Letter Sequence Request |
---|
|
|
MONTHYEARML20141C8571986-01-31031 January 1986 Nonproprietary Analysis of Capsule V from Duke Power Co, McGuire Unit 2,Reactor Vessel Radiation Surveillance Program Project stage: Other ML20141C8451986-04-0202 April 1986 Forwards Nonproprietary WCAP-11029, Analysis of Capsule V from Duke Power Co,Mcguire Unit 2,Reactor Vessel Radiation Surveillance Program. Revised Capsule Removal Schedule Recommended Project stage: Other ML20210C0331986-09-0808 September 1986 Proposed Changes to Tech Specs,Incorporating Improvements Re RCS Pressure Temp Operating Limits Project stage: Request ML20210C0091986-09-0808 September 1986 Application for Amends to Licenses NPF-9 & NPF-17,changing Tech Specs to Incorporate Improvements Re Pressure Temp Operating Limits as Result of Exam of Capsules Withdrawn During First Refueling Outage.Fee Paid Project stage: Request ML20235W0921987-10-13013 October 1987 Requests That Portions of Util 860908 Application for Amends to Licenses NPF-9 & NPF-17 to Change Tech Specs Re RCS Pressure/Temp Limits Be Revised Due to Change Not Having Endorsement of Westinghouse Owners Group Project stage: Other ML20236B6131987-10-20020 October 1987 Responds to Requesting Rev to 860908 Proposal to Update Existing RCS pressure-temp Limits.Present Operating Limits Valid Until 1989.Proposed Tech Spec Rev Withdrawn. Appropriate Proposal Will Be Submitted at Later Date Project stage: Other 1986-09-08
[Table View] |
|
---|
Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARML20217F3431999-10-15015 October 1999 Application for Amends to Licenses NPF-9,NPF-17,NPF-35 & NPF-52,to Change TS Re Requirements for Insp of RCP flywheels.Marked-up & Reprinted Ts,Encl ML20216E6531999-09-13013 September 1999 Application for Amends to Licenses NPF-9 & NPF-17,revising TS Making Permanent One Time Only Changes Incorporated Into TS 3.7.9,allowing Up to 24 Hours to Restore Control Room Pressure Boundary to Operable Status.With marked-up TS ML20211G6631999-08-27027 August 1999 Application for Amend to License NPF-9,revising Tech Specs 3.1.4, Rod Group Alignment Limits ML20196H7471999-06-24024 June 1999 Application for Amends to Licenses NPF-9,NPF-17,NPF-35 & NPF-52,revising TS 2.0, Safety Limits, TS 3.3.1, Reactor Trip Sys Instrumentation & TS 3.4.1, RCS Pressure,Temp & Flow Departure from Nucleate Boiling (DNB) Limits ML20195F2871999-06-10010 June 1999 Application for Amends to Licenses NPF-9 & NPF-17, Facilitating one-time Addition of Condition G & Administrative Controls Note to TS 3.7.9, Cravs ML20206M9251999-05-0606 May 1999 Supplement to LARs & 1022,for Amends to Licenses NPF-9,NPF-17,NPF-52,respectively & NPF-62,revising List of Ref Documents Contained in TS 5.6.5b Re COLR Requirements ML20206B0691999-04-0606 April 1999 Application for Amends to Licenses NPF-9 & NPF-17,expanding Allowable Values for Interlocks P-6 (Intermediate Range Neutron Flux) & P-10 (Power Range Neutron Flux) in TS 3.3.1, Table 3.3.1-1,Function 16 ML20205L2091999-04-0505 April 1999 Application for Amends to Licenses NPF-9 & NPF-17,changing TS to Provide Revised SFP Storage Configurations,Revised SFP Storage Criteria & Revised Fuel Enrichment & Burnup Requirements.Analysis & Tss,Encl ML20237B6161998-08-14014 August 1998 Application for Amends to Licenses NPF-9,NPF-17,NPF-52 & NPF-52,revising TS Related to Ice Condenser Ice Bed ML20247E3831998-05-0808 May 1998 Application for Amends to Licenses NPF-9 & NPF-17,revising Power Range Neutron Flux High Trip Setpoints in Event of Inoperable MSSVs & Deleting References to 3-loop Operation in Current TS 3.7.1.1(b) & Table 3.7-2 ML20217N9181998-03-0303 March 1998 Application for Amends to Licenses NPF-9 & NPF-17,locating New Meteorological Tower to Be Installed at Plant ML20197G4261997-12-17017 December 1997 Application for Amends to Licenses NPF-9,NPF-17,NPF-35 & NPF-52,respectively,ref Updated or Recently Approved Methodologies Used to Calculate cycle-specific Limits Contained in COLR ML20217H5451997-10-13013 October 1997 Application for Amends to Licenses NPF-9 & NPF-17,requesting Replacement of Three Safety Related Narrow Range Refueling Water Storage Tank Level Instruments W/Three Safety Related Wide Range Level Instruments ML20212A2421997-10-0606 October 1997 Application for Amends to Licenses NPF-9 & NPF-17,deleting All References to Steam Line Low Pressure Safety Injection Function ML20148F4691997-05-27027 May 1997 Application for Amends to Licenses NPF-9 & NPF-17,converting Current TS to Be Consistent W/Improved Std Ts,Per NUREG-1431 ML20133D3901997-01-0606 