Alternate Source Term (AST)
Topic |
---|
Related to a project | | Start date | Site | Project | Title |
---|
ML24299A264 | 25 October 2024 | Limerick | EPID:L-2024-LLA-0115 | Response to Request for Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding Primary Containment Leakage Technical Specifications | ML24283A144 | 16 October 2024 | Surry North Anna | EPID:L-2024-LRM-0106 | Main Steam Line Break Accident Analysis LAR Pre-Application Meeting | ML24274A237 | 7 October 2024 | Limerick | EPID:L-2024-LLA-0115 | – Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding Primary Containment Leakage Technical Specifications | ML24270A211 | 4 October 2024 | Farley | EPID:L-2024-LRM-0108 | September 23, 2024, Summary of Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Company, Inc., Regarding Proposed LAR to Be Excepted from Footnote 11 Listed in Regulatory Guide 1.183, Rev. 0, for Farley 1 & 2 | NL-24-0320, License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3,. | 27 September 2024 | Farley | EPID:L-2024-LLA-0136 | License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3,. | ML24260A079 | 23 September 2024 | Farley | EPID:L-2024-LRM-0108 | 9/23/2024 Pre-Submittal Meeting - Joseph M. Farley Nuclear Plant, Units 1 and 2, LAR to Change UFSAR for Exception to RG 1.183, Revision 0, Table 3 - Footnote 11 (EPID L-2024-LRM-0108) - Meeting Slides | ML24199A171 | 17 September 2024 | Wolf Creek | EPID:L-2023-LLA-0164 | Issuance of Amendment No. 241 Revise Ventilation Filter Testing Program Criteria and Administrative Correction of Absorber in Technical Specification 5.5.11 | ML24211A230 | 11 September 2024 | Clinton | EPID:L-2023-LLA-0088 | – Request for Partial Site Release for Facility Operating License No. NPF-62 | ML24165A038 | 4 September 2024 | FitzPatrick | EPID:L-2023-LLA-0109 | Issuance of Amendment No. 356 Update Fuel Handling Accident Analysis | ML24241A195 | 28 August 2024 | Limerick | EPID:L-2024-LLA-0115 | License Amendment Request for Modification to Technical Specification 3.6.1.2 and Main Steam Isolation Valve Leakage Rate Requirements |
|
---|
Title | | Start date | Site | Title |
---|
RS-24-101, License Amendment Request for One-Time Extension of Standby Gas Treatment System Technical Specifications Completion Time to Support Piping Repair | 4 November 2024 | Quad Cities | License Amendment Request for One-Time Extension of Standby Gas Treatment System Technical Specifications Completion Time to Support Piping Repair | ML24299A264 | 25 October 2024 | Limerick | Response to Request for Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding Primary Containment Leakage Technical Specifications | ML24201A068 | 21 October 2024 | | DG-1427 (RG 1.257 Rev 0) Qualification of Fiber-Optic Cables, Connections, and Optical Fiber Splices for Use in Safety Systems for Production and Utilization Facilities | ML24283A144 | 16 October 2024 | Surry North Anna | Main Steam Line Break Accident Analysis LAR Pre-Application Meeting | ML24207A019 | 9 October 2024 | FitzPatrick | SE Addendum Related to the License Amendment No. 338 for Implementation of the Alternative Source Term (DPO-2021-001) | ML24274A237 | 7 October 2024 | Limerick | – Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding Primary Containment Leakage Technical Specifications | ML24270A211 | 4 October 2024 | Farley | September 23, 2024, Summary of Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Company, Inc., Regarding Proposed LAR to Be Excepted from Footnote 11 Listed in Regulatory Guide 1.183, Rev. 0, for Farley 1 & 2 | NL-24-0320, License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3,. | 27 September 2024 | Farley | License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3,. | ML24260A079 | 23 September 2024 | Farley | 9/23/2024 Pre-Submittal Meeting - Joseph M. Farley Nuclear Plant, Units 1 and 2, LAR to Change UFSAR for Exception to RG 1.183, Revision 0, Table 3 - Footnote 11 (EPID L-2024-LRM-0108) - Meeting Slides | PMNS20241176, Pre-submittal Meeting with Dominion Energy Regarding a Planned License Amendment Request for North Anna Power Station and Surry Power Station to Revise Selected Alternate Source Term Dose Consequence Analyses | 23 September 2024 | Surry North Anna | Pre-submittal Meeting with Dominion Energy Regarding a Planned License Amendment Request for North Anna Power Station and Surry Power Station to Revise Selected Alternate Source Term Dose Consequence Analyses |
|
---|