Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217G4151999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Cpses,Units 1 & 2 TXX-9920, Monthly Operating Repts for Aug 1999 for Cpses.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Cpses.With ML20210U4081999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Cpses,Units 1 & 2 ML20209G0801999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Cpses,Units 1 & 2 ML20195G5141999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Comanche Peak Steam Electric Station,Units 1 & 2.With ML20196L2241999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Cpses,Units 1 & 2 ML20205N3101999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Cpses,Units 1 & 2 ML20205N1481999-02-28028 February 1999 Corrected Monthly Operating Rept for Feb 1999 for CPSES, Units 1 & 2 ML20204H6371999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Comanche Peak Units 1 & 2 ML20199E9961998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Cpses,Units 1 & 2 ML20197K2371998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Cpses,Units 1 & 2 ML20195F3161998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Cpses,Units 1 & 2 ML20154M8841998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Cpses,Units 1 & 2 ML20151W0361998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Cpses,Units 1 & 2. with ML20237C6721998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Cpses,Units 1 & 2 ML20236R0711998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Cpses,Units 1 & 2 ML20249B2581998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Cpses,Units 1 & 2 ML20247G3241998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Cpses,Units 1 & 2 ML20216J3061998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Cpses,Units 1 & 2 ML20216J1861998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Comanche Peak Steam Electric Station ML20202H0431998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Cpses,Units 1 & 2 ML20198N7141997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Cpses,Units 1 & 2 ML20197J0941997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for CPSES Units 1 & 2 ML20199D2261997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Cpses,Units 1 & 2 TXX-9721, Monthly Operating Repts for Sept 1997 for Comanche Peak Steam Electric Station1997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Comanche Peak Steam Electric Station ML20212C4851997-08-31031 August 1997 Revised Monthly Operating Rept for Aug 1997 for CPSES Unit 2 ML20210V2101997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for CPSES ML20141J3911997-07-31031 July 1997 Monthly Operating Repts for July 1997 for CPSES ML20149E2991997-06-30030 June 1997 Monthly Operating Repts for June 1997 for CPSES TXX-9713, Monthly Operating Repts for May 1997 for CPSES1997-05-31031 May 1997 Monthly Operating Repts for May 1997 for CPSES TXX-9710, Monthly Operating Repts for Apr 1997 for Comanche Peak Steam Electric Station1997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Comanche Peak Steam Electric Station TXX-9708, Monthly Operating Repts for Mar 1997 for CPSES Units 1 & 21997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for CPSES Units 1 & 2 ML20137B9781997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for CPSES Units 1 & 2 ML20134Q2521997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Comanche Peak Steam Electric Station,Units 1 & 2 ML20137B9901997-01-31031 January 1997 Revised MOR for Jan 1997 CPSES Unit 2 ML20133M1971996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Comanche Peak Steam Electric Station Units 1 & 2 ML20132C1631996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Comanche Peak Steam Electric Station TXX-9650, Monthly Operating Repts for Oct 1996 for Comanche Peak Steam Electric Station1996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Comanche Peak Steam Electric Station ML20129F1601996-09-30030 September 1996 Revised Monthly Operating Repts for Sept 1996 for Comanche Peak Steam Electric Station,Units 1 & 2 ML20129B2401996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Comanche Peak Steam Electric