January 1997 Application for Amends to Licenses NPF-9 & NPF-17,requesting Rev to Allow Operation of Containment Purge Ventilation Sys During Modes 3 & 4 During Startup from Steam Generator Replacement Outage ML20135B0191996-11-26026 November 1996 Application for Amends to Licenses NPF-9 & NPF-17,requesting Change to TS 3.8.2 Re DC Sources ML20134M1461996-11-0101 November 1996 Application for Amends to Exigent Licenses NPF-9 & NPF-17, Allowing Use of Low Specific Gravity Cells in Vital 125 Volt Dc Sys When Desired ML20129F7461996-10-22022 October 1996 Application for Amends to Licenses NPF-9 & NPF-17,requesting to Allow Continued Unit Operation at Elevated Containment Lower Compartment Temps for Period Not to Exceed 72 Cumulative Hours ML20113C7061996-06-21021 June 1996 Application for Amends to Licenses NPF-9,NPF-17,NPF-35, NPF-52,revising Term Lifting Loads Used in Manipulator Crane TS 3.9.6b.2 to Lifting Force. in Addition Redefining Auxiliary Hoist Min Capacities ML20100R4511996-03-0404 March 1996 Application for Amends to Licenses NPF-9 & NPF-17,deleting Flow Monitoring Sys from TS 3.4.6.1 & Associated SRs ML20100Q3111996-03-0404 March 1996 Application for Amends to Licenses NPF-9 & NPF-17,deleting Seismic Qualification Requirement for Containment Atmosphere Particulate Radiation Monitors ML20095E9261995-12-14014 December 1995 Application for Amends to Licenses NPF-9,NPF-17,NPF-35 & NPF-52,revising TS for DGs by Incorporating Guidance & Recommendations in NUREG-1366,GL 93-05,GL 94-01 & NUREG-1431 ML20095E8031995-12-12012 December 1995 Application for Amend to Licenses NPF-9 & NPF-17,making McGuire Afd Limit Equations Identical to Previously Approved by NRC for Catawba Nuclear Station ML20092K4381995-09-18018 September 1995 Application for Amends to Licenses NPF-9 & NPF-17,revising Table 2.2-1, Reactor Trip Sys Instrumentation Trip Setpoints ML20098A4461995-09-18018 September 1995 Supplemental Application for Amend to License NPF-35, Revising Table 2.2-1, Reactor Trip Sys Instrumentation Trip Setpoints ML20092B1371995-09-0101 September 1995 Application for Amends to Licenses NPF-9 & NPF-17,revising TS 3/4.6.5 to Reduce Require Ice Weight in Containment Ice Condenser of Each Unit from 2,099,790 Lbs to 1,516,800 Lbs ML20082M7921995-04-12012 April 1995 Application for Amends to Licenses NPF-35,NPF-52,NPF-9 & NPF-17,respectively to Relocate Requirements for Turbine Overspeed Protection Instrumentation from TS to Selected Licensee Commitment Manual ML20082B3871995-03-29029 March 1995 Application for Amends to Licenses NPF-9 & NPF-17 Re Heat Up & Cool Down Curves LTOP ML20078E4731995-01-18018 January 1995 Application for Amends to Licenses NPF-9,NPF-17,NPF-35 & NPF-52,respectively.Amends Relocate Requirements for Seismic Instrumentation,Meteorological Instrumentation & loose-part Detection Sys from TS to SLC Manual for Station ML20080F7901995-01-18018 January 1995 Application for Amends to Licenses NPF-9 & NPF-17 to TS Re Amends That Allow Analog Channel Operational Test Interval for Radiation Monitoring Instrumentation to Be Increased from Monthly to Quarterly ML20080C7371994-12-0707 December 1994 Application for Amends to Licenses NPF-9 & NPF-17,revising TS Table 3.3-6 Action Statment Re Control Room Air Intake at Times When Radiation Monitors (EMF-43A & 43B) Inoperable ML20076M6881994-11-0202 November 1994 Application for Amends to Licenses NPF-9,NPF-17,NPF-35 & NPF-52,deleting App B,Environ Protection Plan & Modifying Portion of License Condition 2.C.(2) So as to Delete Portion Which Refers to Environ Protection Plan ML20073L0711994-10-0404 October 1994 Application for Amends to Licenses NPF-9 & NPF-17,correcting Technical Deficiency Existing in TS Caused Difficulty to Plant Operations Re Number of Centrifugal Charging Pumps in Modes 4,5 & 6 ML20073J8981994-09-30030 September 1994 Application for Amends to Licenses NPF-9 & NPF-17,proposing Rev Related to Replacment of Steam Generators ML20073H2811994-09-28028 September 1994 Application for Amends to Licenses NPF-9 & NPF-17,updating Loss of Power Functional Unit of ESFAS Instrumentation TS Tables 3.3-3,3.3-4,3.3-5 & 4.3-2 ML20073E9071994-09-15015 September 1994 Application for Amends to Licenses NPF-9 & NPF-17,revising TS Bases 3/4.9.2, Refueling Operations;Instrumentation, Allowing Use of Newly Installed Wide Range Neutron Flux Monitors ML20072Q8171994-08-25025 August 1994 Application for Amends to Licenses NPF-9,NPF-17,NPF-35 & NPF-52,increasing AFW Pump & Sys Testing Interval from Monthly to Quarterly & Adopting Clarification Note from Revised STS