TXX-6943, Forwards Comanche Peak Response Team Results Repts Issue Specific Action Plans Ii.C, Train C Conduit & Supports, Ii.A, Reinforcing Steel in Reactor Cavity & Ii.D Seismic Design of Control Room Ceiling Elements

From kanterella
(Redirected from TXX-6943)
Jump to navigation Jump to search
Forwards Comanche Peak Response Team Results Repts Issue Specific Action Plans Ii.C, Train C Conduit & Supports, Ii.A, Reinforcing Steel in Reactor Cavity & Ii.D Seismic Design of Control Room Ceiling Elements
ML20236P526
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 11/09/1987
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20236P529 List:
References
TXX-6943, NUDOCS 8711180038
Download: ML20236P526 (4)


Text

-

t-E Log #-TXX-6943 h

5 CPRT-1046 r.

=

File # 10068 illELECTRIC winimn c. counsii November 9, 1987 Esecutive Vice Arsident V. S. Nuclear Regulatory Commission Attn: Document Control Desk' Washington, D. C.

20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

L 00CKET'NOS. 50-445 AND'50-446 l

CPRT RESULTS REPORTS Gentlemen:

We transmit herewith the following SRT approved Results Reports:

1.c Train.C Conduit and Su] ports II.a Reinforcing Steel in tie Reactor Cavity II.d Seismic Design of Control Room Ceiling Elements-These reports should be placed in sequence behind the tab." Civil / Structural" in the results reports binders previously transmitted.

We are.also issuing a Volume V binder for Discipline Specific Action Plan (DSAP) Results Reports.

Volume IV binder is being reserved for Results Report Vll.c, " Construction Reinspection / Documentation Review Plan."

The files which contain supporting documentation for.these'Results Reports' have been reproduced in their entirety and are available for public-inspection in our Dallas office.

Anyone wishing to inspect these files should contact Ms. Debra Anderson (214-812-4379).

We shall issue further Results Reports on a periodic basis as they are approved by the CPRT Senior Review Team.

Very truly yours,

/

Wi G. Counsil JCH/mgt Enclosures c - Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3) p Q11h0h $h C

A 400 North Olive Street LB BI Dallas, Texas 75201 w

g 1

6 O

I i

f-

===-

Log # TXX-6943

(

d-

..CPRT-1046'

=

=

Fi1e #.10068

'nlELECTRIC 1

1 i

wmiam c. counsa November 9, 1987 Esecutive %ce Presiderrt U. S. Nuclear Regulatory' Commission Attn: Document Control Desk Washington, D. C.

20555-

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446

-CPRT RESULTS REPORTS Gentlemen:

We transmit herewith the following SRT approved Results Reports:

I.c Train C Conduit and Supports.

II.a Reinforcing Steel in the Reactor Cavity-II.d Seismic Design of' Control Room Ceiling. Elements 1

These reports-should be placed in sequence behind the tab " Civil / Structural" A

in the results reports binders previously transmitte_d.

We are also issuing a-Volume V' binder for' Discipline Specific Action Plan (DSAP) Results. Reports.

Volume IV binder is being reserved for Results Report VII.c, " Construction Reinspection / Documentation Review Plan."

The files which contain supporting documentation for these Results Reports l

have been reproduced in their entirety and are available for public inspection in our Dallas office. Anyone wishing to inspect these files should contact Ms. Debra Anderson (214-812-4379).

We shall issue further Results Reports on'a neriodic' basis.as they are approved by the CPRT Senior Review Team.

1/[/7g /s C2 [

Very trul yours,

(.

l l\\ u v w/ v

~

U i

(

S W. G. Counsil 4

l l

JCH/mgt Enclosures c - Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3)

Ah.

