MONTHYEARIR 05000382/20230102024-01-31031 January 2024 Comprehensive Engineering Team Inspection Report 05000382/2023010 IR 05000382/20230032024-01-23023 January 2024 Acknowledgment of Reply to a Notice of Violation NRC Inspection Report 05000382/2023003 ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and ML23340A2292023-12-28028 December 2023 Withdrawal of an Amendment Request to Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability (EPID L-2022-LLA-0169)-LTR ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1442023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23312A1832023-11-14014 November 2023 Integrated Inspection Report 05000382/2023003 and Notice of Violation ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000382/20234012023-10-0404 October 2023 Cyber Security Inspection Report 05000382/2023401 (Cover Letter Only) IR 05000382/20230052023-08-21021 August 2023 Updated Inspection Plan for Waterford Steam Electric Station, Unit 3 - (Report 05000382/2023005) IR 05000382/20233012023-08-15015 August 2023 NRC Initial Operator Licensing Examination Approval 05000382/2023301 IR 05000382/20230022023-08-0808 August 2023 Integrated Inspection Report 05000382/2023002 IR 05000382/20234022023-08-0707 August 2023 NRC Security Inspection Report 05000382/2023402 (Full Report) IR 05000382/20230402023-07-12012 July 2023 Revised 95001 Supplemental Inspection Report 05000382/2023040, Exercise of Enforcement Discretion, and Follow-Up Assessment Letter ML23191A4562023-07-10010 July 2023 Notification of Comprehensive Engineering Team Inspection (050003822023010) and Request for Information ML23158A1042023-06-0808 June 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000382/2023401 ML23145A2272023-06-0202 June 2023 95001 Supplemental Inspection Report 05000382/2023040, and Exercise of Enforcement Discretion ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment IR 05000382/20230012023-04-24024 April 2023 Integrated Inspection Report 05000382/2023001, Independent Spent Fuel Storage Installation Report 07200075/2023001, and Exercise of Enforcement Discretion ML23111A2132023-04-21021 April 2023 Responses to RAI Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities ML23110A1122023-04-20020 April 2023 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G ML23108A2542023-04-18018 April 2023 WCGS Information Request, Security IR 2023401 IR 05000382/20234032023-04-17017 April 2023 Security Baseline Inspection Report 05000382/2023403 ML23093A2122023-04-0303 April 2023 Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 2022 ML23089A0602023-03-30030 March 2023 Entergy Operations, Inc. - Fleet Project Manager Assignment ML23088A3922023-03-29029 March 2023 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML23080A2882023-03-21021 March 2023 Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) Entergy Operations, Inc ML23059A2592023-03-0707 March 2023 Correction to Issuance to Amendment No. 270 Adoption of TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML23065A2002023-03-0303 March 2023 EN 56252 Update - Flow Serve - Final Notification of Potential Part 21 on Peerless 56 Frame DC Motors ML23060A1092023-03-0101 March 2023 Proof of Financial Protection (10 CFR 140.15) IR 05000382/20220062023-03-0101 March 2023 Annual Assessment Letter for Waterford Steam Electric Station, Unit 3, (Report 05000382/2022006) ML22322A1092023-02-17017 February 2023 Issuance of Amendment No. 270 Adoption of TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b IR 05000382/20230902023-02-0101 February 2023 Final Significance Determination of a White Finding, NOV, and Follow-Up Assessment Letter; NRC Inspection Report 05000382/2023090 ML23032A5062023-02-0101 February 2023 Technical Specification Index and Bases Update to the NRC for the Period November 11, 2021 Through July 25, 2022 ML23030A6642023-01-27027 January 2023 Flowserve, Part 21 Second Interim Notification Report Re Peerless 56 Frame DC Motors IR 05000382/20220042023-01-26026 January 2023 Integrated Inspection Report 05000382/2022004 and Independent Fuel Storage Installation Inspection Report 07200075/2022001 ML23024A0822023-01-20020 January 2023 Stephens Insurance, Entergy - 2023 Nuclear Energy Liability Evidence of Financial