TXX-6943, Forwards Comanche Peak Response Team Results Repts Issue Specific Action Plans Ii.C, Train C Conduit & Supports, Ii.A, Reinforcing Steel in Reactor Cavity & Ii.D Seismic Design of Control Room Ceiling Elements
| ML20236P526 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 11/09/1987 |
| From: | Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| Shared Package | |
| ML20236P529 | List: |
| References | |
| TXX-6943, NUDOCS 8711180038 | |
| Download: ML20236P526 (4) | |
Text
-
t-E Log #-TXX-6943 h
5 CPRT-1046 r.
=
File # 10068 illELECTRIC winimn c. counsii November 9, 1987 Esecutive Vice Arsident V. S. Nuclear Regulatory Commission Attn: Document Control Desk' Washington, D. C.
20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
L 00CKET'NOS. 50-445 AND'50-446 l
CPRT RESULTS REPORTS Gentlemen:
We transmit herewith the following SRT approved Results Reports:
1.c Train.C Conduit and Su] ports II.a Reinforcing Steel in tie Reactor Cavity II.d Seismic Design of Control Room Ceiling Elements-These reports should be placed in sequence behind the tab." Civil / Structural" in the results reports binders previously transmitted.
We are.also issuing a Volume V binder for Discipline Specific Action Plan (DSAP) Results Reports.
Volume IV binder is being reserved for Results Report Vll.c, " Construction Reinspection / Documentation Review Plan."
The files which contain supporting documentation for.these'Results Reports' have been reproduced in their entirety and are available for public-inspection in our Dallas office.
Anyone wishing to inspect these files should contact Ms. Debra Anderson (214-812-4379).
We shall issue further Results Reports on a periodic basis as they are approved by the CPRT Senior Review Team.
Very truly yours,
/
Wi G. Counsil JCH/mgt Enclosures c - Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3) p Q11h0h $h C
A 400 North Olive Street LB BI Dallas, Texas 75201 w
g 1
6 O
I i
f-
- ===-
Log # TXX-6943
- (
d-
..CPRT-1046'
=
=
Fi1e #.10068
'nlELECTRIC 1
1 i
wmiam c. counsa November 9, 1987 Esecutive %ce Presiderrt U. S. Nuclear Regulatory' Commission Attn: Document Control Desk Washington, D. C.
20555-
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446
-CPRT RESULTS REPORTS Gentlemen:
We transmit herewith the following SRT approved Results Reports:
I.c Train C Conduit and Supports.
II.a Reinforcing Steel in the Reactor Cavity-II.d Seismic Design of' Control Room Ceiling. Elements 1
These reports-should be placed in sequence behind the tab " Civil / Structural" A
in the results reports binders previously transmitte_d.
We are also issuing a-Volume V' binder for' Discipline Specific Action Plan (DSAP) Results. Reports.
Volume IV binder is being reserved for Results Report VII.c, " Construction Reinspection / Documentation Review Plan."
The files which contain supporting documentation for these Results Reports l
have been reproduced in their entirety and are available for public inspection in our Dallas office. Anyone wishing to inspect these files should contact Ms. Debra Anderson (214-812-4379).
We shall issue further Results Reports on'a neriodic' basis.as they are approved by the CPRT Senior Review Team.
1/[/7g /s C2 [
Very trul yours,
(.
l l\\ u v w/ v
~
U i
(
S W. G. Counsil 4
l l
JCH/mgt Enclosures c - Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3)
Ah.
400 North Olive Street LB 81 Dallas, Teras 73X1 L-x
_ -__ L
.1'.
j I
g
-Noveaber 9, 1987-TABLE OF CONTENTS-f COLLECTIVE' SIGNIFICANCE REPORT
- Later -
COLLECTIVE EVALVATION' REPORTS
- Later -
i
'RESULTS REPORTS L
Electrical I.a.1 Heat-Shrinkable-Cable Insulation Sleeves -
Revision 1 l
I.a.2 Inspection Reports.on-Butt-Splices, Revision l1/
'I.a.3 Butt-Splice Qualification - Revision 1
-l J
I.a.4 Agreement Between Drawings and Fie.ldLierminations
- Revision 2 I.a.5 NCR's on Vendor Installed Amp Terminal Lugs
- Revision 1 I.b.1 Flexible Conduit to Flexible Conduit Separation 1
- Revision 1 I.b.2 Flexible Conduit to Cable Separation - Revision 1 1.b.3 Conduit to Cable Tray' Separation - Revision !
I b.4 Barrier Removal - Revision 1 Civil / Structural I.c-Train C. Conduit and Supports - Revision 1 II.a Reinforcing Steel in the Reactor Cavity -
Revision 1 II.b Concrete Compression Strength.- Revision 1 II.c Maintenance of Air Gap-Between-Concrete Structures-
- Revision 1 II.d Seismic Design of Control Room-Ceiling Elements -
Revision 1 O(_j.
II.e Rebar in the Fuel Handling Buildin~g - Revision 1 i
l i
M 1
Testing.
-( )
III'.a.1 Hot Functional Testing:- Revisionil.
III.a.2
-JTG Approval;of? Test' Data - Rev'ision 0-III.a.3
' Technical Specification _for Def' erred' Tests Revision.0.
y
.III.a.4 Traceability'of'Te'st. Equipment
'-Rev'isionD07 III.a.5 Preoperational. Test. Review andt ApprovalJoflResults,-
-Revision 1 III b Conduct of'the.CILRT -~ Revision-0 III.c
- Prerequisite-Testing,-.Revi~sion 1 1
III.d Preoperational Testing - Revision 1 Mechanical' V.a-Inspection for Certa'in Types.of Skewed Welds.in;NF'-
Supports - Revision 1 with ErrataL V.c Design Consideration for PipingfSystemsj8etween~
.G Seismic Category I and Non-Seismic Category.-I j
\\s)
Buildings - Revision 1 V.d Plug Welds - Revision 1 1
1 1
V.e Installation of Main Steam Pipes - Revision 1 i
1 VI.a Gap between Reactor Pressure Vessel Reflective Insulation and.the Biological Shield' Wall, Revision 1 a
VI.b Polar Crane Shimming - Revision 1 j
L
- l O
l 3
_ ; _.._ _.:_L i __i-- -
o g
]
y J 7 x
o '
j h
i I
4
.0A/QC I.d.2' Guidel.ines.for Admin'istrationcof ;QC Inspect'or ' Test-
- Revision :1-
' ~
I.d.3
, Craft Personnel' Train.ing; ~Revis: ion-1?
VII.a.1 Material Traceability iRevision 1.
1 VII.a.2 Nonconformance and Corrective-Action' System
~
Revision.1-VII.a.3
'DocumentfControl Revisionni 3
1
'VII.a.4!
Audit Program.andDAuditor10 qualification ~-
1
' Revision 1-l VII.a.5 P.eriodic Review of QA Program
'RevisionIl Villa.6' Exit Interviews
' Revision 1 i
VII.a.7
~
Ho'usekeeping and Sys tem - C_l'eanline's's e lRevi s i onE l-E
~
l VII.a.8 Fuel Pool' Liner Documentation Revision l' 3
- 1 VII.b.1 Onsite Fabrication --Revision 1-j q
l (
VII.b.2 Valve Disassemb.ly - Revision 1
?
VII.b.4 Hilti A'nchor. Bolt Ins tallation '- Re' ision' 1-v DSAPs IX Piping and. Supports Discipline' Specific Action. Plan
- Revision 1 a
1 g
i S
': fr i
\\~Jk 1
i l