|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217K9681999-10-19019 October 1999 Ack Receipt of Transmitting Rev 40 to Physical Security Plan for Washington Nuclear Plant 2.Based on Determination That Changes Do Not Decrease Effectiveness of Plan,No NRC Approval Required ML17284A8981999-10-14014 October 1999 Forwards Rev 0 to WNP-2 Cycle 15,COLR 99-15, IAW Requirements of TS 5.6.5 ML17284A9061999-09-24024 September 1999 Forwards Final Rept for 990812 out-of-sequence Drills for Energy Northwest Washington Nuclear Power Project 2 (Lab, Food Control Point & Milk Sampling).No Deficiences & No Areas Requiring C/A Identified in Three Drills ML17284A8881999-09-24024 September 1999 Informs NRC of Change in Schedule Pertaining to Final Implementation of Reactor Stability long-term Solution for WNP-2 ML17292B7591999-09-24024 September 1999 Forwards Rev 24 to WNP-2 Emergency Plan,Iaw 10CFR50.4(b), 50.54(q) & 10CFR50 App E.Detailed Synopsis of Changes,Encl ML17292B7581999-09-22022 September 1999 Forwards NRC Forms 396 & 398 for Nl Hancock,License SOP-50027-3,AR Herrington,License OP-50013-3,WH Sawyer, License SOP-50023-3 & Dl Strote,License SOP-50031-3,for Renewal of Licenses.Without NRC Forms 396 & 398 ML17284A8811999-09-0909 September 1999 Forwards Response to NRC 990623 RAI to Support Review of Pending Request for Amend to Reactor pressure-temp Limit Curve TS GO2-99-168, Forwards Rev 40 to Physical Security Plan.Rev Withheld,Per 10CFR2.790(a)(3)1999-09-0808 September 1999 Forwards Rev 40 to Physical Security Plan.Rev Withheld,Per 10CFR2.790(a)(3) ML17284A8721999-08-30030 August 1999 Forwards Proprietary Info to Support Review of Request for Amend to License NPF-21,re Min Critical Power Ratio Safety Limits Tss,As Requested During 990816 Conversation. Proprietary Encl Withheld ML17284A8751999-08-30030 August 1999 Provides Correct Page from License NPF-21 Marked to Show Rev Addressed in 990729 Application for Amend,Which Included Page That Was Inadvertently Included as Attachment 4.Replace Attachment 4 with Attached Page & Disregard Attachment 5 ML17284A8711999-08-30030 August 1999 Informs Staff of Errors in world-wide-web Database Related to WNP-2 Reactor Vessel Structural integrity.Marked-up Pages Containing Errors or Omissions Will Be Forwarded by 991201 ML17292B7531999-08-24024 August 1999 Requests That Eleven Individuals Listed Below Take BWR Generic Fundamentals Examination to Be Administered on 991006 ML17292B7511999-08-24024 August 1999 Forwards Fitness for Duty (FFD) Semiannual Performance Data Rept for Jan-June 1999,per 10CFR26.71(d) ML17292B7501999-08-19019 August 1999 Informs Staff That Licensee Has Completed Review of NRC SER for B&Wog Util Resolution Guidance Document Addressing ECCS Suction Strainer Blockage ML17284A8701999-08-19019 August 1999 Forwards NRC Form 396, Certification of Medical Exam by Facility Licensee & NRC Form 398, Personal Qualification Statement - Licensee, for Jd Prescott (License SOP-50262-1).Without Encls ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML17284A8681999-08-12012 August 1999 Submits Two ISI Program Plan Relief Requests for NRC Review & Approval,Per 10CFR50.55a(a)(3)(i).Proposed Alternatives Provide Acceptable Level of Quality & Safety ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML17284A8541999-08-0202 August 1999 Forwards Proprietary Addl Info to Support Review of Pending Request for Amend to MCPR Safety Limit Ts.Info Consists of Proprietary Ltr from Abb Combustion Engineering,Inc.Encl Withheld ML17284A8531999-07-30030 July 1999 Forwards Estimate of Number of Licensing Action Requests Planned for Submittal in Future,As Requested in Administrative Ltr 99-02.Twenty-nine Submittals Scheduled for Fy 2000 & Four for Fy 2001 ML17284A8301999-07-22022 July 1999 Clarifies Change of Licensee Name from Wpps to Energy Northwest & Change of Facility Name from Wppss Nuclear Project