Alternate Source Term (AST)
Topic |
|---|
| Related to a project | |
|---|
| Title | | | Start date | Site | Title |
|---|
| ML25345A481 | 21 December 2025 | 99902049 | ML25345A481-SMR (Holtec) Draft Safety Evaluation of Licensing Topical Report HI-2241098, SMR Design Basis Radiological Consequences Analysis Methodology, Revision 1 | | ML25344A418 | 18 December 2025 | Surry North Anna | Withdrawal of Amendment Request to Update Main Steam Line Break Alternative Source Term Dose Consequences Analysis | | ML25343A103 | 12 December 2025 | Hatch | Southern Nuclear Company Presentation Materials for December 12, 2025, Power Uprate Public Meeting | | ML25258A158 | 12 December 2025 | Saint Lucie | Issuance of Amendment No. 213 to Revise TS 5.6.3, Core Operating Limits Report, by Updating the Listing of NRC-Approved Analytical Methods Used to Determine the Core Operating Limits (EPID L-2024-LLA-0124) - Non-Proprietary | | ML25219A009 | 11 December 2025 | Browns Ferry | Subsequent Renewed License - DPR-33 | | ML25219A011 | 11 December 2025 | Browns Ferry | Subsequent Renewed License - DPR-68 | | ML25219A010 | 11 December 2025 | Browns Ferry | Subsequent Renewed License - DPR-52 | | ML25330A004 | 11 December 2025 | Wolf Creek | – Request for Partial Site Release for Facility Operating License No. NPF-42 (EPID: L-2025-Lll- 0012) (Docket Number: 50-482) | | ML25344A421 | 10 December 2025 | Vogtle | NRR E-mail Capture - Fyi - Revised Estimate - Vogtle - Units 1 and 2 - Alternate Source Term RG 1.183 Rev. 1 (L-2025-LLA-0080) | | ULNRC-06972, Operating Quality Assurance Manual (Oqam), Revision 38 | 9 December 2025 | Callaway | Operating Quality Assurance Manual (Oqam), Revision 38 |
|
|---|