Forwards IE Insp Rept 50-483/83-02 on 830223-24 to 0314-17 & Notice of Violation
ML20204G053
Person / Time
Site: Callaway Ameren icon.png
Issue date: 04/18/1983
From: Spessard R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Schnell D
UNION ELECTRIC CO.
Shared Package
ML20204G057 List:
References
NUDOCS 8305020350
Download: ML20204G053 (2)


See also: IR 05000483/1983002

Text

. . = ~ . - . . . -

. *

APR 181983

Docket No. 50-483

Union Electric Company

ATTN: Mr. Donald F. Schnell

Vice President - Nuclear

Post Office Box 149 - Mail Code 400

St. Louis, MO 63166

, This refers to the routine safety inspection conducted by Messrs. L. A. Reyes,

P. R. Wohld.and M. A. Ring of this office during the period of February 23-24

to March 14-17, 1983, of activities at Callaway Nuclear Station, Unit 1,

suthorized by NRC Construction Permit No. CPPR-139 and to the discussion of

our findings with Messrs. J. F. McLaughlin, J. N. Kaelin and others of your

staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews _with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as specified in the enclosed Appendix.

A written response is required. In your response please address whether or

not the pressure / temperature limit on the accumulator was exceeded and, if

so, any affect on the integrity of the accumulator.

The need for you to submit approved test procedures to Region III in a timely

manner was discusued during the exit interview. Specifically, your commitment

'

to ' submit those procedures sixty days prior to test performance was discussed

in detail. In your response to this letter please include steps you have

taken or intend to take to assure that you will meet your FSAR commitment to

submit approved test procedures for all tests described in FSAR Chapter 14

sixty days prior to test performance.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter, the enclosures, and your response to this letter will be placed

in the NRC's Public Document Room. If this report contains any information

that you (or your contractors) believe to be exempt from disclosure under

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone

DR hg"o!000M3

PDR

Ino/

. _ . .- . - _ . _ . _ ___ .-. . _

_ -. _ - _ _ . _ . _ ,

. . . _ ._ . _ _ _ _ _ _ . _ _ _ _ . - . . _ _ . _ - . . _ _ _. _ .

4

.

2

'

Union Electric Company g g )gg3

within ten.(10) days from the date of this letter of your intention to file a

request for withholding; and (b) submit within twenty-five (25) days from the

~

date of this letter a. written application to this office to withhold such in-

formation. If your receipt of this letter has been delayed such that less than  ;

seven '(7) days are available for your review, please notify this office promptly -

so that a new due date may be established. Consistent with Section 2.790(b)(1),  ;

any such application must be accompanied by an affidavit executed by the owner

of the information which identifies the document or part sought to be withheld,

and which contains a full statement of the reasons which are the bases for the

claim that the information should be withheld from public disclosure. This

section further requires the statement to' address with specificity the con-

siderations listed in 10 CFR 2.790(b)(4). The information sought to be withheld

1 -shall be incorporated as far as possible into a separate part of the affidavit.

If we do not hear from you in this regard within the specified periods noted

above, a copy of this letter, the enclosures, and your response to this letter

will be placed in the Public Document Room. *

We will gladly discuss any questions you have concerning this inspection.

,

Sincerely,  !

N a u rmi %.ca W n. L. Spcuard"

,

) R. L. Spessard, Director

Division of Engineering

Enclosures:

I 1. Appendix, Notice

of Violation

2. ' Inspection Report

No. 50-483/83-02(DE)

'

cc w/encls:

W.- H. Weber,- Manager, Nuclear

Construction

S. E. Miltenberger, Plant Manager

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Region IV

'

K. Drey

I- Ronald Fluegge, Utility Divison

Missouri Public Service

,

Commission

>.

,

,

RIII RIII 'RIII RIII RIII RII

'

IW fN  % PRu) Gt

^

Sp/

'

. Wohld/jp Ring Reyes onkli St eeter ard

04/14/83 Mg

l

. ,_ _ _ _ _ _ ._ _ - _ _ _._ _. _ _.. _ ._ _ _ _ _ _ _