for Westinghouse Plants,Per NUREG-1366 ML20070H5781994-07-18018 July 1994 Application for Amends to Licenses NPF-9,NPF-17,NPF-35 & NPF-52,separating TS Into Two (2) Vols for Each Station ML20070F3341994-07-13013 July 1994 Application for Amends to Licenses NPF-35,NPF-52,NPF-9 & NPF-17,revising TS 4.6.2d,by Increasing Surveillance Interval of Containment Spray Sys Header Air or Smoke Test from Five to Ten Years ML20069Q4021994-06-13013 June 1994 Application for Amends to Licenses NPF-9 & NPF-17,proposing Ts,By Increasing Initial Fuel Enrichment Limit from Current Maximum of 4.0 Weight % to 4.75 Weight % & Establish New Loading Patterns for New & Irradiated Fuel in SPF ML20069D1971994-05-24024 May 1994 Application for Amends to Licenses NPF-9,NPF-17,NPF-35 & NPF-52,proposing Changes to TS by Relocating Specific Boron Concentration Values to Core Operating Limits Rept ML20065B4241994-03-25025 March 1994 Application to Amend to Licenses NPF-9 & NPF-17,requesting Revision of TS 3/4.7.13 Re Description of Groundwater Monitors ML20064C9171994-02-25025 February 1994 Application for Amends to Licenses NPF-9 & NPF-17,adding Four Instruments to TS 3.3.3.6 Tables 3.3-10 & 4.3-7 as Part of Accident Monitoring Instrumentation (Ami) & Deleting Five Instruments from Subj Tables That Are Not Part of Ami ML20059G6911994-01-10010 January 1994 Application for Amends to Licenses NPF-9,NPF-17,NPF-35 & NPF-52,revising TS 4.2.5.3 to Change Method for Measuring RCS Flow Rate During 18-month Surveillance ML20058A5451993-11-11011 November 1993 Application for Amends to Licenses NPF-9 & NPF-17,proposing Changes by Revising Certain Surveillance Requirements for ECCS Subsystems ML20059H6811993-11-0404 November 1993 Application for Amends to Licenses NPF-9 & NPF-17,changing One Time Allowed Outage Time Extension for Train of Control Area Ventilation Sys in Order to Facilitate Maint on Sys Needed to Improve Sys Reliability ML20059C3841993-10-25025 October 1993 Application for Amends to Licenses NPF-9,NPF-17,NPF-35 & NPF-52,changing TS to Reduce Required Min Measured RCS Flow from 385,000 Gpm to 382,000 Gpm,Per Std B&W TS Presented in NUREG-1430 ML20046A0911993-07-13013 July 1993 Application for Amends to Licenses NPF-9 & NPF-17,revising Boron Concentration Limits within RWST & within Cold Leg Accumulators in Order to Support Safe Operation of Unit 2, Cycle 9 & Subsequent Cycles ML20045D9711993-06-23023 June 1993 Application for Amends to Licenses NPF-9 & NPF-17 Making One Time Change to Make Allowable Combined Leakage Rate in TS 3.6.1.2 from Current Value of 0.07 La to 0.104 La 1999-09-13
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20217F3431999-10-15015 October 1999 Application for Amends to Licenses NPF-9,NPF-17,NPF-35 & NPF-52,to Change TS Re Requirements for Insp of RCP flywheels.Marked-up & Reprinted Ts,Encl ML20216E6531999-09-13013 September 1999 Application for Amends to Licenses NPF-9 & NPF-17,revising TS Making Permanent One Time Only Changes Incorporated Into TS 3.7.9,allowing Up to 24 Hours to Restore Control Room Pressure Boundary to Operable Status.With marked-up TS ML20211G6631999-08-27027 August 1999 Application for Amend to License NPF-9,revising Tech Specs 3.1.4, Rod Group Alignment Limits ML20196H7471999-06-24024 June 1999 Application for Amends to Licenses NPF-9,NPF-17,NPF-35 & NPF-52,revising TS 2.0, Safety Limits, TS 3.3.1, Reactor Trip Sys Instrumentation & TS 3.4.1, RCS Pressure,Temp & Flow Departure from Nucleate Boiling (DNB) Limits ML20195F2871999-06-10010 June 1999 Application for Amends to Licenses NPF-9 & NPF-17, Facilitating one-time Addition of Condition G & Administrative Controls Note to TS 3.7.9, Cravs ML20206M9251999-05-0606 May 1999 Supplement to LARs & 1022,for Amends to Licenses NPF-9,NPF-17,NPF-52,respectively & NPF-62,revising List of Ref Documents Contained in TS 5.6.5b Re COLR Requirements ML20206B0691999-04-0606 April 1999 Application for Amends to Licenses NPF-9 & NPF-17,expanding Allowable Values for Interlocks P-6 (Intermediate Range Neutron Flux) & P-10 (Power Range Neutron Flux) in TS 3.3.1, Table 3.3.1-1,Function 16 ML20205L2091999-04-0505 April 1999 Application for Amends to Licenses NPF-9 & NPF-17,changing TS to Provide Revised SFP Storage Configurations,Revised SFP Storage Criteria & Revised Fuel Enrichment & Burnup Requirements.Analysis & Tss,Encl ML20237B6161998-08-14014 August 1998 Application for Amends to Licenses NPF-9,NPF-17,NPF-52 & NPF-52,revising TS Related to Ice Condenser Ice Bed ML20247E3831998-05-0808 May 1998 Application for Amends to Licenses NPF-9 & NPF-17,revising Power Range Neutron Flux High Trip Setpoints in Event of Inoperable MSSVs & Deleting References to 3-loop Operation in Current TS 3.7.1.1(b) & Table 3.7-2 ML20217N9181998-03-0303 March 1998 Application for Amends to Licenses NPF-9 & NPF-17,locating New Meteorological Tower to Be Installed at Plant ML20197G4261997-12-17017 December 1997 Application for Amends to Licenses NPF-9,NPF-17,NPF-35 & NPF-52,respectively,ref Updated or Recently Approved Methodologies Used to Calculate cycle-specific Limits Contained in COLR ML20217H5451997-10-13013 October 1997 Application for Amends to Licenses NPF-9 & NPF-17,requesting Replacement of Three Safety Related Narrow Range Refueling Water Storage Tank Level Instruments W/Three Safety Related Wide Range Level Instruments ML20212A2421997-10-0606 October 1997 Application for Amends to Licenses NPF-9 & NPF-17,deleting All References to Steam Line Low Pressure Safety Injection Function ML20148F4691997-05-27027 May 1997 Application for Amends to Licenses NPF-9 & NPF-17,converting Current TS to Be Consistent W/Improved Std Ts,Per NUREG-1431 ML20133D3901997-01-0606 January 1997 Application for Amends to Licenses NPF-9 & NPF-17,requesting Rev to Allow Operation of Containment Purge Ventilation Sys During Modes 3 & 4 During Startup from Steam Generator Replacement Outage ML20135B0191996-11-26026 November 1996 Application for Amends to Licenses NPF-9 & NPF-17,requesting Change to TS 3.8.2 Re DC Sources ML20134M1461996-11-0101 November 1996 Application for Amends to Exigent Licenses NPF-9 & NPF-17, Allowing Use of Low Specific Gravity Cells in Vital 125 Volt Dc Sys When Desired ML20129F7461996-10-22022 October 1996 Application for Amends to Licenses NPF-9 & NPF-17,requesting to Allow Continued Unit Operation at Elevated Containment Lower Compartment Temps for Period Not to Exceed 72 Cumulative Hours ML20113C7061996-06-21021 June 1996 Application for Amends to Licenses NPF-9,NPF-17,NPF-35, NPF-52,revising Term Lifting Loads Used in Manipulator Crane TS 3.9.6b.2 to Lifting Force. in Addition Redefining Auxiliary Hoist Min Capacities ML20100Q3111996-03-0404 March 1996 Application for Amends to Licenses NPF-9 & NPF-17,deleting Seismic Qualification Requirement for Containment Atmosphere Particulate Radiation Monitors ML20100R4511996-03-0404 March 1996 Application for Amends to Licenses NPF-9 & NPF-17,deleting Flow Monitoring Sys from TS 3.4.6.1 & Associated SRs ML20095E9261995-12-14014 December 1995 Application for Amends to Licenses NPF-9,NPF-17,NPF-35 & NPF-52,revising TS for DGs by Incorporating Guidance & Recommendations in NUREG-1366,GL 93-05,GL 94-01 & NUREG-1431 ML20095E8031995-12-12012 December 1995 Application for Amend to Licenses NPF-9 & NPF-17,making McGuire Afd Limit Equations Identical to Previously Approved by NRC for Catawba Nuclear Station ML20098A4461995-09-18018 September 1995 Supplemental Application for Amend to License NPF-35, Revising Table 2.2-1, Reactor Trip Sys Instrumentation Trip Setpoints ML20092K4381995-09-18018 September 1995 Application for Amends to Licenses NPF-9 & NPF-17,revising Table 2.2-1, Reactor Trip Sys Instrumentation Trip Setpoints ML20092B1371995-09-0101 September 1995 Application for Amends to Licenses NPF-9 & NPF-17,revising TS 3/4.6.5 to Reduce Require Ice Weight in Containment Ice Condenser of Each Unit from 2,099,790 Lbs to 1,516,800 Lbs ML20082M7921995-04-12012 April 1995 Application for Amends to Licenses NPF-35,NPF-52,NPF-9 & NPF-17,respectively to Relocate Requirements for Turbine Overspeed Protection Instrumentation from TS to Selected Licensee Commitment Manual ML20082B3871995-03-29029 March 1995 Application for Amends to Licenses NPF-9 & NPF-17 Re Heat Up & Cool Down Curves LTOP ML20078E4731995-01-18018 January 1995 Application for Amends to Licenses NPF-9,NPF-17,NPF-35 & NPF-52,respectively.Amends Relocate Requirements for Seismic Instrumentation,Meteorological Instrumentation & loose-part Detection Sys from TS to SLC Manual for Station ML20080F7901995-01-18018 January 1995 Application for Amends to Licenses NPF-9 & NPF-17 to TS Re Amends That Allow Analog Channel Operational Test Interval for Radiation Monitoring Instrumentation to Be Increased from Monthly to Quarterly ML20080C7371994-12-0707 December 1994 Application for Amends to Licenses NPF-9 & NPF-17,revising TS Table 3.3-6 Action Statment Re Control Room Air Intake at Times When Radiation Monitors (EMF-43A & 43B) Inoperable ML20076M6881994-11-0202 November 1994 Application for Amends to Licenses NPF-9,NPF-17,NPF-35 & NPF-52,deleting App B,Environ Protection Plan & Modifying Portion of License Condition 2.C.