Number 2 to WNP-2,as Requested in 990719 Telcon with Js Cushing of NRC.Marked-up OL Pages,Encl ML17292B7451999-07-20020 July 1999 Forwards Rev 23 to WNP-2 Emergency Plan,Iaw 10CFR50.4(b) & 50.54(q) & 10CFR50 App E.Rev 23 Provides Updated Description Re Establishment of Separate Emergency Operation Centers for Benton & Franklin Counties ML17292B7391999-07-16016 July 1999 Submits Withdrawal of Request for Amend to Secondary Containment & Standby Gas Treatment Sys Ts.Util Currently Plan to re-submit Amend Request in Entirety by 991112 ML17292B7381999-07-12012 July 1999 Forwards NRC Form 396 & NRC Form 398,for If Sumsion,License OP-50487 & Ga Westergard,License SOP-50415 for Renewal of Operator Licenses.Without Encls ML17292B7171999-07-0606 July 1999 Provides Notification of Early Completion on 990630 of Exception Noted in 990629 Ltr.Equipment within Scope of GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants, Evaluated & Y2K Ready ML17292B7181999-07-0202 July 1999 Responds to 990623 RAI to Support Review of Evaluation of Planar Indication Found on Weld Number 24RRC(2)A-1 During 1998 RO ML17292B7161999-06-30030 June 1999 Forwards Addl Info Requested in 990513 Ltr to Support Review of Pending Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Operated Gate Valves. ML17292B7131999-06-29029 June 1999 Forwards Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. ML17292B7091999-06-21021 June 1999 Forwards Proprietary Response to NRC 990603 RAI Re Licensee Request for Amend to MCPR Safety Limit Tss.Proprietary Info Withheld IAW Requirements of 10CFR2.790 ML17292B7041999-06-17017 June 1999 Forwards NRC Forms 396 & 398 for Three Individuals Listed Below for Renewal of Operator Licenses.Without Encls ML17292B7031999-06-10010 June 1999 Forwards Response to NRC 990511 RAI Re License Request for Amend to Secondary Containment & SGTS Tss.Results of Addl Benchmark of Gothic Computer Code Performed to Demonstrate Modeling Capability of Drawdown Response,Encl ML17292B6841999-06-0404 June 1999 Forwards Response to NRC 990326 RAI Re WNP-2 GL 96-05 Program for Periodic Verification of design-basis Capability of MOVs ML17292B6851999-06-0101 June 1999 Forwards 1999 Quality Audit of WNP-2 Emergency Preparedness Program, Per NUREG-0654,Section Ii,Criteria P.9.Seven Problem Evaluation Requests & Nine Recommendations for Improvement Were Issued as Result of Audit Activities ML17292B6831999-05-25025 May 1999 Informs That Request for NRC Approval of Changes to Emergency Plan Requesting Reduction in on-shift HP Staffing, Is Retracted.Util Will Resubmit Request with Required Addl Info at Later Date ML17292B6751999-05-25025 May 1999 Forwards Proprietary ABB-CE Ltr Re WNP-2 Cycle 15 SLMCPR & Core Reload Design Rept,Per Util Request for Amend Re MCPR Safety Limits.Proprietary Info Withheld,Per 10CFR2.790 ML20206U4501999-05-19019 May 1999 Ack Receipt of Which Transmitted Rev 39 to Physical Security Plan,Per 10CFR50.54(p).No NRC Approval Is Required,Since Changes Do Not Decrease Effectiveness of Security Plan ML17292B6661999-05-0707 May 1999 Requests Exemption to Requirement in 10CFR55.59(a)(2) Re Annual Operating Test requirements.One-time Exemption from Requirement to Period Not to Exceed 15-months from Last Date of Passing Operating Exam for Licensee at Facility ML20206S2911999-05-0505 May 1999 Informs That on 990420 Council Provided ten-day Comment Period on Council Order 731 Recommending Governor Approval of Amend of Site Certification Agreement for Satsop Power Plant Site ML17292B6531999-05-0303 May 1999 Forwards Response to NRC 990402 RAI Re Licensed Operator Positive Drug Test.Encl Withheld,Per 10CFR2.790 ML17292B6561999-04-29029 April 1999 Forwards Rev 0 to Calculation ME-02-98-04, Fracture Mechanics Evaluation of N1 Safe End & Calculation Mod Record CMR-98-0243, Fracture Mechanics Evaluation of N1A Nozzle Safe End, as Suppl Info to ISI