Protection ML23018A2202023-01-18018 January 2023 Quality Assurance Program Manual Reduction in Commitment IR 05000382/20220912023-01-12012 January 2023 Emergency Preparedness Inspection Report 05000382/2022091 and Preliminary White Finding and Apparent Violation IR 05000382/20220032023-01-0505 January 2023 Revised Integrated Inspection Report 05000382/2022003 ML22342B1402022-12-0202 December 2022 56252-EN 56252 - Flowserve - Limitorque - Interim Report Potential Part 21 on Peerless 56 Frame DC Motors ML22300A2082022-11-30030 November 2022 Issuance of Amendment No. 269 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML22332A5292022-11-29029 November 2022 Notification of NRC Initial Operator Licensing Examination 05000382/2023301 IR 05000382/20220132022-11-28028 November 2022 Design Basis Assurance Inspection (Programs) Inspection Report 05000382/2022013 IR 05000382/20220022022-11-0101 November 2022 Revised Integrated Inspection Report 05000382/2022002 2024-01-31
[Table view] Category:Report
MONTHYEARW3F1-2023-0056, Owner'S Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 242023-12-19019 December 2023 Owner'S Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 24 ML23325A1442023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation W3F1-2022-0042, SR-22-003-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days2022-06-27027 June 2022 SR-22-003-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days W3F1-2021-0064, Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule to Support Relocation of Capsules 104 and 2842021-11-30030 November 2021 Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule to Support Relocation of Capsules 104 and 284 CNRO-2021-00023, Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L2021-10-0606 October 2021 Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L W3F1-2021-0050, Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request to Adopt2021-10-0101 October 2021 Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request to Adopt ML21272A3032021-09-30030 September 2021 Technology Inclusive Content of Application Project (Ticap) for Non-Light Water Reactors Westinghouse Evinci; Micro-Reactor Tabletop Exercise Report ML21237A0512021-08-25025 August 2021 Follow-on Risk Informed Performance Based Implementation Guidance Needed for Advanced Non-Light Water Reactors ML21081A1922021-06-30030 June 2021 Enclosure - USNRC-CNSC Joint Report Concerning X-Energy's Reactor Pressure Vessel Construction Code Assessment W3F1-2021-0004, License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to the Technical Requirements Manual2021-04-0505 April 2021 License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to the Technical Requirements Manual ML21272A3382021-04-0101 April 2021 Technology Inclusive Content of Application Project (Ticap) for Non-Light Water Reactors Versatile Test Reactor Ticap Tabletop Exercise Report ML21090A0332021-03-31031 March 2021 Historical Context and Perspective on Allowable Stresses and Design Parameters in ASME Section III, Division 5, Subsection Hb, Subpart B (ANL/AMD-21/1) ML21083A1362021-03-23023 March 2021 Completed Activities ML21083A1412021-03-22022 March 2021 Strategy 3 ML21083A1372021-03-22022 March 2021 NEIMA Reporting ML21083A1442021-03-22022 March 2021 Strategy 6 ML21083A1382021-03-22022 March 2021 Rulemaking ML21083A1392021-03-22022 March 2021 Strategy 1 ML21083A1402021-03-22022 March 2021 Strategy 2 ML21083A1432021-03-22022 March 2021 Strategy 5 ML21083A1422021-03-22022 March 2021 Strategy 4 W3F1-2021-0015, Revised Vendor Oversight Plan Summary - License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System2021-01-29029 January 2021 Revised Vendor Oversight Plan Summary - License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System ML21014A2672021-01-14014 January 2021 Preapplication Engagement to Optimize Application Reviews January 12 Version - Copy W3F1-2020-0038, License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System2020-07-23023 July 2020 License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System W3F1-2019-0043, Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 20182019-07-0101 July 2019 Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 2018 W3F1-2019-0022, Resubmittal