W3F1-2023-0056, Owner'S Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 24 | 19 December 2023 | Owner'S Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 24 | |
W3F1-2023-0055, Reply to a Notice of Violation | 14 December 2023 | Reply to a Notice of Violation | Significance Determination Process Grace period |
W3F1-2023-0052, Core Operating Limits Report (COLR) - Cycle 26, Revision O | 7 November 2023 | Core Operating Limits Report (COLR) - Cycle 26, Revision O | Shutdown Margin Coatings |
W3F1-2023-0049, Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability - Withdrawal | 28 September 2023 | Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability - Withdrawal | |
W3F1-2023-0048, Special Report SR 2023-004-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days | 25 September 2023 | Special Report SR 2023-004-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days | |
W3F1-2023-0035, Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program | 26 July 2023 | Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program | Anticipated operational occurrence Probabilistic Risk Assessment Surveillance Frequency Control Program |
W3F1-2023-0036, Special Report SR-2023-003-01 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days | 4 May 2023 | Special Report SR-2023-003-01 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days | Offsite Dose Calculation Manual |
W3F1-2023-0032, Annual Radioactive Effluent Release Report (ARERR) 2022 | 27 April 2023 | Annual Radioactive Effluent Release Report (ARERR) 2022 | Boric Acid Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Tritium |
W3F1-2023-0033, Submittal of Annual Radiological Environmental Operating Report - 2022 | 27 April 2023 | Submittal of Annual Radiological Environmental Operating Report - 2022 | Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Chernobyl |
W3F1-2023-0025, Annual Report of Individual Monitoring of Radiation Exposure for 2022 Per 10 CFR 20.2206 | 11 April 2023 | Annual Report of Individual Monitoring of Radiation Exposure for 2022 Per 10 CFR 20.2206 | |
W3F1-2023-0018, Updated Final Supplemental Response to NRC Generic Letter 2004-02 | 30 March 2023 | Updated Final Supplemental Response to NRC Generic Letter 2004-02 | Boric Acid |
W3F1-2023-0022, Registration of Dry Fuel Storage Cask Use | 22 March 2023 | Registration of Dry Fuel Storage Cask Use | |
W3F1-2023-0021, Submittal of Special Report SR 2023-003-00 Radiation Monitor Inoperable Greater than 7 Days | 17 March 2023 | Submittal of Special Report SR 2023-003-00 Radiation Monitor Inoperable Greater than 7 Days | Offsite Dose Calculation Manual |
W3F1-2023-0016, Registration of Dry Fuel Storage Cask Use | 3 March 2023 | Registration of Dry Fuel Storage Cask Use | |
W3F1-2023-0014, Reply to a Notice of Violation; EA-22-119 | 20 February 2023 | Reply to a Notice of Violation; EA-22-119 | |
W3F1-2023-0013, Notification of Readiness for Supplemental Inspection | 15 February 2023 | Notification of Readiness for Supplemental Inspection | |
W3F1-2023-0007, Registration of Dry Fuel Storage Cask Use | 6 February 2023 | Registration of Dry Fuel Storage Cask Use | |
W3F1-2023-0010, Special Report SR 2023-002-00, Radiation Monitor Inoperable Greater than 7 Days | 25 January 2023 | Special Report SR 2023-002-00, Radiation Monitor Inoperable Greater than 7 Days | |
W3F1-2023-0002, SR 2023-001-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 30 Days | 5 January 2023 | SR 2023-001-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 30 Days | |
W3F1-2022-0067, Commitment Change Notification for Generic Safety Issue 191 and Generic Letter 2004-02 | 20 December 2022 | Commitment Change Notification for Generic Safety Issue 191 and Generic Letter 2004-02 | |
W3F1-2022-0054, Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability | 1 November 2022 | Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability | Surveillance Frequency Control Program |
W3F1-2022-0063, Submittal of Emergency Preparedness Documents. Includes EP-001-001, Revision 37 | 27 October 2022 | Submittal of Emergency Preparedness Documents. Includes EP-001-001, Revision 37 | |
W3F1-2022-0059, Response to Clarification Questions Concerning Supplement to License Amendment Request to Adopt TSTF-505 | 13 October 2022 | Response to Clarification Questions Concerning Supplement to License Amendment Request to Adopt TSTF-505 | Safe Shutdown |
W3F1-2022-0058, Reply to a Notice of Violation; EA-22-033 | 12 October 2022 | Reply to a Notice of Violation; EA-22-033 | |
W3F1-2022-0049, Response to Request for Additional Information Regarding License Amendment Requests to Adopt 10 CFR 50.69 and TSTF-505 | 19 August 2022 | Response to Request for Additional Information Regarding License Amendment Requests to Adopt 10 CFR 50.69 and TSTF-505 | Internal Flooding Probabilistic Risk Assessment Cyber Security |
W3F1-2022-0037, Submittal of Owner'S Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 24 | 8 August 2022 | Submittal of Owner'S Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 24 | Temporary Modification |
W3F1-2022-0044, SR-2022-004-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days | 6 July 2022 | SR-2022-004-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days | |
W3F1-2022-0042, SR-22-003-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days | 27 June 2022 | SR-22-003-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days | |
W3F1-2022-0015, Response to Request for Additional Information to License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk Informed Extended Completion Times - Ritstf. | 16 May 2022 | Response to Request for Additional Information to License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk Informed Extended Completion Times - Ritstf. | Hot Short Safe Shutdown High winds Ultimate heat sink Mission time Fire Barrier Tornado Missile Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment FLEX Tornado Generated Missile Tornado Missile Protection Thermoset Surveillance Frequency Control Program Large early release frequency Turbine Missile Offsite Circuit Fire Protection Program Fire Watch Power change |
