Letter Sequence RAI |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Results
Other: ML040300802, ML040631055, ML042520157, ML042670485, ML050870511, ML051090111, ML052290107, ML052800176, W3F1-2004-0076, To Amendment Request NPF-38-256, Alternate Source Term, W3F1-2004-0085, Schedule Clarification for Amendment Request NPF-38-249, Extended Power Uprate, W3F1-2004-0095, To Amendment Request NPF-38-256 Alternate Source Term, W3F1-2004-0101, To Amendment Request NPF-38-256, Alternate Source Term, Waterford Steam Electric Station, Unit 3
|
MONTHYEARML0425201572004-01-14014 January 2004 E-mail to T. Alexion Dated 1/14/04 Waterford - Extended Power Uprate Project stage: Other ML0401405152004-01-14014 January 2004 Meeting with Entergy, Waterford Steam Electric Station, Unit 3 Extended Power Uprate Amendment Request Dated 11/13/2003 Project stage: Meeting ML0403302602004-01-28028 January 2004 1/28/04 Waterford 3 - RAI Revision to Facility Operating License & TS - Extended Power Uprate Request. TAC MC1355 Project stage: RAI ML0403008022004-01-28028 January 2004 FRN -Notice of Consideration of Issuance of Amendment for Extended Power Uprate and Opportunity for Hearing Project stage: Other W3F1-2004-0004, Supplemental Information Extended Power Uprate - Power Ascension Testing2004-01-29029 January 2004 Supplemental Information Extended Power Uprate - Power Ascension Testing Project stage: Request ML0425201642004-01-30030 January 2004 E-mail Dated 1/30/04 RAI from Environmental Section on Waterford Unit 3 Project stage: RAI ML0425201672004-02-10010 February 2004 E-mail Dated 2/10/04 Waterford - Draft RAI from Human Performance, Piping Integrity and Electrical Groups Project stage: Draft RAI ML0425201702004-02-18018 February 2004 E-mail Dated 2/18/04 Re RAI from I&C - Waterford Project stage: RAI ML0405506052004-02-20020 February 2004 Westinghouse Request Withholding from Public Disclosure, Waterford 3, Extended Power Uprate, Appendix 1 - Safety Evaluation Report Compliance, MC1355 Project stage: Approval ML0425201712004-02-23023 February 2004 E-mail Dated 2/23/04 Waterford RAI Containment Systems Project stage: RAI ML0406310552004-02-26026 February 2004 Summary of Entergy Operations, Inc. Presentation of Extended Power Uprate Project stage: Other ML0426704852004-03-0202 March 2004 E-mail from D. Miller to K. Kalyanam Re RAI from J. Tsao Project stage: Other ML0426704892004-03-0202 March 2004 E-mail from B. Miller to N. Kalyanam RAI from SPLB-Angelo Stubbs Project stage: RAI W3F1-2004-0017, Supplement to Amendment Request NPF-38-249 Regarding Extended Power Uprate2004-03-0404 March 2004 Supplement to Amendment Request NPF-38-249 Regarding Extended Power Uprate Project stage: Supplement ML0406909622004-03-0909 March 2004 Extended Power Uprate Acceptance Review Project stage: Acceptance Review ML0407809952004-03-16016 March 2004 RAI, Proposed Revision to Facility Operation License and TSs - Extended Power Uprate Request Project stage: RAI ML0408506542004-03-24024 March 2004 RAI Related to Revision to Facility Operating License and TSs - Extended Power Uprate Request Project stage: RAI ML0412102452004-03-26026 March 2004 Request for Additional Information, Revision to Facility Operating License & Technical Specifications - Extended Power Uprate Request Project stage: RAI ML0409102392004-03-31031 March 2004 RAI Related to Revision to Facility Operating License and TSs - Extended Power Uprate Request Project stage: RAI ML0410005142004-04-0808 April 2004 RAI Related to Revision to Facility Operating License and TSs - Extended Power Uprate Request Project stage: RAI W3F1-2004-0029, Extended Power Uprate, Waterford, Unit 3 Supplement to Amendment Request2004-04-15015 April 2004 Extended Power Uprate, Waterford, Unit 3 Supplement to Amendment Request Project stage: Supplement ML0411301942004-04-20020 April 2004 RAI Related to