Station ML20117N5201996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Comanche Peak Steam Electric Station ML20116N6651996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Comanche Peak Unit 1 & 2 TXX-9640, Monthly Operating Rept for June 1996 for Comanche Peak Electric Station1996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Comanche Peak Electric Station TXX-9638, Monthly Operating Repts for May 1996 for Comanche Peak Steam Electric Station Units 1 & 21996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Comanche Peak Steam Electric Station Units 1 & 2 ML20112A1951996-04-30030 April 1996 Monthly Operating Repts for April 1996 for CPSES TXX-9610, Monthly Operating Repts for March 1996 for CPSES1996-03-31031 March 1996 Monthly Operating Repts for March 1996 for CPSES ML20101D0461996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Comanche Peak Steam Electric Station Units 1 & 2 TXX-9601, Monthly Operating Repts for Jan 1996 for Comanche Peak Steam Electric Station,Units 1 & 21996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Comanche Peak Steam Electric Station,Units 1 & 2 ML20101D0511996-01-31031 January 1996 Revised Monthly Operating Rept for Jan 1996 for Comanche Peak Steam Electric Station Unit 1 ML20096E7381995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Comanche Peak Steam Electric Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217E8021999-10-0707 October 1999 CPSES Unit 1 Cycle 8 Colr ML20217G4151999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Cpses,Units 1 & 2 ML20212F7671999-09-24024 September 1999 SER Granting Relief Request C-4 Pursuant to 10CFR50.55a(g)(6)(i) for Unit 2,during First 10-year ISI Interval & Relief Requests B-15,B-16 & B-17 Pursuant to 10CFR50.55a(g)(6)(i) ML20216J5701999-09-16016 September 1999 Rev 2 to CPSES Unit 2 Cycle 5 Colr TXX-9920, Monthly Operating Repts for Aug 1999 for Cpses.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Cpses.With ML20211M2981999-08-0606 August 1999 Rev 1 to CPSES Fuel Storage Licensing Rept, CPSES Credit for Soluble Boron & Expansion of Spent Fuel Storage Capacity, Consisting of Revised Title Page and 4-1 ML20210U4081999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Cpses,Units 1 & 2 ML20210D8321999-07-23023 July 1999 Safety Evaluation Accepting Relief Requests Re Use of 1998 Edition of Subsections IWE & Iwl of ASME Code for Containment Insp ML20209H7661999-07-15015 July 1999 Safety Evaluation Accepting GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Comanche Peak Steam Electric Station,Units 1 & 2 ML20209H2721999-07-0909 July 1999 2RF04 Containment ISI Summary Rept First Interval,First Period,First Outage ML20209H2631999-07-0909 July 1999 2RF04 ISI Summary Rept First Interval,Second Period,Second Outage ML20209G7501999-07-0808 July 1999 SER Finding That Licensee Individual Plant Exam of External Events Complete with Regard to Info Requested by Suppl 4 to GL 88-20 & That IPEEE Results Reasonable Given Design, Operation & History of Comanche Peak Steam Electric Station ML20196L0191999-07-0808 July 1999 Safety Evaluation Granting Request Relief B-6 (Rev 2),B-7 (Rev2),B-12,B-13,B-14 & C-9,pursuant to 10CFR50.55a(g)(6)(i).Technical Ltr Rept Also Encl ML20210J9391999-06-30030 June 1999 CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 ML20209G0801999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Cpses,Units 1 & 2 ML20196J0621999-06-29029 June 1999 Safety Evaluation Supporting Proposed Changes to Emergency Plan Re Licenses NPF-87 & NPF-89 Respectively ML20195G5141999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Comanche Peak Steam Electric Station,Units 1 & 2.With ML20216E0711999-05-21021 May 1999 1999 Graded Exercise - Comanche Peak Steam Electric Station ML20206Q0091999-05-14014 May 1999 Safety Evaluation Accepting GL 92-08, Thermo-Lag 330-1 Fire Barriers, Dtd 921217,for Comanche Peak Electric Station,Unit 1 ML20206H2061999-05-0606 May 1999 SER Accepting Exemption to App K Re Leading Edge Flowmeter for Plant,Units 1 & 2 ML20196L2241999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Cpses,Units 1 & 2 ML20205R5701999-04-14014 