W3F1-2022-0026, Report of Facility Changes, Tests, and Experiments and Commitment Changes for Two Year Period Ending April 28, 2022 | 28 April 2022 | Report of Facility Changes, Tests, and Experiments and Commitment Changes for Two Year Period Ending April 28, 2022 | Temporary Modification FLEX Aging Management Surveillance Frequency Control Program Turbine Missile |
W3F1-2022-0028, Annual Radiological Environmental Operating Report - 2021 | 26 April 2022 | Annual Radiological Environmental Operating Report - 2021 | Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Chernobyl |
W3F1-2022-0029, Annual Report of Individual Monitoring of Radiation Exposure for 2021 Per 10 CFR 20.2206 | 26 April 2022 | Annual Report of Individual Monitoring of Radiation Exposure for 2021 Per 10 CFR 20.2206 | |
W3F1-2022-0009, Supplement to Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors | 25 April 2022 | Supplement to Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors | Hot Short Safe Shutdown Ultimate heat sink Mission time Fire Barrier Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Cyber Security Incorporated by reference FLEX Fukushima Dai-Ichi Thermoset Surveillance Frequency Control Program Large early release frequency Fire Protection Program Fire Watch |
W3F1-2022-0031, Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule to Reflect Location of Standby Capsules 3/W-104 and 6/W-284 | 25 April 2022 | Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule to Reflect Location of Standby Capsules 3/W-104 and 6/W-284 | |
W3F1-2022-0020, Review of Preliminary Accident Sequence Precursor Report | 11 April 2022 | Review of Preliminary Accident Sequence Precursor Report | FLEX |
W3F1-2022-0017, Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 2021 | 7 April 2022 | Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 2021 | |
W3F1-2022-0019, WAT-2022-02 Post Exam Analysis | 9 March 2022 | WAT-2022-02 Post Exam Analysis | |
W3F1-2022-0011, Special Report SR-22-002-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days | 8 February 2022 | Special Report SR-22-002-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days | |
W3F1-2022-0008, SR-22-001-00, Waterford Steam Electric Station, Unit 3, Radiation Monitors Inoperable Greater than 7 Days | 1 February 2022 | SR-22-001-00, Waterford Steam Electric Station, Unit 3, Radiation Monitors Inoperable Greater than 7 Days | Offsite Dose Calculation Manual |
W3F1-2021-0074, Commitment Change Notification for Generic Safety Issue - 191 and Generic Letter 2004-02 | 16 December 2021 | Commitment Change Notification for Generic Safety Issue - 191 and Generic Letter 2004-02 | |
W3F1-2021-0064, Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule to Support Relocation of Capsules 104 and 284 | 30 November 2021 | Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule to Support Relocation of Capsules 104 and 284 | |
W3F1-2021-0061, Supplement to License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to Technical Requirements Manual | 14 October 2021 | Supplement to License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to Technical Requirements Manual | Surveillance Frequency Control Program Fire Protection Program |
W3F1-2021-0063, Request for One-Time Exemption from 10 CFR 50, Appendix E Biennial Emergency Preparedness Evaluated Exercise Requirements Due to Severe Storm Recovery | 12 October 2021 | Request for One-Time Exemption from 10 CFR 50, Appendix E Biennial Emergency Preparedness Evaluated Exercise Requirements Due to Severe Storm Recovery | Exemption Request |
W3F1-2021-0050, Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request to Adopt | 1 October 2021 | Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request to Adopt | Safe Shutdown Tornado Missile Safe Shutdown Earthquake Internal Flooding Enforcement Discretion Probabilistic Risk Assessment Operating Basis Earthquake FLEX Tornado Generated Missile Fukushima Dai-Ichi Seismically rugged Tornado Missile Protection Large early release frequency TORMIS Earthquake Generic Issues Program |
W3F1-2021-0060, Response to Request for Additional Information Regarding License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to Technical Requirements Manual | 30 September 2021 | Response to Request for Additional Information Regarding License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to Technical Requirements Manual | |
W3F1-2021-0039, Application for Technical Specification Change to Revise Pressure/Temperature and Low Temperature Overpressure Protection for 55 Effective Full Power Years | 25 August 2021 | Application for Technical Specification Change to Revise Pressure/Temperature and Low Temperature Overpressure Protection for 55 Effective Full Power Years | Hydrostatic |
W3F1-2021-0055, Supplement to License Amendment Request to Relocate Boration Systems Technical Specifications to the Technical Requirements Manual | 20 August 2021 | Supplement to License Amendment Request to Relocate Boration Systems Technical Specifications to the Technical Requirements Manual | Boric Acid Surveillance Frequency Control Program |
W3F1-2021-0057, (Waterford 3) - Emergency Plan Revision 052 | 18 August 2021 | (Waterford 3) - Emergency Plan Revision 052 | Safe Shutdown Boric Acid Health Physics Network High Radiation Area Offsite Dose Calculation Manual Fire Barrier Anticipated operational occurrence Emergency Lighting Locked High Radiation Area Earthquake Deep Dose Equivalent Minimum staff Fire Protection Program Siren Overexposure |
W3F1-2021-0054, License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System, Dated July 23, 2020 | 29 July 2021 | License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System, Dated July 23, 2020 | |
W3F1-2021-0051, Revised Licensing Technical Report for the Common Q Core Protection Calculator System - License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator System and Control Element Assembly Calculator | 19 July 2021 | Revised Licensing Technical Report for the Common Q Core Protection Calculator System - License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator System and Control Element Assembly Calculator | Safe Shutdown Anticipated operational occurrence Commercial Grade Dedication Post Accident Monitoring Cyber Security B.5.b Surveillance Frequency Control Program Process Control Program Fuel cladding Affidavit |