(2) So as to Delete Portion Which Refers to Environ Protection Plan ML20073L0711994-10-0404 October 1994 Application for Amends to Licenses NPF-9 & NPF-17,correcting Technical Deficiency Existing in TS Caused Difficulty to Plant Operations Re Number of Centrifugal Charging Pumps in Modes 4,5 & 6 ML20073J8981994-09-30030 September 1994 Application for Amends to Licenses NPF-9 & NPF-17,proposing Rev Related to Replacment of Steam Generators ML20073H2811994-09-28028 September 1994 Application for Amends to Licenses NPF-9 & NPF-17,updating Loss of Power Functional Unit of ESFAS Instrumentation TS Tables 3.3-3,3.3-4,3.3-5 & 4.3-2 ML20073E9071994-09-15015 September 1994 Application for Amends to Licenses NPF-9 & NPF-17,revising TS Bases 3/4.9.2, Refueling Operations;Instrumentation, Allowing Use of Newly Installed Wide Range Neutron Flux Monitors ML20072Q8171994-08-25025 August 1994 Application for Amends to Licenses NPF-9,NPF-17,NPF-35 & NPF-52,increasing AFW Pump & Sys Testing Interval from Monthly to Quarterly & Adopting Clarification Note from Revised STS for Westinghouse Plants,Per NUREG-1366 ML20070H5781994-07-18018 July 1994 Application for Amends to Licenses NPF-9,NPF-17,NPF-35 & NPF-52,separating TS Into Two (2) Vols for Each Station ML20070F3341994-07-13013 July 1994 Application for Amends to Licenses NPF-35,NPF-52,NPF-9 & NPF-17,revising TS 4.6.2d,by Increasing Surveillance Interval of Containment Spray Sys Header Air or Smoke Test from Five to Ten Years ML20069Q4021994-06-13013 June 1994 Application for Amends to Licenses NPF-9 & NPF-17,proposing Ts,By Increasing Initial Fuel Enrichment Limit from Current Maximum of 4.0 Weight % to 4.75 Weight % & Establish New Loading Patterns for New & Irradiated Fuel in SPF ML20069D1971994-05-24024 May 1994 Application for Amends to Licenses NPF-9,NPF-17,NPF-35 & NPF-52,proposing Changes to TS by Relocating Specific Boron Concentration Values to Core Operating Limits Rept ML20065B4241994-03-25025 March 1994 Application to Amend to Licenses NPF-9 & NPF-17,requesting Revision of TS 3/4.7.13 Re Description of Groundwater Monitors ML20064C9171994-02-25025 February 1994 Application for Amends to Licenses NPF-9 & NPF-17,adding Four Instruments to TS 3.3.3.6 Tables 3.3-10 & 4.3-7 as Part of Accident Monitoring Instrumentation (Ami) & Deleting Five Instruments from Subj Tables That Are Not Part of Ami ML20059G6911994-01-10010 January 1994 Application for Amends to Licenses NPF-9,NPF-17,NPF-35 & NPF-52,revising TS 4.2.5.3 to Change Method for Measuring RCS Flow Rate During 18-month Surveillance ML20058A5451993-11-11011 November 1993 Application for Amends to Licenses NPF-9 & NPF-17,proposing Changes by Revising Certain Surveillance Requirements for ECCS Subsystems ML20059H6811993-11-0404 November 1993 Application for Amends to Licenses NPF-9 & NPF-17,changing One Time Allowed Outage Time Extension for Train of Control Area Ventilation Sys in Order to Facilitate Maint on Sys Needed to Improve Sys Reliability ML20059C3841993-10-25025 October 1993 Application for Amends to Licenses NPF-9,NPF-17,NPF-35 & NPF-52,changing TS to Reduce Required Min Measured RCS Flow from 385,000 Gpm to 382,000 Gpm,Per Std B&W TS Presented in NUREG-1430 ML20057A0351993-08-26026 August 1993 Amends 138 & 120 to Licenses NPF-9 & NPF-17,respectively, Revising Boron Concentration Limits within Refueling Water Storage Tank ML20056F1021993-08-0909 August 1993 Corrected Amends 135 and 117 to Licenses NPF-9 & NPF-17, Respectively 1999-09-13
[Table view] |
Text
e DuxE POWER GOMPANY P.O. BOX 33189 CHARLOTTE. N.C. 98942 HAL B. TUCKER . mxmn m spasseenwr (704) 373-4531 wuct.sas . _ . -
September 8, 1986 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 ATTENTION: B.J. Youngblood, Director PWR Project Directorate #4 i
Subject:
McGuire Nuclear Station Docket Nos. 50-369 and 50-370 Proposed Technical Specification Amendment Reactor Coolant System Pressure-Temperature Limits Proposed Revision to Bases
Dear Mr. Denton:
Attached are proposed license amendments to Facility Operating Licenses NPF-9 and NPF-17 for McGuire Nuclear Station Units 1 and 2, respectively. The proposed changes to the McGuire Technical Specifications and the Bases of Technical Specifications seek to incorporate improvements identified as a result of NRC and industry efforts to improve technical specifications and to update the McGuire pressure-temperature operating limits as a result of examinations of capsules withdrawn during the first refueling outage of each McGuire unit.