Exam ML17292B6421999-04-19019 April 1999 Responds to NRC 990319 Ltr Re Violations Noted in Insp Rept 50-397/99-01.Corrective Actions:Provisions Are Presently in Place to Maintain Adequate Level of Security GO2-99-073, Forwards Rev 39 to WNP-2 Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Approved Plan.Encl Withheld IAW 10CFR73.21 & 10CFR2.7901999-04-19019 April 1999 Forwards Rev 39 to WNP-2 Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Approved Plan.Encl Withheld IAW 10CFR73.21 & 10CFR2.790 ML17292B6401999-04-13013 April 1999 Requests That WNP-2 Operator Requalification Program Be Granted one-time Extension Beyond Requirement in 10CFR55.59(a)(2) for Annual Operating Tests ML17292B6371999-04-12012 April 1999 Forwards Response to NRC 990211 RAI Re Util Request for Amend to Secondary Containment & SBGTS TS ML17292B6281999-04-0606 April 1999 Informs NRC That Insp Interval Ending Date for ISI Program Plan Has Been Extended by One Year to Dec 12,2005 Due to Changes in Plant Refueling Outage Schedule ML20196K6961999-03-30030 March 1999 Ack Receipt of ,Transmitting Rev 38 to Physical Security Plan for Plant.No NRC Approval Is Required,In Accordance with 10CFR50.54(p) GO2-99-060, Submits Rept of Status of WNP-2 Decommissioning Fund as of 981231,IAW 10CFR50.75(f)(1)1999-03-26026 March 1999 Submits Rept of Status of WNP-2 Decommissioning Fund as of 981231,IAW 10CFR50.75(f)(1) ML17292B6131999-03-24024 March 1999 Forwards Rev 0 to Calculation ME-02-98-04, Fracture Mechanics Evaluation of N1 Nozzle Safe End. Info Will Be Used to Assist NRC in Review of WNP-2 ISI Activities Associated with Evaluation of Planar Indication ML20204F0261999-03-19019 March 1999 Forwards Insp Rept 50-397/99-01 on 990201-04 & 0303-05.No Violations Noted.Areas of Physical Security Plan Effectively Implemented with Listed Exceptions ML17292B6001999-03-16016 March 1999 Responds to Weakness Noted in Insp Rept 50-397/98-24. Corrective Actions:Developed Document to Identify Areas Needing Improvement,Assigned Responsibility for Actions & Provided Milestones for Achievement 1999-09-09
[Table view] Category:NRC TO LEGAL/LAW FIRM
MONTHYEARML20059M0921990-09-27027 September 1990 Advises That Name Will Be Removed from Mailing List Unless Notification of Wish to Remain on List to Continue to Receive Info Re Facility Received within 30 Days IA-84-645, Final Response to FOIA Request for Records Re Various Aspects of Plants.All Agency Records Available in PDR W/ Exception of Documents Subj to Withholding (Ref FOIA Exemptions 3,4,5 & 7)1987-04-10010 April 1987 Final Response to FOIA Request for Records Re Various Aspects of Plants.All Agency Records Available in PDR W/ Exception of Documents Subj to Withholding (Ref FOIA Exemptions 3,4,5 & 7) ML20206F7291987-04-10010 April 1987 Final Response to FOIA Request for Records Re Various Aspects of Plants.All Agency Records Available in PDR W/ Exception of Documents Subj to Withholding (Ref FOIA Exemptions 3,4,5 & 7) IA-84-617, Final Response to FOIA Request for Documents Re Securities Litigation of Wppss Facilities.Search Discovered Over 500,000 Documents Available in Pdr.Some Documents Withheld (Ref FOIA Exemptions 3,4,5 & 7)1987-04-10010 April 1987 Final Response to FOIA Request for Documents Re Securities Litigation of Wppss Facilities.Search Discovered Over 500,000 Documents Available in Pdr.Some Documents Withheld (Ref FOIA Exemptions 3,4,5 & 7) ML20206H6021987-04-10010 April 1987 Final Response to FOIA Request for Documents Re Securities Litigation of WPPSS Facilities.Search Discovered Over 500,000 Documents Available in Pdr.Some Documents Withheld (Ref FOIA Exemptions 3,4,5 & 7) ML20206G9261987-04-10010 April 1987 Final Response to FOIA Request for Records Re Various Plant Aspects.Documents Subj to Request Either Available in PDR or Withheld (Ref FOIA Exemptions 3,4,5 & 7) IA-84-603, Final Response to FOIA Request