of Reactor Vessel Material Surveillance Program Capsule Test Results2019-03-14014 March 2019 Resubmittal of Reactor Vessel Material Surveillance Program Capsule Test Results ML18275A2342018-12-27027 December 2018 NRC Record of Decision for the License Renewal Application for Waterford, Unit 3 W3F1-2018-0029, Submittal of Annual Report on Westinghouse Electric Co., LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 20172018-06-0707 June 2018 Submittal of Annual Report on Westinghouse Electric Co., LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 2017 ML17163A1852017-06-30030 June 2017 Biological Evaluation of Impacts to Federally Listed Species for Waterford License Renewal W3F1-2017-0042, Focused Evaluation of External Flooding2017-05-17017 May 2017 Focused Evaluation of External Flooding ML17023A2822017-02-27027 February 2017 Flood Hazard Mitigating Strategies Assessment ML16308A4472016-10-19019 October 2016 Final ASP Program Analysis Precursor for Waterford Steam Electric Station, Unit 3 Re. Both Emergency Diesel Generators Declared Inoperable (LER 382-2015-007) ML15268A0202015-09-23023 September 2015 Attachment 3, Fuel Thermal Conductivity Degradation Evaluation (Non-Proprietary) W3F1-2015-0042, Attachment 2 to WF3-CS-15-00010, Rev. 0, Document 51-9227040-000, Fukushima Flood Hazard Reevaluation Report, Pp. 3-147 Through the End2015-07-21021 July 2015 Attachment 2 to WF3-CS-15-00010, Rev. 0, Document 51-9227040-000, Fukushima Flood Hazard Reevaluation Report, Pp. 3-147 Through the End ML15204A3242015-07-21021 July 2015 Attachment 2 to WF3-CS-15-00010, Rev. 0, Document 51-9227040-000, Fukushima Flood Hazard Reevaluation Report, Pp. 3-62 Through 3-146 ML15204A3232015-07-21021 July 2015 Attachment 2 to WF3-CS-15-00010, Rev. 0, Document 51-9227040-000, Fukushima Flood Hazard Reevaluation Report, Pp. 1 Through 3-61 ML14129A3502014-04-29029 April 2014 Report of Facility Changes, Tests and Experiments and Commitment Changes for Two Year Period Ending April 25, 2014 ML13220A4022013-11-22022 November 2013 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies ML13317A9692013-11-20020 November 2013 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Waterford Steam Electric Generating Station, Unit 3, TAC No.: MF0977 W3F1-2013-0054, CFR 71.95 Report on Issues Involving Radwaste Cask 8-120B2013-09-0909 September 2013 CFR 71.95 Report on Issues Involving Radwaste Cask 8-120B W3F1-2013-0027, Closure Option for Generic Safety Issue - 1912013-05-16016 May 2013 Closure Option for Generic Safety Issue - 191 ML13120A4642013-03-25025 March 2013 Engineering Report WF3-CS-12-00003, Attachment C, Rev. 0, Safety Injection Sump Outlet Header B Isolation, Enclosure to W3F1-2013-0024, Pages 312 - 591 of 1014 W3F1-2013-0024, Engineering Report WF3-CS-12-00003, Attachment D, Rev. 0, Area Walk-by Checklists (Awcs), Enclosure to W3F1-2013-0024, Pages 592 - 817 of 10142013-03-25025 March 2013 Engineering Report WF3-CS-12-00003, Attachment D, Rev. 0, Area Walk-by Checklists (Awcs), Enclosure to W3F1-2013-0024, Pages 592 - 817 of 1014 ML13120A4622013-03-25025 March 2013 Engineering Report WF3-CS-12-00003, Attachment G, Rev. 0, Peer Review Checklist for SWEL, Enclosure to W3F1-2013-0024, Pages 820 - 1014 of 1014 ML13120A4612013-03-25025 March 2013 Engineering Report WF3-CS-12-00003, Revision 1, Wateford, Unit 3 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Enclosure to W3F1-2013-0024, Pages 1 - 311 of 1014 CNRO-2013-00002, Responses to NRC Request for Additional Information Regarding Application for Order Approving Transfers of Licenses and Conforming License and ESP Amendments2013-01-29029 January 2013 Responses to NRC Request for Additional Information Regarding Application for Order Approving Transfers of Licenses and Conforming License and ESP Amendments W3F1-2012-0100, WF3-CS-12-00003, Rev. 0, Waterford Steam Electric Station Unit 3 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic. Part 22012-11-16016 November 2012 WF3-CS-12-00003, Rev. 0, Waterford Steam Electric Station Unit 3 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic. Part 2 ML12333A2772012-11-16016 November 2012 WF3-CS-12-00003, Rev. 0, Waterford Steam Electric Station Unit 3 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic. Part 1 ML12333A2752012-11-16016 November 2012 WF3-CS-12-00003, Rev. 0, Waterford Steam Electric Station Unit 3 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic. Part 5 ML12333A2742012-11-16016 November 2012 WF3-CS-12-00003, Rev. 0, Waterford Steam Electric Station Unit 3 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic. Part 4 2023-12-19