April 1999 Rev 6 to ER-ME-067, TU Electric Engineering Rept,Evaluation of Thermo-Lag Fire Barrier Sys ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected ML20205J7831999-04-0101 April 1999 Rev 0 to ERX-99-001, CPSES Unit 2 Cycle 5 Colr ML20205N3101999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Cpses,Units 1 & 2 ML20204H6371999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Comanche Peak Units 1 & 2 ML20205N1481999-02-28028 February 1999 Corrected Monthly Operating Rept for Feb 1999 for CPSES, Units 1 & 2 ML20203A4881999-02-0303 February 1999 Safety Evaluation Granting Requests for Relief B-3 - B-6,C-2 & C-3 for Plant,Unit 2 ML20210J9201999-02-0101 February 1999 CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802- 990201 ML20202D0101999-01-27027 January 1999 Safety Evaluation Supporting First 10-yr Interval ISI Program Plan Requests for Relief B-9,B-10 & B-11 for CPSES, Unit 1 ML20199E9961998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Cpses,Units 1 & 2 ML20207D6091998-12-31031 December 1998 1998 Annual Operating Rept for Cpses,Units 1 & 2. with ML20197K2371998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Cpses,Units 1 & 2 ML20195F3161998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Cpses,Units 1 & 2 ML20154M8841998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Cpses,Units 1 & 2 ML20154B5741998-09-30030 September 1998 Safety Evaluation Re Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety- Related Motor-Operated Valves. Licensee Has Established Acceptable Program ML20151W0361998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Cpses,Units 1 & 2. with ML20151Q1211998-08-14014 August 1998 Rev 0 to Control of Hazard Barriers ML20237C4061998-08-14014 August 1998 Safety Evaluation Supporting Request to Implement Risk Informed IST Program ML20237C6721998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Cpses,Units 1 & 2 ML20236V3121998-07-29029 July 1998 Final Part 21 Rept Re Enterprise DSR-4 & DSRV-4 Edgs.Short Term Instability Was Found During post-installation Testing & Setup as Part of Design mod/post-work Testing Process. Different Methods Were Developed to Correct Problem ML20236R0711998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Cpses,Units 1 & 2 ML20249B2581998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Cpses,Units 1 & 2 ML20248A1671998-05-22022 May 1998 Interim Part 21 Re Enterprise DSR-4 & DSRV-4 Emergency diesel.Post-installation Testing Revealed,High Em/Rfi Levels Affected New Controllers,Whereas Original Controllers Were unaffected.Follow-up Will Be Provided No Later than 980731 ML20247G3241998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Cpses,Units 1 & 2 ML20216B8661998-04-0101 April 1998 Rev 0 to ERX-98-001, CPSES Unit 1 Cycle 7 Colr ML20216J3061998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Cpses,Units 1 & 2 ML20216J1861998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Comanche Peak Steam Electric Station ML20197A6951998-02-24024 February 1998 Inservice Insp Summary Rept,First Interval,Second Period, First Outage ML20199J5391998-02-0202 February 1998 CPSES Commitment Matl Change Evaluation Rept 0002 for 960202-970801 1999-09-30
[Table view] |
Text
,
= Log # TXX-97131 File # 10010.2
+
F7
= = Ref. # 10CFR50.36
= --
7t#ELECTR/C' June 13, 1997 C. Lance Terry Grnp We President U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 J
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50 445 AND 50 446 MONTHLY OPERATING REPORT FOR MAY 1997 Gentlemen:
Attached is the Monthly Operating Report for May 1997, prepared and ;
submitted pursuant to Technical Specification 6.9.1.5 contained in Appendix A to the Comanche Peak Steam Electric Station Units 1 and 2, Operating License Nos. NPF 87 and NPF 89, respectively. During this reporting period, there have been no failures or challenges to the Power Operated Relief Valves (PORVs) or Safety Valves (SVs) for CPSES units 1 and 2. Should you have any questions, please contact Jacob M. Kulangara at (817) 897-0124. i Sincerely, e.g.
C. L. Terry l By: attf34 -
Roger 4D. Walker Regulatory Affairs Manager JMK/jmk r.