for Documents Re Securities Litigation of Wppss Facilities.Search Discovered Over 500,000 Documents Available in Pdr.Some Documents Withheld (Ref FOIA Exemptions 3,4,5 & 7)1987-04-10010 April 1987 Final Response to FOIA Request for Documents Re Securities Litigation of Wppss Facilities.Search Discovered Over 500,000 Documents Available in Pdr.Some Documents Withheld (Ref FOIA Exemptions 3,4,5 & 7) ML20206G7351987-04-10010 April 1987 Final Response to FOIA Request for Documents Re Securities Litigation of WPPSS Facilities.Search Discovered Over 500,000 Documents Available in Pdr.Some Documents Withheld (Ref FOIA Exemptions 3,4,5 & 7) IA-84-643, Final Response to FOIA Request for Documents Re Wppss Nuclear Projects 1-5.Documents Available in PDR Except Those Subj to Withholding (Ref FOIA Exemptions 3,4,5 & 7)1987-04-10010 April 1987 Final Response to FOIA Request for Documents Re Wppss Nuclear Projects 1-5.Documents Available in PDR Except Those Subj to Withholding (Ref FOIA Exemptions 3,4,5 & 7) ML20206G6951987-04-10010 April 1987 Final Response to FOIA Request for Documents Re WPPSS Nuclear Projects 1-5.Documents Available in PDR Except Those Subj to Withholding (Ref FOIA Exemptions 3,4,5 & 7) ML20212H6601987-01-20020 January 1987 Final Response to FOIA Request.App F Documents Re Marviken II Project Encl & Available in PDR ML20215L5161986-10-23023 October 1986 Partial Response to FOIA Request.App a Documents Re NUREG-1022 Available in Pdr.App B Document Re Exemption to 10CFR50 Reporting Requirements for LERs Encl & Being Placed in PDR ML20210S4131986-09-26026 September 1986 Further Response to FOIA Request for 16 Categories of Records Re Facilities.Forwards App D & E Documents.Documents Also Available in PDR ML20126F0281985-03-0404 March 1985 Responds to FOIA Request for Records Re Facility.Ofc of General Counsel in Process of Formalizing Generic Response for Various Related FOIA Requests.Records Already Available in PDR for Insp ML20062F8591978-12-0101 December 1978 Forwards Memo Re Procedures for NRC Staff Meetings W/ Petitioners & Intervenors CLI-77-24, Ack & States That the 3 Requested Decisions, CLI-77-24,ALAB-473,& ALAB-489 Were Forwarded on 7811071978-11-13013 November 1978 Ack & States That the 3 Requested Decisions, CLI-77-24,ALAB-473,& ALAB-489 Were Forwarded on 781107 1990-09-27
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217K9681999-10-19019 October 1999 Ack Receipt of Transmitting Rev 40 to Physical Security Plan for Washington Nuclear Plant 2.Based on Determination That Changes Do Not Decrease Effectiveness of Plan,No NRC Approval Required ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20206U4501999-05-19019 May 1999 Ack Receipt of Which Transmitted Rev 39 to Physical Security Plan,Per 10CFR50.54(p).No NRC Approval Is Required,Since Changes Do Not Decrease Effectiveness of Security Plan ML20196K6961999-03-30030 March 1999 Ack Receipt of ,Transmitting Rev 38 to Physical Security Plan for Plant.No NRC Approval Is Required,In Accordance with 10CFR50.54(p) ML20204F0261999-03-19019 March 1999 Forwards Insp Rept 50-397/99-01 on 990201-04 & 0303-05.No Violations Noted.Areas of Physical Security Plan Effectively Implemented with Listed Exceptions ML20203B9001999-02-0808 February 1999 First Partial Response to FOIA Request for Documents. Forwards Documents Listed in App a Already Available in PDR, Documents in App B Released in Entirety & Documents in App C Being Withheld in Part (Ref Exemption 6) ML20202C7671999-01-22022 January 1999 Forwards Order Terminating Construction Permit CPPR-154 for WNP-3/5 Site.Safety Evaluation Associated with Action Also Encl ML20198Q7131999-01-0404 January 1999 Forwards EA & Fonsi Re 960808 Application.Assessment Being Forwarded to Ofc of Fr for Publication IR 05000397/19982011998-12-0909 December 1998 Forwards Insp Rept 50-397/98-201 (Operational Safeguards Response Evaluation) on 