[Table view] Category:Technical
MONTHYEARW3F1-2021-0064, Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule to Support Relocation of Capsules 104 and 2842021-11-30030 November 2021 Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule to Support Relocation of Capsules 104 and 284 W3F1-2021-0050, Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request to Adopt2021-10-0101 October 2021 Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request to Adopt ML21272A3032021-09-30030 September 2021 Technology Inclusive Content of Application Project (Ticap) for Non-Light Water Reactors Westinghouse Evinci; Micro-Reactor Tabletop Exercise Report ML21237A0512021-08-25025 August 2021 Follow-on Risk Informed Performance Based Implementation Guidance Needed for Advanced Non-Light Water Reactors ML21081A1922021-06-30030 June 2021 Enclosure - USNRC-CNSC Joint Report Concerning X-Energy's Reactor Pressure Vessel Construction Code Assessment W3F1-2021-0004, License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to the Technical Requirements Manual2021-04-0505 April 2021 License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to the Technical Requirements Manual ML21272A3382021-04-0101 April 2021 Technology Inclusive Content of Application Project (Ticap) for Non-Light Water Reactors Versatile Test Reactor Ticap Tabletop Exercise Report ML21090A0332021-03-31031 March 2021 Historical Context and Perspective on Allowable Stresses and Design Parameters in ASME Section III, Division 5, Subsection Hb, Subpart B (ANL/AMD-21/1) W3F1-2021-0015, Revised Vendor Oversight Plan Summary - License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System2021-01-29029 January 2021 Revised Vendor Oversight Plan Summary - License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System W3F1-2020-0038, License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System2020-07-23023 July 2020 License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System W3F1-2019-0022, Resubmittal of Reactor Vessel Material Surveillance Program Capsule Test Results2019-03-14014 March 2019 Resubmittal of Reactor Vessel Material Surveillance Program Capsule Test Results ML17163A1852017-06-30030 June 2017 Biological Evaluation of Impacts to Federally Listed Species for Waterford License Renewal ML15268A0202015-09-23023 September 2015 Attachment 3, Fuel Thermal Conductivity Degradation Evaluation (Non-Proprietary) ML13220A4022013-11-22022 November 2013 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies ML13317A9692013-11-20020 November 2013 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Waterford Steam Electric Generating Station, Unit 3, TAC No.: MF0977 W3F1-2013-0024, Engineering Report WF3-CS-12-00003, Attachment D, Rev. 0, Area Walk-by Checklists (Awcs), Enclosure to W3F1-2013-0024, Pages 592 - 817 of 10142013-03-25025 March 2013 Engineering Report WF3-CS-12-00003, Attachment D, Rev. 0, Area Walk-by Checklists (Awcs), Enclosure to W3F1-2013-0024, Pages 592 - 817 of 1014 ML13120A4642013-03-25025 March 2013 Engineering Report WF3-CS-12-00003, Attachment C, Rev. 0, Safety Injection Sump Outlet Header B Isolation, Enclosure to W3F1-2013-0024, Pages 312 - 591 of 1014 ML13120A4622013-03-25025 March 2013 Engineering Report WF3-CS-12-00003, Attachment G, Rev. 0, Peer Review Checklist for SWEL, Enclosure to W3F1-2013-0024, Pages 820 - 1014 of 1014 ML13120A4612013-03-25025 March 2013 Engineering Report WF3-CS-12-00003, Revision 1, Wateford, Unit 3 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Enclosure to W3F1-2013-0024, Pages 1 - 311 of 1014 ML12333A2722012-11-16016 November 2012 WF3-CS-12-00003, Rev. 0, Waterford Steam Electric Station Unit 3 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic. Part 3 W3F1-2012-0100, WF3-CS-12-00003, Rev. 0, Waterford Steam Electric Station Unit 3 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic. Part 