The attachment to this letter is grouped into seven main sections:
Background Discussion Technical Bases for Revised Pressure-Temperature Limits Existing Technical Specification and Bases " Mark Up" Proposed Revision to Technical Specifications Proposed Revision to Bases of Technical Specifications McGuire FSAR Update Significant Hazards Consideration As the NRC is well aware, there has existed an intense effort since early 1985 by both NRC staff and industry to reevaluate the purpose of technical specifications.
-This effort reached a milestone in October 1985 when both the NRC Technical Specification Improvement Project and the Atomic Industrial Forum (AIF)
Subcommittee on Technical Specification Improvements issued reports on the results 8609180216 p
DR 860909 ADOCK 05000369 gM PDR ;
Mr. Harold R. Denton September 8, 1986 Page 2 of their respective efforts. Two areas of technical specifications that were identified in these reports were improving the bases of technical specifications and' removing specifications that are redundant to regulation. It is the intent of these proposed revisions to the McGuire Technical Specifications and to the Bases of Technical Specifications to address these two identified areas of improvement for the RCS pressure-temperature specification. This opportunity exists because reactor vessel surveillance capsules were withdrawn from each McGuire unit during refueling outages during the past two years and the limits are in need of revision as a result of the examination and analysis of these capsules.
Duke believes that the proposal contained herein, if approved, would demonstrate a positive commitment by the NRC towards improving the overall quality of technical specifications.
This request involves one application for amendment to McGuire's Technical Specifications. Accordingly, pursuant to 10 CFR 170.21 a check for $150.00 is enclosed.
Please feel free to contact us if you require any additional information.
Very truly yours, as '
Hal B. Tucker RLG/100/jgm Attachment xc: Dr. J. Nelson Grace Mr. Dayne Brown, Chief 1
Regional Administrator Radiation Protection Branch j U.S. Nuclear Regulatory Conan. Division of Facility Services ,
Region II Dept. of Human Resources ;
101 Marietta St., NW, Suite 2900 P.O. Box 12200 l Atlanta, Georgia 30323 Raleigh, North Carolina W.T. Orders Mr. Parl Hood, Project Manager NRC Resident Inspector Office of Nuc. Reactor Regulation McGuire Nuclear Station ~
~
- U.S. Nuc. Regulatory Cotanission Washington, D.C. 20555 i
Mr. Harold R. Denton September 8, 1986 Page 3 HAL B. TUCKER, being duly sworn, states that he is Vice President of Duke Power Company; that he is authorized on the part of said Company to sign and file with the Nuclear Regulatory Commission this revision to the McGuire Nuclear Station License Nos. NPF-9 and NPF-17 and that all statements and matters set forth therein are true and correct to the best of his knowledge, m
r /
d -
'Q Hal B. Tucker, Vice President Subscribed and sworn to before me this 8th day of September,1986.
> 0 "
m Notary Public My Connaission Expires:
r n7 lb do
/9b
/
4
, , - , - . , - - , , , - - , - - - - , - , _ _ - . . , ,.--,----,,,,,..---.----w,------.,----,yy--,. - - - - , ----r-----*-w_ -e - - - - , ---
er.- -- -*--
Mr. Harold R. Denton September 8, 1986 Page 4 bxc: P.M. Abraham K.S. Canady A.V. Carr
.R.C. Futrell C.L. Harlin C.L. Hartzell C.W. Hendrix T.L. McConnell E.O. McCraw W.D. Reckley G.E. Vaughn R.L. Jansen W T. TiptonTAIF)
B&W Owners Group T.S. Committee N. A. Rutherford J.G. Torre P.B. Nardoci R.W. Quellette R.O. Sharpe P.F. Guill V.M. Kapila S.A. Gewehr J.B. Day MC-801.01 MC-813.20 (35) l l
l 1
DUKE POWER COMPANY McGUIRE NUCLEAR STATION BACKGROUND DISCUSSION FOR PROPOSED TECHNICAL SPECIFICATION REVISION REACTOR COOLANT SYSTEM PRESSURE TEMPERATURE LIMITS 1
l i
t 9
(RLG14)
BACKGROUND -
Facility Operating Licenses issued by NRC include the following statement which requires that licensees comply with federal regulations as well as plant' technical specifications:
"This license shall be deemed to contain... and is subject to all applicable provisions of-the Act and to the rules, regulations... and is subject to the additional conditions specified or incorporated below.
(2) Technical Specification...."
Two specific regulations that licensees are required to comply with are:
10CFR50, Appendix G - Fracture Toughness Requirements 10CFR50, Appendix H - Reactor Vessel Material Surveillance Program Requirements
, Present technical specifications contain the requirement for reactor coolant systems to be operated within.specified pressure-temperature limits (3/4.4.9 4 Pressure / Temperature Limits).
- A review of the present McGuire technical specification yields
- 1) The LCO is redundant to 10CFR50, Appendix G and its analysis require-ments and is inconsistent with the surveillance.
- 2) The APPLICABILITY is inconsistent with the existing LCO, existing surveillance 4.4.9.1.1 and the Bases. The existing LCO states that the limits shall be met during "heatup, cooldown, criticality, and inservice
- leak and hydrostatic testing".
Specification 4.4.9.1.1 requires determination of temperature and i
pressure during system "heatup, cooldown, and inservice leak and hy-drostatic testing". No surveillance is identified for critical oper-ation. Furthermore, both of these lists of plant conditions differ from 4
the existing applicability which is "at all times".