980921-24.Insp Rept Contains Safeguards Info Per 10CFR73.21.Without Encl.No Violations Noted ML20155G7791998-11-0202 November 1998 Forwards Insp Rept 50-508/98-201 on 981027-28.No Violations Noted.Insp Included Review of Activities to Terminate Construction Permit CPPR-154 ML20154H7131998-10-13013 October 1998 Responds to 980911 Request for Reconsideration of Severity Level III NOV Issued on 980220 to WNP-2 for Violations of TS & 10CFR50.59.NRC Withdrawing Four Violations Grouped Into Severity Level III & Issuing Single Several Level Iv,Encl ML20236W5271998-07-31031 July 1998 Confirms Telcon That Involved Representatives from NRR, Region IV & WPPSS Staff Re Operational Safeguards Response Evaluation Scheduled for 980921-24 at WPPSS Nuclear Project 2 Facility ML20236L8861998-07-0606 July 1998 Ltr Contract:Task Order 14, WNP2 Safety Sys Engineering Insp, Under Contract NRC-03-98-021 ML20236H8751998-07-0101 July 1998 Ltr Contract:Task Order 13, WNP2 Corrective Action Team Insp Under Contract NRC-03-98-021 ML20249C8141998-06-26026 June 1998 Ack Receipt of from P Bemis & Discussions Between E Merschoff & V Parrish on 980622 Re Briefing by Supply Sys on Licensee C/As Re Fire Header Line Break Event on 980617.Arrangements for Meeting to Be Discussed W/Staff ML20236J9871998-06-24024 June 1998 First Final Response to FOIA Request for Documents.Documents Listed in App a Already Available in Pdr.Documents Listed in App B Being Released in Entirety IR 05000397/19980021998-04-24024 April 1998 Forwards Insp Rept 50-397/98-02 on 980406-09.No Violations Noted.Areas Examined Included Portions of Physical Security Program ML20217B8881998-04-20020 April 1998 Ack Receipt of Ltr Which Transmitted Changes to Physical Security Plan & Informs That No NRC Approval Required ML20217B7961998-04-20020 April 1998 Ack Receipt of ,Which Transmitted Rev 37 to Plant Physical Security Plan.Changes Do Not Decrease Effectiveness of Security Plan,Iaw 10CFR50.54(p) ML20199A3681998-01-21021 January 1998 Forwards ERDS Implementaion Documents,Including Data Point Library 246 for Hatch,246 for McGuire & 247 for WNP2.Changes Should Be Made as Soon as Possible.W/O Encl ML20198J5131998-01-0707 January 1998 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-397/97-07.Actions Will Be Reviewed During Future Insp to Determine That Full Compliance Has Been Achieved & Will Be Maintained ML20197B2211997-12-19019 December 1997 Ack Receipt of Ltr Dtd 970509,transmitting Rev 35 to Physical Security Plan for Plant ML20199E3011997-11-18018 November 1997 Forwards Insp Rept 50-397/97-07 on 971020-26 & NOV Re Gap in Vehicle Barrier Sys That Provided Pathway for Design Basis Vehicle to Gain Unauthorized Proximity to Vital Areas ML20140G6341997-05-0707 May 1997 Forwards ERDS Implementation Documents Including Data Point Library Updates for McGuire Number 224,WNP2 Number 225, Beaver Valley Number 226 & Calvert Cliffs Number 227. W/O Encl ML20138K0541997-05-0707 May 1997 Forwards ERDS Implementation Documents & Data Point Library for Listed Plants.W/O Encl ML20137H0891997-03-27027 March 1997 Ack Receipt of Which Transmitted Change 34 to Physical Security Plan for Washington Nuclear Plant-2,per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Plan. W/O Encl Per 10CFR73.21 ML20136G5561997-03-14014 March 1997 Ack Receipt of & Wire Transfer of Payment for Civil Penalty Imposed by NRC in ML20136B7931997-03-0606 March 1997 Forwards Insp Rept 50-397/97-02 on 970127-31 & 0212-14. Inspector Determined That Physical Security Program Was Effectively Implemented ML20135E5161997-03-0404 March 1997 Ack Receipt of Transmitting Changes to Physical Security Plan for Washington Nuclear Plant 2,rev 33.Based on Determination That Changes Do Not Decrease Effectiveness of Security,No NRC Approval Required ML20134L3261997-02-14014 February 1997 Discusses in Response to 961126 NOV & Proposed Imposition