22012-11-16016 November 2012 WF3-CS-12-00003, Rev. 0, Waterford Steam Electric Station Unit 3 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic. Part 2 ML12333A2772012-11-16016 November 2012 WF3-CS-12-00003, Rev. 0, Waterford Steam Electric Station Unit 3 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic. Part 1 ML12333A2752012-11-16016 November 2012 WF3-CS-12-00003, Rev. 0, Waterford Steam Electric Station Unit 3 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic. Part 5 ML12333A2742012-11-16016 November 2012 WF3-CS-12-00003, Rev. 0, Waterford Steam Electric Station Unit 3 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic. Part 4 ML12181A4152012-06-28028 June 2012 Attachment 1 to W3F1-2012-0049, Analysis of Proposed Operating License Change, Section 4.0 Through 6.0 W3F1-2012-0040, Technical Specification Bases Update to the NRC for the Period November 1, 2011 Through April 30, 20122012-05-30030 May 2012 Technical Specification Bases Update to the NRC for the Period November 1, 2011 Through April 30, 2012 ML1005506072010-02-28028 February 2010 WCAP-17187-NP, Technical Justification for Eliminating Pressurizer Surge Line Rupture as the Structural Design Basis for Waterford Steam Electric Station, Unit 3 Using Leak-Before-Break Methodology, Enclosure 2 to W3F1-2010-0003 ML0918312592009-06-24024 June 2009 Attachment 6 to W3F1-2009-0022, HI-2094376, Rev. 0, Licensing Report for Waterford, Unit 3 Spent Fuel Pool Criticality Analysis ML0821900132008-08-0707 August 2008 Monthly Operating Reports Second Quarter 2008 W3F1-2008-0039, Steam Generator Conditions Observed at Waterford 32008-05-20020 May 2008 Steam Generator Conditions Observed at Waterford 3 W3F1-2008-0018, Attachment 2, Supplemental Response to NRC Generic Letter 2004-02 Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors, (Non-Proprietary Version)2008-02-29029 February 2008 Attachment 2, Supplemental Response to NRC Generic Letter 2004-02 Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors, (Non-Proprietary Version) W3F1-2007-0045, Supplement to the ECCS Performance Analysis Submittal in Support of Next Generation Fuel - 1999 EM Optional Steam Cooling Model Justification2007-10-0404 October 2007 Supplement to the ECCS Performance Analysis Submittal in Support of Next Generation Fuel - 1999 EM Optional Steam Cooling Model Justification CNRO-2006-00039, Results of the Waterford 3 Pressurizer Flaw Evaluation2006-08-31031 August 2006 Results of the Waterford 3 Pressurizer Flaw Evaluation ML0523803522005-08-25025 August 2005 Steam Generator Tube Inspection Results for the 2003 Outage W3F1-2005-0045, 60-Day Report for Waterford Steam Electric Station, Unit 3 Reactor Pressure Vessel Head and Pressurizer Inspection for the Spring 2005 Refueling Outage2005-07-19019 July 2005 60-Day Report for Waterford Steam Electric Station, Unit 3 Reactor Pressure Vessel Head and Pressurizer Inspection for the Spring 2005 Refueling Outage ML0513702182005-05-17017 May 2005 Pgs. 1-61 Waterford 3 EAL Basis Document (W3-EP-001-001 Rev. Xx) ML0513702362005-05-16016 May 2005 Pgs. 62-123 Waterford 3 EAL Basis Document (W3-EP-001-001 Rev. Xx) W3F1-2005-0025, Holtec Licensing Report Errors2005-04-15015 April 2005 Holtec Licensing Report Errors W3F1-2004-0101, to Amendment Request NPF-38-256, Alternate Source Term, Waterford Steam Electric Station, Unit 32004-10-19019 October 2004 to Amendment Request NPF-38-256, Alternate Source Term, Waterford Steam Electric Station, Unit 3 W3F1-2004-0075, Reissue of Report BAW-2177, Analysis of Capsule W-97 Entergy Operations, Inc. Waterford Generating Station Unit 3 - Reactor Vessel Material Surveillance Program2004-09-13013 September 2004 Reissue of Report BAW-2177, Analysis of Capsule W-97 Entergy Operations, Inc. Waterford Generating Station Unit 3 - Reactor Vessel Material Surveillance Program W3F1-2004-0044, Small Break Loss-of-Coolant Accident Emergency Core Cooling System Performance Analysis2004-05-26026 May 2004 Small Break Loss-of-Coolant Accident Emergency Core Cooling System Performance Analysis ML0414101032004-04-0202 April 2004 Faxed on 04/02/94 to T.Alexion - Entergy - Waterford, Initial Engineering Evaluation for SBLOCA with DC Bus Single Failure CNRO-2003-00049, Letter