Revision to Facility Operating License and TSs - Extended Power Uprate Request Project stage: RAI ML0412705672004-05-0404 May 2004 RAI, Revision to Facility Operating License and TSs - Extended Power Uprate Request Project stage: RAI W3F1-2004-0035, Supplemental to Amendment Request for Extended Power Uprate2004-05-0707 May 2004 Supplemental to Amendment Request for Extended Power Uprate Project stage: Supplement W3F1-2004-0028, License Amendment Request NPF-38-254, Reactor Coolant System Leakage Detection2004-05-0707 May 2004 License Amendment Request NPF-38-254, Reactor Coolant System Leakage Detection Project stage: Request W3F1-2004-0037, Supplement to Amendment Request NPF-38-249, Extended Power Uprate2004-05-12012 May 2004 Supplement to Amendment Request NPF-38-249, Extended Power Uprate Project stage: Supplement ML0413801452004-05-13013 May 2004 Supplement to Amendment Request NPF-38-249, Extended Power Uprate Project stage: Supplement W3F1-2004-0043, Supplement to Amendment Request NPF-38-249, Extended Power Uprate2004-05-21021 May 2004 Supplement to Amendment Request NPF-38-249, Extended Power Uprate Project stage: Supplement W3F1-2004-0047, Supplement to Amendment Request NPF-38-249, Extended Power Uprate2004-05-26026 May 2004 Supplement to Amendment Request NPF-38-249, Extended Power Uprate Project stage: Supplement ML0417405772004-06-21021 June 2004 RAI, Revision to Facility Operating License and Technical Specifications - Extended Power Uprate Request, TAC MC1355 Project stage: RAI ML0420202942004-07-15015 July 2004 License Amendment Request NPF-38-256, Alternate Source Term Project stage: Request W3F1-2004-0061, Supplement to Amendment Request NPF-38-249, Extended Power Uprate2004-07-28028 July 2004 Supplement to Amendment Request NPF-38-249, Extended Power Uprate Project stage: Supplement ML0421100882004-07-29029 July 2004 Meeting with Entergy to Discuss Issues with Extended Power Uprate and Alternate Source Term Submittals Project stage: Request ML0422303352004-08-10010 August 2004 August 11, 12 and 13, 2004 Meeting with Westinghouse Re Waterford Main Steam Line Break, Feedwater Line Break and EPU Project stage: Meeting W3F1-2004-0068, Supplement to Amendment Request NPF-38-249 Extended Power Uprate2004-08-10010 August 2004 Supplement to Amendment Request NPF-38-249 Extended Power Uprate Project stage: Supplement W3F1-2004-0071, Supplement to Alternate Source Term Submittal2004-08-19019 August 2004 Supplement to Alternate Source Term Submittal Project stage: Request ML0423904892004-08-26026 August 2004 Meeting with Entergy to Discuss Issues with Extended Power Uprate and Alternate Source Term Submittals Project stage: Meeting W3F1-2004-0076, To Amendment Request NPF-38-256, Alternate Source Term2004-09-0101 September 2004 To Amendment Request NPF-38-256, Alternate Source Term Project stage: Other W3F1-2004-0078, Supplement to Amendment Request NPF-38-249, Extended Power Uprate2004-09-14014 September 2004 Supplement to Amendment Request NPF-38-249, Extended Power Uprate Project stage: Supplement ML0427505192004-09-29029 September 2004 RAI Extended Power Uprate Request and Alternate Source Term Request Project stage: RAI ML0427402482004-09-30030 September 2004 (3) Steam Elecric Station, 3, Draft EA and Finding of No Significant Impact Related to a Proposed License Amendment to Increase the Licensed Power Level (Tac. MC1355) Project stage: Draft Other W3F1-2004-0086, Supplement to Amendment Request NPF-38-249, Extended Power Uprate2004-10-0808 October 2004 Supplement to Amendment Request NPF-38-249, Extended Power Uprate Project stage: Supplement W3F1-2004-0092, Supplement to Amendment Request NPF-38-249 Extended Power Uprate2004-10-0808 October 2004 Supplement to Amendment Request NPF-38-249 Extended Power Uprate Project stage: Supplement W3F1-2004-0085, Schedule Clarification for Amendment Request