of Civil Penalty & Forwards Order Imposing Civil Monetary Penalty - $100,000 ML20134H1521997-02-0707 February 1997 Fourth Partial Response to FOIA Request for Documents. Forwards Documents Identified in App G & H Being Made Available in PDR ML20132E3431996-12-19019 December 1996 Fowards Emergency Response Data System Implementation Documents.W/O Encl ML20133C8941996-12-16016 December 1996 Forwards Insp Rept 50-397/96-23 on 961118-22.No Violations Noted ML20132F1521996-12-13013 December 1996 Ack Receipt of Which Transmitted Changes to Physical Security Plan,Rev 32.No NRC Approval Required for Implementation of Changes,But Changes Will Be Subj to Insp ML20149G2011994-09-0101 September 1994 Ltr Contract,Mod 4 to Task Order 22,extending Period of Performance at No Addl Cost,To IPE Reviews,Internal Events - Human Reliability Analysis Only (Washington Nuclear 2) ML20059L5031994-01-28028 January 1994 Extends Invitation to Participate in Workshop Re Emergency Preparedness & Incident Response on 940222 in Arlington,Tx IR 05000397/19930481993-12-15015 December 1993 Forwards Insp Rept 50-397/93-48 on 931116-23 & Nov.Violation of Concern Because It Appears to Be Repeat of Previous Problems.Encls Withheld (Ref 10CFR2.790) ML20058F9681993-11-16016 November 1993 Forwards Safeguards Info Ref in SECY-93-270 Re Proposed Amend to 10CFR73 to Modify Design Basis Threat for Radiological Sabotage to Include Use of Land Vehicle by Adversaries.Safeguards Info Withheld IR 05000397/19930341993-11-0202 November 1993 Forwards Insp Rept 50-397/93-34 on 930929-1006.No Violations Noted.Encl Withheld (Ref 10CFR2.790) ML20059B2651993-10-25025 October 1993 Forwards SER & TER Re Topical Rept WPPSS-FTS-129 BWR Transient Analysis Model. Topical Rept & Supporting Submittals Acceptable IR 05000397/19930201993-10-15015 October 1993 Discusses Insp Rept 50-397/93-20 on 930402-0517 & Forwards Notice of Violation.Violation of Concern Because of Apparent Misconduct of Personnel Involved W/Falsification of Plant Records ML20059J0731993-09-29029 September 1993 Ltr Contract,Definitizing Task Order 14, Emergency Operating Procedures - WNP2 ML20059D6691993-09-24024 September 1993 Ltr Contract,Awarding Task Order 22, Individual Plant Exam (IPE) Reviews,Internal Events - Human Reliability Analysis Only (Washington Nuclear 2) ML20059C6641993-09-23023 September 1993 Ltr Contract,Awarding Task Order 22, Individual Plant Exam (IPE) Reviews,Internal Events,Back End Only (Washington Nuclear 2) ML20059D6901993-09-23023 September 1993 Ltr Contract Awarding Task Order 21,to IPE Reviews,Internal Events - Front End Only (Washington Nuclear 2), to NRC-04-91-066 ML20057C6621993-08-27027 August 1993 Forwards Insp Rept 50-397/93-28 on 930809-13.No Violations Noted ML20126J8601992-12-30030 December 1992 Advises That Rev 12 to Facility Number 2 Contingency Plan Is Consistent W/Provisions of 10CFR50.54(p) & Acceptable ML20126J8851992-12-30030 December 1992 Advises That 920805 Rev 23 to Facility Physical Security Plan Is Consistent W/Provisions of 10CFR50.54(p) & Acceptable ML20127F0591992-12-30030 December 1992 Forwards Insp Rept 50-397/92-34 on 921207-11.No Violations Noted 1999-08-03
[Table view] |
Text
._ _ _
- ? 'o
[" , g NUCLEAR REGULATORY COMMISSION I
-E WASHINGTON, D. C. 20555 5
k . . . . ,o @
Bruce Cohen Meredith & Cohen 22nd Floor-Architects Building 17th & Sansom Streets Apg 10 SET IN RESPONSE REFER Philadelphia, Pennsylvania 19103 TO F01A-84-603
Dear Mr. Cohen:
This is in final response to your request under the Freedom of Information Act (FOIA), 5 U.S.C. 552 et _ seq _., for agency records which relate to various aspects of the Washington 7ublic Power Supply System (WPPSS) Nuclear Projects 1 through 5. Several aspects of some of these projects are currently the subject of litigation styled In Re Washington Public Power Supply System Securities Litigation (MDL No. 551, W.D. Wa.).