Attachment V cc:: Mr. E. W. Herschoff, Region IV Mr. J. I. Tapia, Region IV h(v y
Mr. T. J. Polich. NPR Resident Inspectors I
\
\
9706190188 970531 7 l!! !h!!!!!hiiii PDR ADOCK 05000445 R PDR 180042 P. O. Box 1002 Glen Rose Texas 76643
Attac'hment to TXX 97131 Page 1 of 8 "
l ., . COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 1 i NRC HONTHLY OPERATING REPORT ,
l DOCKET NO.: 50 445 l UNIT: CPSES 1 DATE: 6/ 9/97 I COMPLETED BY: Bob Reible I TELEPHONE: 817 897 0449 OPERATING STATUS
- 1. REPORTING PERIOD: HAY 1997 GROSS HOURS IN REPORTING PERIOD: 744
- 2. CURRENTLY AUTHORIZED POWER LEVEL (HWt): 3411 MAX. DEPEND. CAPACITY (HWe Net): 1150
- DESIGN ELECTRICAL RATING (HWe Net): 1150 i
- 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (HWe Net): NONE
- 4. REASON FOR RESTRICTION (IF ANY): ,
THIS HONTH YR TO DATE CUMULATIVE l
- 5. NUMBER OF HOURS REACTOR WAS CRITICAL 744 3.623 49,717
- 6. REACTOR RESERVE SHUTDOWN HOURS 0 0 2,604
- 7. HOURS GENERATOR ON LINE 744 3,623 49,077 ;
- 8. UNIT RESERVE SHUTDOWN HOURS 0 0 0
- 9. GROSS THERHAL ENERGY GENERATED (HWH) 2.531,275 12.324,074 159.773.526
- 10. GROSS ELECTRICAL ENERGY GENERATED (HWH) 857,168 4.182.946 53.371,476
- 11. NET ELECTRICAL ENERGY GENERATED (HWH) 822,320 4.018.236 50,941,665
- 12. REACTOR SERVICE FACTOR 100.0 100.0 83.4
- 13. REACTOR AVAILABILITY FACTOR 100.0 100.0 87.8
- 14. UNIT SERVICE FACTOR 100.0 100.0 82.3
- 15. UNIT AVAILABILITY FACTOR 100.0 100.0 82.3
- 16. UNIT CAPACITY FACTOR (USING HDC) 96.1 96.4 74.3
- 17. UNIT CAPACITY FACTOR (USING DESIGN HWe) 96.1 96.4 74.3
- 18. UNIT FORCED OUTAGE RATE 0.0 0.0 4.4
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 HONTHS (TYPE, DATE, AND DURATION OF EACH):
l
- 20. IF SHUTDOWN AT END OF REPORTING PERIOD, ESTIMATED DATE OF STARTUP:
- 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): ACHIEVED COMMERCIAL OPERATION: 900813
.-. - .. - . _ _ . . - . - - - . . . ~ _ . . . . . - - . . _ - . - - - . - . . . . . . . . - - . - . . _ . _ . .-.
! Attachment to TXX 97131
! Page 2 of 8 l AVERAGE DAILY UNIT POWER LEVEL
, DOCKET NO.: 50 445 UNIT: CPSES 1 DATE: 6/ 9/97 COMPLETED BY: Bob Reible TELEPHONE: 817 897 0449 l
MONTH: MAY 1997 l ,
AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL -
DAY (MWe Net) DAY (HWe Net)
I 1 1111 17 1108 -
2 1111 18 1107 3 1111 19 1106 4 1111 20 1106 5 lill 21 1107 6 1110 22 1107 i
7 1110 23 1107 ,
I 8 1109 24 1107 l
9 1100 25 1106 10 1042 26 1105 11 1109 27 1104 12 1109 28 1104 13 1109 29 1104 14 1109 30 1104 i
15 1108 31 1103 16 1108 1
l
_ _ . . . _ _ _ .. .._.___.--_... _ __=_..__ _._. _ -._._- _ .. _. .._ . .. . -.-. _ .. _ _ _
t
- Attachment to TXX 97131 Page 3 of 8 i .
l
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH
. DOCKET NO.: 50 445 l UNIT: CPSES 1 l l DATE: 6/ 9/97 I COMPLETED BY: Bob Reible TELEPHONE: 817 897 0449 l MONTH: MAY 1997 i
DAY TIME REMARK / MODE l 05/01 0000 Unit began the month at 100% power.
t 05/31 2400 Unit ended the month at 1001 power.