NPF-38-249, Extended Power Uprate2004-10-13013 October 2004 Schedule Clarification for Amendment Request NPF-38-249, Extended Power Uprate Project stage: Other W3F1-2004-0095, To Amendment Request NPF-38-256 Alternate Source Term2004-10-13013 October 2004 To Amendment Request NPF-38-256 Alternate Source Term Project stage: Other W3F1-2004-0101, To Amendment Request NPF-38-256, Alternate Source Term, Waterford Steam Electric Station, Unit 32004-10-19019 October 2004 To Amendment Request NPF-38-256, Alternate Source Term, Waterford Steam Electric Station, Unit 3 Project stage: Other ML0430102382004-10-21021 October 2004 Supplement to Amendment Request NPF-38-249, Extended Power Uprate Project stage: Supplement ML0431006112004-10-26026 October 2004 RAI - Revision to Facility Operating License and Technical Specifications - Extended Power Uprate Request Project stage: RAI W3F1-2004-0089, Supplement to Amendment Request NPF-38-2492004-10-29029 October 2004 Supplement to Amendment Request NPF-38-249 Project stage: Supplement W3F1-2004-0107, Supplement to Amendment Request NPF-38-2492004-10-29029 October 2004 Supplement to Amendment Request NPF-38-249 Project stage: Supplement 2004-03-04
[Table View] |
Text
. -.- -
- 1. I I--
I.
-..1. -
11.--.
.. I -
-
N. Kaly Kalyanam - RAI from Rich Lobel, SPLB H,
Pagei1 From:
N. Kaly Kalyanam To:
Bryan Miller Date:
2/23/04 9:20AM*
Subject:
RAI from Rich Lobel, SPLB
- Bryan, I am attaching the draft RAI from DSSA/SPSB (C), Containment. Systems, Rich Lobel.
Please review the questions and let me know if Waterford 3 can provide the response within 30 days from the receipt of the final RAI.
Thanks Kaly V C I rs 15-1-K-
N.
Kly alyaam M~
355-RI frm Robe~wpdPag 1
1 N._.a!y Iyn.-.YC1355
- RAI frog qbplypd Paqe 1 4 REQUEST FOR ADDITIONAL INFORMATION ENTERGY OPERATIONS, INC.
WATERFORD STEAM ELECTRIC STATION. UNIT 3 DOCKET NO. 50-382
- 1.
(a) Verify that all input parameters to the containment peak pressure and temperature (both loss of coolant accident (LOCA) and main steam line break (MSLB)), minimum pressure (LOCA), environmental qualification (EQ) and subcompartment analyses remain the same as those in the final safety analyses report (FSAR) except for those affected by the power uprate. For example: containment volume, heat sink descriptions, heat exchanger performance, equipment flow rates and flow temperatures, initial relative humidity, refueling water storage tank temperature, ultimate heat sink temperature, etc.
Justify any changes made for the power uprate analyses. Verify that measurement uncertainty was conservatively included in these values.
(b) Explain what is meant by the statement on page 2.5-8 of the November 13, 2003, submittal that "... instrument measurement uncertainty is implicitlv considered in accordance with the graded approach in containment pressure and temperature response analyses."
(c) Verify that the measurement uncertainty was included in the determination of the following input to the containment LOCA and MSLB calculations:
initial containment temperature initial containment pressure initial containment spray riser level component cooling water flow to fan coolers component cooling water temperature According to Page 6.2-4 of the FSAR, it appears that nominal values were used, not the values with measurement uncertainty included.
Verify that the same version of the GOTHIC code is used as in Waterford 3 license Amendment 165.
Verify that the same assumptions are made regarding the use of 8 percent reevaporation as in the FSAR (Page 6.2-8).
- 4.
Verify that the MSLB break area is adjusted to provide dry steam to the containment, as described in the FSAR (Page 6.2-8).
- 5.
Verify that the methods for calculating the EQ envelope have not changed from those described in the FSAR. Were calculations of the velocity currents at the surface of vital equipment recalculated?