In response to your F0IA request for agency records and several similar F0IA requests and in light of the possibility of third-party discovery of those documents in connection with the above-identified litigation, the Nuclear Regulatory Commission (NRC) has recently completed an agency-wide search of its files for all cocuments related to the WPPSS Nuclear Projects 1 through
- 5. Except for documents subject to withholding under F0IA Exemption 4 (proprietary information), Exemption 3 (restricted data), and Exemption 7 (current investigatory matters) Exemption 5 (current litigation matters only) and selected formal adjudicatory records already publicly available, all agency records identified as a result of the above search (estimated to exceed 500,000 pages of documents) have been placed in the NRC Public Document Room located at 1717 H Street, N.W., Washington, D.C. 20555.
Moreover, in conjunction with activities by the United States Department of Justice, copies of these documents in a form usable in the litigation identified above have been made, and are maintained by the Portland Field Office, Civil Division, U.S. Department of Justice, 500 N.E. Multncmah Street, Suite 829, Portland, Oregon 97232,(503)230-3102.
If you filed your F0IA request as a direct or indirect representative of a party in the litigation identified above, copies of the publicly available NRC documents pertaining to the relevant WPPSS projects may be obtained by contacting the Portland field office of the Department of Justice directly.
In addition, parties will be able to obtain through the Portland field office and under protective agreement, copies of proprietary documents withheld from the general public under Exemption 4 of the F0IA. ;
If you did not file your F0IA request as a direct or indirect representative of a party to the litigation identified above, you may obtain access to the publicly available documents pertaining to the relevant WPPSS projects through the NRC Public Document Room at the location identified above.
However, certain documents responsive to your request have been identified as containing (1) restricted data (2) confidential comercial information, (3) information pertaining to current investigative matters, and (4) infonnation revealing litigative strategy of current agency interest. These records are being withheld from public disclosure pursuant to Exemptions 3, 4, 5 and 7 of the F0IA, 5 U.S.C. 552(b)(3), (4), (5) and (7), and 10 CFR 9.5(a)(4), (5) and (7) of the Commission's regulations.
8704150122 870410 PDR FOIA COHEN 84-603 PDR
.f .. .
Mr. Bruce Cohen Pursuant to 10 CFR 9.15 of the Commission's regulations, it has been determined that the information withheld is exempt from production or disclosure and that its production or disclosure is contrary to the public interest. The person responsible for the denial of these records is Mr. C. Sebastian Aloot, Office of the General Counsel.
This denial may be appealed to the Secretary of the Commission within 30 days from the receipt of this letter. Any such appeal must be in writing, addressed to the Secretary of the Commission, U.S. Nuclear Regulatory Commission, Washington, DC 20555, and should clearly state on the envelope and in the letter that it is an " Appeal from an Initial F0IA Decision."
Sincerely,
/kede. // w d)
Donnie H. Grimsley, Director Division of Rules & Records Office of Administration 4
1 1
1
M EREDITH & COH EN, P. C.