- 3) Surveillance 4.4.9.1.2 is wholly redundant to 10CFR50,
' Appendix H.
- 4) The ACTION statement provides those operational related items that the NRC has found to be acceptable in the event it is determined that the
- regulation is not being complied with.
1
- 5) Surveillance 4.4.9.1.1 provides an NPC accepted method and frequency by
- which compliance with the specification is attained, but is inconsistent l with the LCO and applicability.
3 Three of these five items are redundant to federal regulations. The remaining two
, may be subject to administrative controls rather than be included as a part of the 4
operating license, particularly if they are maintained in a document that is
, enforceable. At a minimum, the inconsistencies within this specification should I
be corrected.
I It is the objective of this proposed technical specification revision to seek an
] alternate method by which these regulatory requirements can be addressed.
_ . . . . - ___ _ _-- _ .,_ _ _ _ _ _ _ _ _ _ 2 _ _ __ . __ _ _
DISCUSSION OF OPTIONS -
There are three options available when considering potential changes to Speci-fication 3/4.4.9:
- 1) Revise pressure-temperature curves only,
- 2) Revise as desired and relocate into administrative 1y controlled and maintained document, or
- 3) Revise as desired but retain in technical specifications.
The relative merits and impacts of each option are discussed in the following paragraphs.
3 OPTION 1 - Revise pressure-temperature curves only.
Industry and NRC Staff have been involved in a major initiative to improve tech-
, nical specifications. This issue has been the subject of intense review and study and several reports have been issued. Some of the concerns identified as gen-l .erically applicable to technical specifications are applicable to this specific one. These concerns include:
i
- 1) requirement being redundant to regulation
- 2) ambiguous requirements i
- 3) presentation is not user-friendly i
- 4) lack of one to one correlation between LCO, Action and surveillance
- 5) bases need to be improved.
I Given the concerns identified with technical specifications and the opportunity available to make meaningful improvements, doing nothing other than revising the
, pressure-temperature limits curves as a result of the recent capsule evaluations is not a desirable option. Duke does not elect to pursue this option at this time in that we prefer to see meaningful changes made to the entire specification.
OPTION 2 - Revise as desired and relocate into administratively controlled and maintained document l As noted in the discussion in response to Option 1, several concerns exist with 4
this specification which can be corrected. By relocating the as revised version
- 4 of the specification into a document administrative 1y maintained and controlled by the licensee, all concerns could be addressed. The document would be maintained l in much the same manner as a security plan or emergency plan except that changes i
would be evaluated pursuant to the criteria of 10CFR50.59. In this particular instance, the program is referenceable from the McGuire FSAR, Chapter 5. It is thus commensurate with a regulatory commitment and as such requirements are also j contained in 10CFR50, Appendix G and !!, are readily enforceable by the regulator.
j I
Discussion of Options Page 2 Regulation 10CFR50, Appendix H, Section IIc does contain a requirement that:
l "If a change in the Technical Specification is required, either in the !'
pressure-temperature limits or in the operating procedures required to meet the limits, the expected date for submittal of the revised Technical Speci-fications must be provided with the report.
In order to pursue Option 2, it appears that this regulatory requirement would need to be revised through rulemaking or an exemption request pursued.
Pursuit of Option 2 would reduce the administrative burden associated with main- l taining the specification up to date in the licensing process. NRC resources would be conserved in that only technical reviews of the capsule report would be required by NRC (as presently required by regulation). Industry resources would l be conserved in that efforts would be directed at preparation and submittal of '
capsule reports (as presently required by regulation) and by administrative 1y instituting whatever changes are necessary at the plant as a result of the capsule analysis.
These benefits are tempered by the fact that at most four and sometimes only three capsule reports are required during the plant operating lifetime. Duke does not elect this option at this time.
OPTION 3 - Revise as desired but retain in technical specifications The identified concerns with this specification could be revised via a license amendment application. The only concern identified that would not be addressed by this option is that the broad requirement itself is a requirement of a regulation and is thus redundant to regulation.
However, the technical specification action statement does identify those actions, found acceptable to NRC, that should be taken in the event the requirement is violated. In this option, these actions remain part of the operating license and would be subject to NRC review and public notification should a utility request a change. Each such proposed change would require a review pursuant to 10CFR50.91,.92 and a determination regarding significant hazards. Given the present criteria of 50.92 and the lack of bases for the present actions and surveillance, it is not clear how a reasonable significant hazards determination might be made if changes to the Action Statement are desired.
However, it is expected that the only areas expected to change over the life of the plant in this specification are the actual pressure-temperature limits and possibly the withdrawal schedule. And inasmuch as these areas are specifically required by regulations. it seems reasonable to pursue Option 3.
- . -. _ - - -=- - - . - _ . - - - .
DISCUSSION OF PROPOSED CHANGE -
In reviewing the three options, it appears that pursuit of Option 3 is the most viable at this time. This proposed change includes change to the following aspects of technical specification 3/4.4.9 Reactor Coolant System Pressure /-
Temperature Limits -
Limiting Condition-for Operation Applicability Action Statement Surveillance Requirements Bases l
Also included in this submittal package is a draft revision to the McGuire FSAR (1985 Update). It is Duke's intention to include this in the update to be sub-mitted in July 1986. '
Specification 3/4.4.9 contains requirements for reactor coolant system, pres-surizer, and overpressure protection system. The LCO's, surveillance, and Bases for these latter two elements are not being revised by this proposed change package.