6 i
.\
i j
. - = - -. ,, .. - .= - -=. ._.
Attachment to TXX-97131 !
Page 4 of 8 ,
f
. l-UNIT SHUTDOWNS AND POWER REDUCTIONS
~
DOCKET NO.: 50-445 UNIT: CPSES 1 '
DATE: 6/ 9/97 '
COMPLETED BY: Bob Reible I TELEPHONE: 817-897-0449 ,
REPORT MONTH. MAY 1997 METHOD OF t TYPE SHUTTING DOWN i F: FORCED DURATION THE REACTOR OR !
NO DATE S: SCHEDULED (HOURS) PIASON REDUCING POWER CORRECTIVE ACTIONS /COPMENTS None
- 1) REASON 2) METHOD A: EQUIPMENT FAILURE (EXPLAIN) E: OPERATOR TRAINING AND LICENSE EXAMINATION 1: MANUAL B: MAINT OR TEST F: ADMINISTRATIVE 2: MANUAL SCRAM C: REFUELING G: OPERATIONAL ERROR (EXPLAIN) 3: AUTOMATIC SCRAM D: REGULATORY RESTRICTION H: OTHER (EXPLAIN) 4: OTHER (EXPLAIN)
Nr --w,-
~
Attachment to TXX 97131.
Page 5 of 8 "
., . COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 2 NRC MONTHLY OPERATING REPORT DOCKET NO.: 50 446 UNIT: CPSES 2 l DATE: 6/ 9/97 COMPLETED BY: Bob Reible TELEPHONE: 817-897 0449 OPERATING STATUS l
- 1. REPORTING PERIOD: MAY 1997 GROSS HOURS IN REPORTING PERIOD: 744
- 2. ' CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3411 MAX. DEPEND. CAPACITY (HWe Net): 1150
- DESIGN ELECTRICAL RATING (HWe-Net): 1150 l
- 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (HWe Net): NONE
! 4. REASON FOR RESTRICTION (IF ANY):
THIS MONTH YR TO DATE CUMULATIVE
- 5. NUMBER OF HOURS REACTOR WAS CRITICAL 744 3,541 28.022 l
- 6. REACTOR RESERVE SHlRDOWN HOURS 0 82 2,311 )
- 7. HOURS GENERATOR ON LINE 744 3,520 27,754
- 8. UNIT RESERVE SHUTDOWN HOURS 0 0 0
- 9. GROSS THERMAL ENERGY GENERATED (MWH) 2,144.436 11.531,002 89,814.628
- 10. GROSS ELECTRICAL ENERGY GENERATED (HWH) 721,890 3.929.699 30.321.799
- 11. NET ELECTRICAL ENERGY GENERATED (MWH) 689,326 3.772.680 29,001.411 l
l 12. REACTOR SERVICE FACTOR 100.0 97.7 83.5
- 13. REACTOR AVAILABILITY FACTOR 100.0 100.0 90.4
- 14. UNIT SERVICE FACTOR 100.0 97.2 82.7
- 15. UNIT AVAILABILITY FACTOR 100.0 97.2 82.7
- 16. UNIT CAPACITY FACTOR (USING MDC) 80.6 90.5 75.2
- 17. UNIT CAPACITY FACTOR (USING DESIGN MWe) 80.6 90.5 75.2 l
- 18. UNIT FORCED OUTAGE RATE 0.0 0.0 6.6
, 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE. AND DURATION OF EACH):
! Third refueling outage (2RF03) scheduled to begin on October 25, 1997 with an estimated .