ATTORNEYS AT LAW 22ND TLOOR - ANCHITECTS DL*ILDING 17TH & SANSOM STREETS P H I LAD E LP H 1.A . PA .19103 JOEL C. MEREDITH (215 SO 4 -518 2 . t st:ITE Soo BRL*CE K. COH EN TELECOPIE R G35; B69-0958 los TR E H o.v7 S TP t ri STEVEN J. GREENFOGEL' sostox.MA canot
. ALso M rwarm Mass nam test; 4Ss 0193 July 20, 1984 J.M. Felton, Director Division of Rules and Records pgygg United States Nuclear g ggy Regulatory Commission Washington, DC 20555 FCIA-pg w3 Re: Freedom of Information Act Request
'd 7-EM
Dear Mr. Felton:
P.ur s uant to 5 U.S.C. Section 552, we hereby request,
.on behalf of all plaintif fs in In Re Washington Public Power Supply System Securities Litigation (MDL No. 551, W.D.Wa.), an
- opportunity to inspect and/or copy records within your posse's-sion, custody or control, including without limitation, all documents, handwritten notes or typed memoranda which refer, relate to or incorporate the following:
(1) Applications for Limited Work Authorizations by the Washington Public Power Supply System (herein-after "the System") for its Project Numbers 1, 2, 3, 4 and/or 5.
(2) Applications for Constr uction Permits by the Sys-tem for its Project Numbers 1, 2, 3, 4 and/or 5.
(3) Applications for extensions of the completion date of a Constr uction Permit by the System for its Project Numbers 1, 2, 3, 4 and/or 5.
(4) Applications for a license by the System for its Project Numbers 1, 2, 3, 4 and/or 5.
(5) To the extent not requested in sub-paragraphs 1-4 hereof, applications by the System for any other type of authorization, permit or license pursuant to 42 U.S.C. Sections 2232 or 2235.
7/l.}-/O 9 /I di m O r u y 1 -ya - v
'. ' M EREDITH & COH EN, P. C.
J.M..Felton, Director J uly 2 0, 1984 Page Two (6) Communications between you or your personnel on the one hand and the System or those speaking on
' its behalf, (including but not limited to, attor-neys, engineering, contracting and consulting firms), concerning adequacy and safety of design,
.. engineering and/or constr uction of the System's
, Project Numbers 1, 2, 3, 4 and/or 5.-
I (7) Communications between you or your personnel on the one hand and the System or those speaking on its behalf, (including but not limited to, attor-neys, engineering, contracting and consulting firms), concerning changes in Nuclear Regulatory Commission rules, regulations or requirements.
(8) All documents relied on or considered or filed of record in connection with any decision of the Nuclear Regulatory Commission, its Boards, Panels or other divisions of any type, (including but not limited to the Atomic Safety and Licensing Board and the Atomic Safety and Licensing Appeal Board),
relating to the System's Project Numbers -1, 2, 3,
, 4 and/or 5.
(9) Transcripts of any hearings held pursuant. to 42 U.S.C. Section 2239 in connection with the Sys-tem's Project Numbers 1, 2, 3, 4 and/or 5.
(10) The ability of the System to finance its Project N umber s 1, 2, 3, 4 and/or 5.
(11) The ability, willingness and/or authority of the Participants to have entered into and/or comply with the terms of the Participants Agreement pro-viding security.for the System's Project Numbers 4 and 5 Bonds.
(12) .The need for the System's Project Numbers 4 and-5, including consideration of any alternatives to their construction.
P ur s uant to 5 U.S.C. Section 552(a)(6)(A), we hereby i request that the NRC respond in writing to this request within !
ten (10) days after its receipt. We f urther request that, if t
you deny any portion of this request, you provide a detailed I
M EREDITII Ci COH EN, P. C.
J.M. Felton, Director J uly 20, 1984 Page Three statement of the reasons for such denial and a description of all documents or portions of documents withheld. -
The undersigned and other plaintiffs' counsel will be available to inspect and copy these documents promptly upon their production and will pay any reasonable costs associated therewith.
appreciated.
Your attention to this request would be greatly Sincerely, MEREDITH & COREN, P.C.
l%
By:/ Bruce K. Cohen BKC/ jr
, cc: Paul M. Bernstein, Esquire Melvyn I. Weiss, Esquire James R. Irwin, Esq uir e Michael Mir.es, Esquire David Berger , Esquire Mark C. Rutzick, Esquire All Defendants' Lead and Liaison Counsel