4 Limiting Condition for Operation (3.4.9.1):
The LCO has been revised to read -
- "The Reactor Coolant System (except the pressurizer) pressure and temperature shall be maintained within the limits determined by analysis performed in j
accordance with the requirements of 10CFR50, Appendix G. The Reactor Coolant System (except the Pressurizer) heatup and cooldown rate shall not exceed 100 F/ hour."
It is noted that the above LOO is wholly redundant to the actual regulation.
However, it serves a purpose of establishing a tie between the regulation and the allowed operational flexibility provided by the Action statements. Without this
! LCO, an action statement could not exist in technical specifications to address deviation from this regulation.
Applicabilityt l
The applicability of this specification is being revised to accurately reflect the conditions when this specification is applicable. These conditions include situations where the reactor vessel itself is subject to stresses of a transient 1 nature. This includes the thermal stresses due to heatup and cooldown operations j j as well as the additional pressures stresses as a result of inservice leak and i hydrostatic test operations.
Action Statements s
The action statement remains the same as is presently in this specification with the addition of the words " pressure-temperature" as noted. This is to make the actions phraseology consistent with that of the LCO. An editorial change to the sequence of " pressure" and " temperature" in the second line is also being made.
n Discussion of Proposed Change
! Page 2 i
i Surveillance Requirements:
Surveillance 4.4.9.1.1 remains as written to reflect surveillance requirements during the transient conditions of heatups, cooldown, inservice leak, and hydro-
- static testing operations. Surveillance 4.4.9.1.2 has been relocated to the
- McGuire FSAR because it is wholly redundant to regulation and it does not have a
, complimentary LCD or Action Statement.
i A surveillance requirement of once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (which is consistent with existing practice) has been added.
. As discussed in the Background section of this document, licensees are required to comply with applicable federal regulations. 10CFR50, Appendix H is an applicable federal regulation. This specification is wholly redundant to the existing license requirement to comply with 10CFR50, Appendix H.
. The information contained in this surveillance has been relocated to the Bases and
- to the McGuire FSAR.
i
, Figures and tables that were referred to in sections removed have been relocated
{ as follows:
Technical Specification Figures 3.4-2a, 3.4-2b -
I These curves are the normal hestup and cooldown limitations for McGuire Unit 1.
As result of the analysis of Capsule U that was withdrawn during the first re-fueling outage, the curves have been revised. The capsule report is now refer-caced in the bases of this specification and included as an Appendix to McGuire FSAR Chapter 5.
Technical Specification Figures 3.4-3a, 3.4-3b -
i
! These curves are the normal heatup and cooldown limitations for McGuire Unit 2.
l As result of the analysis of Capsule V that was withdrawn during the first re-
! fueling outage, the curves have been revised. The capsule report is now refer-
, enced in the bases of this specification and included as an Appendix to McGuire FSAR Chapter 5.
Technical Specification Table 4.4 <
This table has been updated to reflect the information contained in the reference
- curveillance capsula reports and has been relocated to the FSAR Chapter 5.
Bases -
1 The Bases of Technical Specification 3/4.4.9 is in need of improvement. Much of
- the information contained therein is of little use to the intended user, the
- cperator. Some of the information is redundant to that presented in the McGuire i
i FSAR and surveillance capsule reports. The Bases does not provide the type of information reconsended by ANSI /ANS 58.4 - 1979. (It is noted that this standard is in the process of being updated.) The proposed rewrite of the Bases seeks to
! cddress the recossmendations of the standard to the extent that such information is l known. The Bases has been revised to reflect the as proposed technical speci- '
l fication previously discussed in this document. The proposed change to the Bases
! is not considered to be an amendment to the Facility Operating License.
i I
TECHNICAL BASES FOR REVISED PRESSURE-TEMPERATURE LIMITS (RLC100)
TEGNICAL BASIS FOR REVISED PRESSURE-TEMPERATURE LIMITS 4 The revised pressure-temperature limits are derived from the results of examinations by Westinghouse of reactor vessel surveillance capsules withdrawn ;
- from each McGuire unit. The results are documented in the capsule reports, referenced in the revised Bases and included in the FSAR update. The methodology used is consistent with accepted practice as described in the FSAR and Appendix A of the capsule reports.
1
! On McGuire Unit 1, the present' technical specification pressure-temperature limits cre valid to only 4.86 EFPY. (
Reference:
H.B. Tucker letter to H.R. Denton dated j April 5, 1985). There is a need to approve this proposed revision prior to the unit exceeding this value. Alternatively, McGuire could administratively
- implement the more conservative limits proposed herein. McGuire Unit 1 is at cyproximately 2.5 EFPY as of June 1986.
1 On McGuire Unit 2, the present technical specification pressure-temperature limits
- cre valid to 10 EFPY but the proposed limits which are essentially examined, and i results reported in sufficient time to revise the pressure-temperature limit j curves prior to exceeding 8 EFPY. McGuire Unit 2 is at slightly less than 2 EFPY cs of June 1986.
The revised Unit 2 Capsule withdrawal schedule reflects the fact that capsule V was inadvertently withdrawn during the first Unit 2 refueling oucase. The next i capsule scheduled to be withdrawn, X, will be evaluated in sufficient time to
- revise the pressure-temperature limit curves prior to 8 EFPY. The remainder of the withdrawal schedule is consistent with the recommendations of ASTM E185.