Forwards Comanche Peak Response Team Results Repts Issue Specific Action Plans Ii.C, Train C Conduit & Supports, Ii.A, Reinforcing Steel in Reactor Cavity & Ii.D Seismic Design of Control Room Ceiling Elements
ML20236P526
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 11/09/1987
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20236P529 List:
References
TXX-6943, NUDOCS 8711180038
Download: ML20236P526 (4)


Text

- - - _ - _ . _ ,--- - -_

t-E Log #-TXX-6943 h 5

=

CPRT-1046

r. File # 10068 illELECTRIC

. winimn c. counsii November 9, 1987 Esecutive Vice Arsident V. S. Nuclear Regulatory Commission Attn: Document Control Desk' Washington, D. C. 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

L 00CKET'NOS. 50-445 AND'50-446 '

l CPRT RESULTS REPORTS Gentlemen:

We transmit herewith the following SRT approved Results Reports:

1.c Train.C Conduit and Su] ports II.a Reinforcing Steel in tie Reactor Cavity II.d Seismic Design of Control Room Ceiling Elements-These reports should be placed in sequence behind the tab." Civil / Structural" in the results reports binders previously transmitted. We are.also issuing a Volume V binder for Discipline Specific Action Plan (DSAP) Results Reports.

Volume IV binder is being reserved for Results Report Vll.c, " Construction Reinspection / Documentation Review Plan."

The files which contain supporting documentation for.these'Results Reports' have been reproduced in their entirety and are available for public-inspection in our Dallas office. Anyone wishing to inspect these files should contact Ms. Debra Anderson (214-812-4379).

We shall issue further Results Reports on a periodic basis as they are approved by the CPRT Senior Review Team.

Very truly yours,

/ .

Wi G. Counsil JCH/mgt Enclosures c - Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3) p C

Q11h0h A

$h 400 North Olive Street LB BI Dallas, Texas 75201 w

g 1

6 i

f- O

===-

" Log # TXX-6943 I

( -

_ d- ..CPRT-1046'

= = Fi1e #.10068

'nlELECTRIC 1 1

i wmiam c. counsa November 9, 1987 Esecutive %ce Presiderrt U. S. Nuclear Regulatory' Commission

  • Attn: Document Control Desk Washington, D. C. 20555-

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446

-CPRT RESULTS REPORTS Gentlemen:

We transmit herewith the following SRT approved Results Reports:

I.c Train C Conduit and Supports.  !

II.a Reinforcing Steel in the Reactor Cavity-  !

II.d Seismic Design of' Control Room Ceiling. Elements 1 These reports-should be placed in sequence behind the tab " Civil / Structural" A

in the results reports binders previously transmitte_d. We are also issuing a-Volume V' binder for' Discipline Specific Action Plan (DSAP) Results. Reports.

Volume IV binder is being reserved for Results Report VII.c, " Construction Reinspection / Documentation Review Plan."

l The files which contain supporting documentation for these Results Reports have been reproduced in their entirety and are available for public inspection in our Dallas office. Anyone wishing to inspect these files should contact Ms. Debra Anderson (214-812-4379).

We shall issue further Results Reports on'a neriodic' basis.as they are approved by the CPRT Senior Review Team.

1/[/7g /s C2 [ Very trul yours,

(. l l\ u v w/ v

~

U

(

i S -

4 l W. G. Counsil

' JCH/mgt Enclosures c - Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3)

A h.

400 North Olive Street LB 81 Dallas, Teras 73X1 L-_x___:_._______-. - - . _ _. . . _ - __ _ - _. - ___ - :. _ __ _ _ - _ _ -__ L

j , .1

-Noveaber 9, 1987-I g <

. TABLE OF CONTENTS-

f COLLECTIVE' SIGNIFICANCE REPORT

- Later - ,

COLLECTIVE EVALVATION' REPORTS ,

- Later -

i

'RESULTS REPORTS L Electrical I.a.1 Heat-Shrinkable-Cable Insulation Sleeves -

Revision 1 l

I.a.2 Inspection Reports.on-Butt-Splices, Revision l1/

'I.a.3 Butt-Splice Qualification - Revision 1 -l J

I.a.4 Agreement Between Drawings and Fie.ldLierminations

- Revision 2 I.a.5 NCR's on Vendor Installed Amp Terminal Lugs

- Revision 1

, I.b.1 Flexible Conduit to Flexible Conduit Separation 1

- Revision 1 I.b.2 Flexible Conduit to Cable Separation - Revision 1 1.b.3 Conduit to Cable Tray' Separation - Revision !

I b.4 Barrier Removal - Revision 1 Civil / Structural I .c- Train C. Conduit and Supports - Revision 1 II.a Reinforcing Steel in the Reactor Cavity -

Revision 1 ,

II.b Concrete Compression Strength.- Revision 1 II.c Maintenance of Air Gap-Between-Concrete Structures-

- Revision 1 II.d Seismic Design of Control Room-Ceiling Elements -

Revision 1 i

O(_j . II.e Rebar in the Fuel Handling Buildin~g - Revision 1 l

i

M ,

1 ,

Testing .

-( ) III'.a.1 Hot Functional Testing:- Revisionil.

III.a.2 -JTG Approval;of? Test' Data - Rev'ision 0-III.a.3 ' Technical Specification _for Def' erred' Tests Revision.0. '

y .III.a.4 Traceability'of'Te'st. Equipment '-Rev'isionD07 III.a.5 Preoperational. Test. Review andt ApprovalJoflResults,-

-Revision 1 '

III b Conduct of'the.CILRT -~ Revision-0 III.c  : Prerequisite-Testing,-.Revi~sion 1 1

III.d Preoperational Testing - Revision 1 Mechanical' V.a- Inspection for Certa'in Types.of Skewed Welds.in;NF'-

Supports - Revision 1 with ErrataL V.c Design Consideration for PipingfSystemsj8etween~

.G Seismic Category I and Non-Seismic Category.-I j

\s) Buildings - Revision 1 '

1 V.d Plug Welds - Revision 1 1

1 V.e Installation of Main Steam Pipes - Revision 1 i 1

VI.a Gap between Reactor Pressure Vessel Reflective Insulation and.the Biological Shield' Wall, Revision 1 a VI.b Polar Crane Shimming - Revision 1 j

-l L

O  ;

l 3

_ ; _ .._ _.:_L i __i-- -

y J 7 x o ' o g

]

, j h i I

. 4

.0A/QC .

I.d.2' Guidel.ines .for Admin'istrationcof ;QC Inspect'or ' Test-

- Revision :1-

' ~

, Craft Personnel' Train.ing; ~Revis: ion-1?

I.d.3 VII.a.1 Material Traceability iRevision 1. 1 VII.a.2 Nonconformance and Corrective-Action' System

~

Revision.1-VII.a.3 'DocumentfControl Revisionni 3 1

'VII.a.4!

Audit Program.andDAuditor10 qualification ~- 1

' Revision 1-l VII.a.5 P.eriodic Review of QA Program 'RevisionIl Villa.6' Exit Interviews ' Revision 1 i

~

~

E VII.a.7 Ho'usekeeping and Sys tem - C_l'eanline's's e lRevi s i onE l-l VII.a.8 Fuel Pool' Liner Documentation Revision l' 3

1 VII.b.1 Onsite Fabrication --Revision 1- jq l ( VII.b.2 Valve Disassemb.ly - Revision 1  ?

VII.b.4 Hilti A'nchor. Bolt Ins tallation '- Re' vision' 1- ,

DSAPs IX Piping and. Supports Discipline' Specific Action. Plan

- Revision 1 a 1