Transmitting Mark-Up of Engineering Report M-EP-2003-004, Rev. 0 Fracture Mechanics Analysis for the Assessment Potential for Primary Water Stress Corrosion Crack (PWSCC) Growth, Un-Inspected Regions..., Pages 43 Through 572003-09-26026 September 2003 Letter Transmitting Mark-Up of Engineering Report M-EP-2003-004, Rev. 0 Fracture Mechanics Analysis for the Assessment Potential for Primary Water Stress Corrosion Crack (PWSCC) Growth, Un-Inspected Regions..., Pages 43 Through 57 CNRO-2003-00038, Rev. 0 to M-EP-2003-004, Fracture Mechanics Analysis for the Assessment of the Potential for Primary Water Stress Corrosion Crack Growth Un-Inspected Regions of the Control Element Drive Mechanism At..., Appendix D, Attachment 5 Thro2003-09-15015 September 2003 Rev. 0 to M-EP-2003-004, Fracture Mechanics Analysis for the Assessment of the Potential for Primary Water Stress Corrosion Crack Growth Un-Inspected Regions of the Control Element Drive Mechanism At..., Appendix D, Attachment 5 Through Enc CNRO-2003-00030, Arkansas, Unit 2 and Waterford, Unit 3, Letter CNRO-2003-00027 to NRC, Relaxation Requests to NRC Order EA-03-009, Dated July 1, 20032003-07-24024 July 2003 Arkansas, Unit 2 and Waterford, Unit 3, Letter CNRO-2003-00027 to NRC, Relaxation Requests to NRC Order EA-03-009, Dated July 1, 2003 CNRO-2003-00020, Arkansas, Unit 2 and Waterford, Unit 3, Relaxation Requests to NRC Order EA-03-0092003-06-11011 June 2003 Arkansas, Unit 2 and Waterford, Unit 3, Relaxation Requests to NRC Order EA-03-009 W3F1-2002-0099, Ses, Report of Facility Changes, Tests & Experiments for Period from June 1, 2001 Through May 31. 20022002-11-27027 November 2002 Ses, Report of Facility Changes, Tests & Experiments for Period from June 1, 2001 Through May 31. 2002 ML19066A0671986-11-30030 November 1986 Overview Description of the Core Operating Limit Supervisory System (COLSS)(CEN-312-NP, Revision 01-NP 8701270057) ML19066A0851986-04-30030 April 1986 CPC and Methodology Changes for the CPC Improvement Program (CEN-310-NP-A 8605270198) ML15350A2151985-09-0505 September 1985 Overview Description of Core Operating Limit Supervisory System (Colss)(Rev 00-NP to CEN-312-NP) 2021-09-30
[Table view] |
Text
August 25, 2005 Mr. Joseph E. Venable Vice President Operations Entergy Operations, Inc.
17265 River Road Killona, LA 70066-0751
SUBJECT:
REVIEW OF WATERFORD STEAM ELECTRIC STATION, UNIT 3 (WATERFORD 3) STEAM GENERATOR TUBE INSPECTION REPORTS FOR THE 2003 OUTAGE (TAC No. MC5130)
Dear Mr. Venable:
By letter dated November 18, 2003, as supplemented by letters dated November 15, 2004, and July 7, 2005, Entergy Operations, Inc. (Entergy, the licensee) submitted reports summarizing the results of inspections of the Waterford 3 steam generator tubes performed during the 2003 refueling outage (RF12).
As discussed in the enclosed evaluation, the Nuclear Regulatory Commission (NRC) staff concludes that Entergy provided the information required by its technical specifications. In addition, the NRC staff did not identify any technical issues that warrant follow-up action at this time.
If you have questions regarding this response, please contact N. Kalyanam, Project Manager, Waterford 3, at (301) 415-1480.
Sincerely,
/RA/
David Terao, Chief, Section 1 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-382
Enclosure:
Evaluation cc w/encl: See next page
Mr. Joseph E. Venable August 25, 2005 Vice President Operations Entergy Operations, Inc.
17265 River Road Killona, LA 70066-0751
SUBJECT:
REVIEW OF WATERFORD STEAM ELECTRIC STATION, UNIT 3 (WATERFORD 3) STEAM GENERATOR TUBE INSPECTION REPORTS FOR THE 2003 OUTAGE (TAC No. MC5130)
Dear Mr. Venable:
By letter dated November 18, 2003, as supplemented by letters dated November 15, 2004, and July 7, 2005, Entergy Operations, Inc. (Entergy, the licensee) submitted reports summarizing the results of inspections of the Waterford 3 steam generator tubes performed during the 2003 refueling outage (RF12).
As discussed in the enclosed evaluation, the Nuclear Regulatory Commission (NRC) staff concludes that Entergy provided the information required by its technical specifications. In addition, the NRC staff did not identify any technical issues that warrant follow-up action at this time.
If you have questions regarding this response, please contact N. Kalyanam, Project Manager, Waterford 3, at (301) 415-1480.
Sincerely,
/RA/
David Terao, Chief, Section 1 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-382
Enclosure:
Evaluation cc w/encl: See next page DISTRIBUTION PUBLIC PDIV-1 Reading RidsOgcRp RidsAcrsAcnwMailCenter RidsNrrDlpmLpdiv1 (DTerao) RidsNrrPMNKalyanam RidsNrrLADBaxley RidsRgn4`MailCenter (DGraves) LLund MMurphy KKarwoski Accession No.:ML052380352 OFFICE PDIV-1/PM PDIV-1/LA PDIV-1/SC NAME NKalyanam LFeizollahi for DBaxley DTerao DATE 8/24/05 8/24/05 8/25/05 OFFICIAL RECORD COPY
EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION OF THE STEAM GENERATOR TUBE INSPECTION REPORTS FOR THE 2003 OUTAGE ENTERGY OPERATIONS, INC.
WATERFORD STEAM ELECTRIC STATION, UNIT 3 (WATERFORD 3)
DOCKET NO. 50-382 By letter dated November 18, 2003 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML033290432), and as supplemented by letters dated November 15, 2004 (ADAMS Accession No. ML043220259), and July 7, 2005 (ADAMS Accession No. ML051930068), Entergy Operations, Inc. (the licensee) submitted reports summarizing the results of inspections of the Waterford 3 steam generator tubes performed during the twelfth refueling outage in 2003 (RF12). Since the next refueling outage (RF13) at Waterford 3 was being conducted at nearly the same time that the response to the request for additional information was received, the Nuclear Regulatory Commission (NRC) staff factored the questions into their discussions with Waterford 3 during the 2005 (RF13) outage.
Waterford 3 has two Combustion Engineering Model 70 steam generators. Each steam generator contains 9,350 mill-annealed Alloy 600 tubes. Each tube has a nominal outside diameter of 0.750-inch and a nominal wall thickness of 0.048-inch. The tubes were explosively expanded (explansion) at both ends for the full length of the tubesheet and are supported by a number of carbon steel eggcrate supports, batwings, and vertical straps. The hot-leg temperature is approximately 605E F. The tubes in rows 1 through 18 are U-shaped while the tubes in rows 19 and greater have two 90-degree bends (i.e., square bends). There are no sleeves installed in either steam generator.
High temperature chemical cleaning of the steam generators was performed during the 2000 (RF10) outage in order to remove copper and residual amounts of lead from the tube bundle. Problems were encountered during the cleaning resulting in copper being plated out on the tubes. This prompted concerns about crack initiation and a reduction in the probability of detection with eddy current techniques. Therefore, a second chemical cleaning was performed during the 2003 (RF12) outage. As a result of this chemical cleaning, the level of detection was improved. After chemical cleaning, tubes which still had copper deposits that resulted in significant noise were removed from service. A total of 12 indications (11 tubes) were identified during the 2003 outage that still had sufficient copper deposits resulting in significant amounts of noise. These tubes were plugged.
The licensee provided the scope, extent, methods, and results of their steam generator tube inspections in the documents referenced above. The licensee also described corrective actions (i.e., tube plugging or repair) taken in response to the inspection findings.
ENCLOSURE
As a result of the review of the reports, the NRC staff has the following observations:
- 1. Cracks have been observed to initiate in wear scars at several plants. Given the limited ability to distinguish a crack from a wear scar with the bobbin coil, some licensees inspect all bobbin indications which they suspect are a result of wear with a rotating probe each outage. These rotating probe examinations are performed to confirm that the bobbin indication is actually a result of wear and not some other degradation mechanism (e.g., cracks or a combination of a crack within a wear scar). Since bobbin indications attributed to wear scars are sized and left in service, if the bobbin indication is actually a result of a crack within a wear scar (or is simply a crack), the size of the flaw may be underestimated (since the method for sizing a crack and wear may differ). If the flaw is severe enough, it may no longer meet the structural integrity performance criteria at the end of the next operating interval.