400 North Olive Street LB 81 Dallas, Teras 73X1 L-x

_ -__ L

.1'.

j I

g

-Noveaber 9, 1987-TABLE OF CONTENTS-f COLLECTIVE' SIGNIFICANCE REPORT

- Later -

COLLECTIVE EVALVATION' REPORTS

- Later -

i

'RESULTS REPORTS L

Electrical I.a.1 Heat-Shrinkable-Cable Insulation Sleeves -

Revision 1 l

I.a.2 Inspection Reports.on-Butt-Splices, Revision l1/

'I.a.3 Butt-Splice Qualification - Revision 1

-l J

I.a.4 Agreement Between Drawings and Fie.ldLierminations

- Revision 2 I.a.5 NCR's on Vendor Installed Amp Terminal Lugs

- Revision 1 I.b.1 Flexible Conduit to Flexible Conduit Separation 1

- Revision 1 I.b.2 Flexible Conduit to Cable Separation - Revision 1 1.b.3 Conduit to Cable Tray' Separation - Revision !

I b.4 Barrier Removal - Revision 1 Civil / Structural I.c-Train C. Conduit and Supports - Revision 1 II.a Reinforcing Steel in the Reactor Cavity -

Revision 1 II.b Concrete Compression Strength.- Revision 1 II.c Maintenance of Air Gap-Between-Concrete Structures-

- Revision 1 II.d Seismic Design of Control Room-Ceiling Elements -

Revision 1 O(_j.

II.e Rebar in the Fuel Handling Buildin~g - Revision 1 i

l i

M 1

Testing.

-( )

III'.a.1 Hot Functional Testing:- Revisionil.

III.a.2

-JTG Approval;of? Test' Data - Rev'ision 0-III.a.3

' Technical Specification _for Def' erred' Tests Revision.0.

y

.III.a.4 Traceability'of'Te'st. Equipment

'-Rev'isionD07 III.a.5 Preoperational. Test. Review andt ApprovalJoflResults,-

-Revision 1 III b Conduct of'the.CILRT -~ Revision-0 III.c

Prerequisite-Testing,-.Revi~sion 1 1

III.d Preoperational Testing - Revision 1 Mechanical' V.a-Inspection for Certa'in Types.of Skewed Welds.in;NF'-

Supports - Revision 1 with ErrataL V.c Design Consideration for PipingfSystemsj8etween~

.G Seismic Category I and Non-Seismic Category.-I j

\\s)

Buildings - Revision 1 V.d Plug Welds - Revision 1 1

1 1

V.e Installation of Main Steam Pipes - Revision 1 i

1 VI.a Gap between Reactor Pressure Vessel Reflective Insulation and.the Biological Shield' Wall, Revision 1 a

VI.b Polar Crane Shimming - Revision 1 j

L

- l O

l 3

_ ; _.._ _.:_L i __i-- -

o g

]

y J 7 x

o '

j h

i I

4

.0A/QC I.d.2' Guidel.ines.for Admin'istrationcof ;QC Inspect'or ' Test-

- Revision :1-

' ~

I.d.3

, Craft Personnel' Train.ing; ~Revis: ion-1?

VII.a.1 Material Traceability iRevision 1.

1 VII.a.2 Nonconformance and Corrective-Action' System

~

Revision.1-VII.a.3

'DocumentfControl Revisionni 3

1

'VII.a.4!

Audit Program.andDAuditor10 qualification ~-

1

' Revision 1-l VII.a.5 P.eriodic Review of QA Program

'RevisionIl Villa.6' Exit Interviews

' Revision 1 i

VII.a.7

~

Ho'usekeeping and Sys tem - C_l'eanline's's e lRevi s i onE l-E

~

l VII.a.8 Fuel Pool' Liner Documentation Revision l' 3

1 VII.b.1 Onsite Fabrication --Revision 1-j q

l (

VII.b.2 Valve Disassemb.ly - Revision 1

?

VII.b.4 Hilti A'nchor. Bolt Ins tallation '- Re' ision' 1-v DSAPs IX Piping and. Supports Discipline' Specific Action. Plan

- Revision 1 a

1 g

i S

': fr i

\\~Jk 1

i l