- duration of 35 days, l
- 20. IF SHUTDOWN AT END OF REPORTING PERIOD, ESTIMATED DATE OF STARTUP:
4 l 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): ACHIEVED !
! 1 l COMMERCIAL OPERATION : 930803 i
[ i i , - _ ,
Attathment to TXX 97131 Page 6 of 8 AVERAGE DAILY UNIT POWER LEVEL l
l
. DOCKET NO.: 50 446 I UNIT: CPSES 2 l DATE: 6/ 9/97 COMPLETED BY: Bob Reible TELEPHONE: 817 897 0449 i
MONTH: MAY 1997 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-Net) DAY (HWe-Net) 1 1124 17 1121 2 1123 18 1120 3 1122 19 1119 4 1122 20 1119 5 680 21 1119 i 6 464 22 1118 7 776 23 1027 8 1123 24 470 9 1124 25 469 10 1122 26 466 11 1121 27 460 12 1122 28 534 13 1122 29 932 14 1122 30 671 15 1121 31 471 16 1121 i
I
Attachment to TXX 97131 Page 7 of 8'
SUMMARY
OF OPERATING EXPERIENCE FOR THE H0 NTH
. .. DOCKET N0.: 50 446 UNIT: CPSES 2 DATE: 6/ 9/97 COMPLETED BY: Bob Reible TELEPHONE: 817 897-0449 HONTH: HAY 1997 DAY TIME REHARK/H0DE 05/01 0000 Unit began the month at 100% power.
05/05 0430 Began power reduction to 48% to repair cracked weld on 2B main feedwater pump casing vent valve 2FW 0011.
05/07 0812 Completed repairs to the valve 2FW-0011 and initiated power ramp up.
1644 Unit returned to 100* power.
05/23 1745 Started power reduction to repair main feedwater pump 2B outboard bearing resulted from high vibration.
2245 Maintained reactor power level at 50% to repair to the main feedwater pump 2B outboard bearing.
05/28 1640 Following completion of repairs to the outboard bearing, initiated power ramp up.
05/29 0024 Maintained power level at 86% due to high outboard bearing vibration to main feedwater pump 2B.
05/30 0700 Initiated action to ramp down power to 48% to troubleshoot and repair main feedwater pump 28 outboard bearing.
1210 Began troubleshooting and repair work to the main feedwater pump 2B outboard bearing.
05/31 2400 Unit ended the month at 48% power with the outboard bearing repairs in progress. ,
l
Attachment to TXX-97131 Page 8 of 8 .
UNIT SHUTDOWNS AND POWER REDUCTIONS -
DOCKET NO.: 50 446 UNIT: CPSES 2 , ,
DATE: 6/ 9/97 ,
COMPLETED BY: Bob Reible , j TELEPHONE: 817-897-0449 .
REPORT MONTH: MAY 1997 METHOD OF '
TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO DALE S: SCHEDULED (HOURS) REASON REDUCING POWER CORRECTIVE ACTIONS /COPMENTS 3 970505 F A 4 Began power reduction to 48% due to cracked weld on main feedwater pump 2B casing vent t valve 2FW-0011. (see previous page).
t 4 970523 F A 4 Initiated power reduction to 48% to .
troubleshoot and repair main feedwater pump 2B outboard bearing due to high vibration. (see r previous page).
- 1) REASON 2) METHOD A: EQUIPMENT FAILURE (EXPLAIN) E: OPERATOR TRAINING AND LICENSE EXAMINATION 1: MANUAL B: MAINT OR TEST F: ADMINISTRATIVE 2: MANUAL SCRAM ;
C: REFUELING G: OPERATIONAL ERROR (EXPLAIN) 3: AUTOMATIC SCRAM D: REGULATORY RESTRICTION H: OTHER (EXPLAIN) 4: OTHER (EXPLAIN) i i
i f
t
{
_ _ . _ _ . _ _ _ _ _ . _ _ _ _ _ . _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.___.__ _ ~ . , - . . .
_ _ _ - -. , - -- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ . _