 2012 Response to Regulatory Issue Summary 2012-07, Preparation and Scheduling of Operator Licensing Examinations, (ML120650174) ML11335A3402011-12-16016 December 2011 Determination of Acceptability and Sufficiency for Docketing, Proposed Review Schedule, and Opportunity for a Hearing Regarding the Application from Entergy Operations, Inc. for Renewal of the Operating License for Gulf Nuclear Station, Uni GNRO-2011/00068, Response to NRC Regulatory Issue Summary 2011-04, Preparation and Scheduling of Operator Licensing Examination2011-08-17017 August 2011 Response to NRC Regulatory Issue Summary 2011-04, Preparation and Scheduling of Operator Licensing Examination 0CAN071104, Units 1 and 2, Response to Regulatory Issue Summary 2011-04, Preparation and Scheduling of Operator Licensing Examinations2011-07-12012 July 2011 Units 1 and 2, Response to Regulatory Issue Summary 2011-04, Preparation and Scheduling of Operator Licensing Examinations CNRO-2011-00003, Unit 1, Updated Schedule of Submittal of Future License Renewal Applications2011-06-22022 June 2011 Unit 1, Updated Schedule of Submittal of Future License Renewal Applications ML11137A2012011-05-17017 May 2011 Generator Inspection Conference Call 0CAN080902, Units 1 & 2, Projected Operator Licensing Examination Schedules2009-08-0505 August 2009 Units 1 & 2, Projected Operator Licensing Examination Schedules W3F1-2006-0047, Response to NRC RIS-2006-15, Preparation and Scheduling of Operator License Examinations2006-09-14014 September 2006 Response to NRC RIS-2006-15, Preparation and Scheduling of Operator License Examinations 2023-05-10 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML21083A140&oldid=3230140"