August 11, 12 and 13, 2004 Meeting with Westinghouse Re Waterford Main Steam Line Break, Feedwater Line Break and EPU
ML042230335
Person / Time
Site: Waterford Entergy icon.png
Issue date: 08/10/2004
From: Kalyanam N
NRC/NRR/DLPM/LPD4
To: Gramm R
NRC/NRR/DLPM/LPD4
Kalyanam N,NRR/DLPM,415-1480
References
TAC MC1355
Download: ML042230335 (4)


Text

August 10, 2004 CLOSED MEETING MEMORANDUM TO: Robert A. Gramm, Chief, Section 1 Project Directorate IV Division of Licensing Project Management FROM: N. Kalyanam, Project Manager, Section 1/RA/

Project Directorate IV Division of Licensing Project Management

SUBJECT:

FORTHCOMING AUDIT AT WESTINGHOUSE ELECTRIC CORPORATION AT WINDSOR, CONNECTICUT, RE.: ENTERGY OPERATIONS, INC. (ENTERGY) WATERFORD STEAM ELECTRIC STATION, UNIT 3 (WATERFORD 3) (TAC NO. MC1355)

DATE & TIME: Wednesday, August 11, 12.30 to 5.00 PM, Thursday, and Friday, August 12, and 13, 2004, 9:00 AM to 5:00 PM, (as needed).

LOCATION: Westinghouse Electric Corporation 20 International Drive Windsor, CT 06095 PURPOSE: Meet with Westinghouse to review calculations and other documentation, as needed, pertaining to the main steam line break, feedwater line break, and loss of flow analyses for the Waterford 3 extended power uprate (EPU).

The meeting is closed to public attendance since virtually all of the information reviewed and may be discussed will be proprietary to Westinghouse, as will any documentation that NRC personnel may wish to temporarily use for confirmatory purposes. Any information developed during the visit that would be used in the EPU safety evaluation will be reviewed by Westinghouse to ensure that it is not proprietary.

PARTICIPANTS: Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR).

NRC Westinghouse S. Miranda, NRR Steve O'Hearn Earl Schulz P. Clifford, NRR Sue Jaquith George Hess et. al.

Docket No. 50-382 cc: See next page MEETING CONTACTS: N. Kalyanam, NRR 301-415-1480 nxk@nrc.gov

August 10, 2004 CLOSED MEETING MEMORANDUM TO: Robert A. Gramm, Chief, Section 1 Project Directorate IV Division of Licensing Project Management FROM: N. Kalyanam, Project Manager, Section 1/RA/

Project Directorate IV Division of Licensing Project Management

SUBJECT:

FORTHCOMING AUDIT AT WESTINGHOUSE ELECTRIC CORPORATION AT WINDSOR, CONNECTICUT, RE.: ENTERGY OPERATIONS, INC. (ENTERGY) WATERFORD STEAM ELECTRIC STATION, UNIT 3 (WATERFORD 3) (TAC NO. MC1355)

DATE & TIME: Wednesday, August 11, 12.30 to 5.00 PM, Thursday, and Friday, August 12, and 13, 2004, 9:00 AM to 5:00 PM, (as needed).

LOCATION: Westinghouse Electric Corporation 20 International Drive Windsor, CT 06095 PURPOSE: Meet with Westinghouse to review calculations and other documentation, as needed, pertaining to the main steam line break, feedwater line break, and loss of flow analyses for the Waterford 3 extended power uprate (EPU).

The meeting is closed to public attendance since virtually all of the information reviewed and may be discussed will be proprietary to Westinghouse, as will any documentation that NRC personnel may wish to temporarily use for confirmatory purposes. Any information developed during the visit that would be used in the EPU safety evaluation will be reviewed by Westinghouse to ensure that it is not proprietary.

PARTICIPANTS: Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR).

NRC Westinghouse S. Miranda, NRR Steve O'Hearn Earl Schulz P. Clifford, NRR Sue Jaquith George Hess et. al.

Docket No. 50-382 cc: See next page MEETING CONTACTS: N. Kalyanam, NRR 301-415-1480 nxk@nrc.gov DISTRIBUTION: See attached page Accession Number: ML042230335 OFFICE PDIV-1/PM PDIV-1/SC NAME NKalyanam RGramm DATE 8/10/04 8/10/04 OFFICIAL RECORD COPY

DISTRIBUTION FOR FORTHCOMING MEETING WITH WESTINGHOUSE ON AUGUST 11, 12, AND 13, 2004.

Dated: August 10, 2004 Hardcopy:

PUBLIC PDIV-1 Reading E-Mail:

RidsNrrAdpt (BSheron) RidsNrrDlpm (TMarsh/JLyons)

RidsNrrDlpmLpdiv (HBerkow) RidsNrrDlpmLpdiv1 (RGramm)

RidsNrrLADBaxley RidsNrrLADJohnson KGrimes RidsOpaMail JDixon-Herrity S. Miranda P. Clifford Chu-Yu Liang J. Uhle TMensah RidsOgcRp RidsAcrsAcnwMailCenter RidsRgn4MailCenter(AHowell/BHenderson)

Waterford Steam Electric Station, Unit 3 cc:

Mr. Michael E. Henry, State Liaison Officer Regional Administrator, Region IV Department of Environmental Quality U.S. Nuclear Regulatory Commission Permits Division 611 Ryan Plaza Drive, Suite 400 P.O. Box 4313 Arlington, TX 76011 Baton Rouge, Louisiana 70821-4313 Parish President Council Vice President Operations Support St. Charles Parish Entergy Operations, Inc. P. O. Box 302 P. O. Box 31995 Hahnville, LA 70057 Jackson, MS 39286-1995 Executive Vice President Director & Chief Operating Officer Nuclear Safety Assurance Entergy Operations, Inc.

Entergy Operations, Inc. P. O. Box 31995 17265 River Road Jackson, MS 39286-1995 Killona, LA 70066-0751 Chairman Wise, Carter, Child & Caraway Louisiana Public Services Commission P. O. Box 651 P. O. Box 91154 Jackson, MS 39205 Baton Rouge, LA 70825-1697 General Manager Plant Operations Waterford 3 SES Entergy Operations, Inc.

17265 River Road Killona, LA 70066-0751 Licensing Manager Entergy Operations, Inc.

17265 River Road Killona, LA 70066-0751 Winston & Strawn 1400 L Street, N.W.

Washington, DC 20005-3502 Resident Inspector/Waterford NPS P. O. Box 822 Killona, LA 70066-0751 June 2004