Of the suspected wear indications detected at Waterford 3 in 2003 with a bobbin coil, approximately 20 percent were inspected with a rotating probe including all newly identified potential wear indications (i.e., those bobbin indications expected to be a result of wear for which no previous rotating probe examinations were performed to identify the nature of the degradation). These examinations verified that the reported indications displayed a volumetric response and were not crack-like. Although no crack-like indications have been detected in wear scars at Waterford 3, the operating experience at other plants indicate the potential for cracks to develop in wear scars. Given the goal to ensure tube integrity for all tubes, it is important to have a high degree of confidence that indications are appropriately classified (e.g., as either wear, cracking, or cracking in combination with wear) so that they are appropriately sized and dispositioned. In addition, it is important for tube integrity analyses to reflect the potential for this degradation mechanism to occur.
- 2. Two crack-like indications were found at dented locations during the 2003 (RF12) outage at Waterford 3. Both indications were axially oriented and were located in steam generator 31.
The indications were attributed to outside diameter stress corrosion cracking. The voltages of the dents associated with these crack-like indications were 2.2 and 4.2 volts.
The crack-like indications were only detected with the rotating probe. During the 2003 outage, 100 percent of the dents greater than 2 volts in steam generator 31 were inspected with a rotating probe while 20 percent of the dents greater than 2 volts in steam generator 32 were inspected with a rotating probe. Neither of the indications were coincident with the dent and the indications were non-safety significant.
Although none of the indications detected were attributed to the denting at these locations, operating experience has shown that denting can limit the ability to detect degradation.
As a result, by not routinely inspecting all dented/dinged locations with a probe capable of finding the forms of degradation potentially affecting the tube at these locations, tube integrity analysis may become a challenge. This consideration has led many licensees to inspect all dented/dinged locations greater than some voltage threshold with a rotating probe to confirm the absence of cracking at these locations.
- 3. Three axial freespan indications were identified in one tube in steam generator 32.
This was the first inspection where freespan indications were identified. This tube was adjacent to a stay rod and the eddy current inspection revealed lines of sludge between the tube and the stay rod. The indications were located several inches above the first hot-leg eggcrate support and were aligned axially along the length of the tube.
- 4. Axially oriented outside diameter stress corrosion cracks have been observed at the eggcrate supports. Most of the indications have been detected in the hot-leg although several indications have been detected in the cold-leg (e.g., third cold-leg eggcrate support).
Based on a review of the information provided, the NRC staff concludes that the licensee provided the information required by its technical specifications. In addition, the NRC staff concludes that there are no technical issues that warrant follow-up action at this time since (1) additional tube inspections have been performed subsequent to the submittal of these reports, (2) the inspections appear to be consistent with the objective of detecting potential tube degradation, and (3) the inspection results appear to be consistent with industry operating experience at similarly designed and operated units. Given that the licensee has performed another inspection of the steam generator tubes in 2005 (i.e., superceding the 2003 inspections), additional review of the issues discussed above may be performed as a result of the NRC staffs review of the reports that will be submitted (in accordance with the technical specifications) summarizing the results of the 2005 inspections.
Principal Contributor: Ken Karwoski Date: August 25, 2005 Waterford Steam Electric Station, Unit 3 cc:
Mr. Michael E. Henry, State Liaison Officer Regional Administrator, Region IV Department of Environmental Quality U.S. Nuclear Regulatory Commission Permits Division 611 Ryan Plaza Drive, Suite 400 P.O. Box 4313 Arlington, TX 76011 Baton Rouge, Louisiana 70821-4313 Parish President Council Vice President Operations Support St. Charles Parish Entergy Operations, Inc. P. O. Box 302 P. O. Box 31995 Hahnville, LA 70057 Jackson, MS 39286-1995 Executive Vice President Director & Chief Operating Officer Nuclear Safety Assurance Entergy Operations, Inc.
Entergy Operations, Inc. P. O. Box 31995 17265 River Road Jackson, MS 39286-1995 Killona, LA 70066-0751 Chairman Wise, Carter, Child & Caraway Louisiana Public Services Commission P. O. Box 651 P. O. Box 91154 Jackson, MS 39205 Baton Rouge, LA 70825-1697 General Manager Plant Operations Waterford 3 SES Entergy Operations, Inc.
17265 River Road Killona, LA 70066-0751 Licensing Manager Entergy Operations, Inc.
17265 River Road Killona, LA 70066-0751 Winston & Strawn 1700 K Street, N.W.
Washington, DC 20006-3817 Resident Inspector/Waterford NPS P. O. Box 822 Killona, LA 70066-0751 May 2005