Requests Reclassification of Diesel Generator a Failure. Failure Should Be Classified as Valid Test & Failure,Not Invalid Failure Due to Listed Reasons
ML20247H710
Person / Time
Site: Callaway Ameren icon.png
Issue date: 07/20/1989
From: Hannon J
Office of Nuclear Reactor Regulation
To: Schnell D
UNION ELECTRIC CO.
References
TAC-73619, NUDOCS 8907310111
Download: ML20247H710 (2)


Text

.9 , ' - ,

. July 20, 1989 Docket No. 50-483 . DISTRIBUTION:.

. 4 Docket Files- NRC & Local PDRs PDIII-3 r/f JHannon TAlexion PKreutzer MVirgilio 0GC-WF1 Mr. Donald F. Schnell EJordan BGrimes Senior Vice President - Nuclear ACRS(10) PDIII-3 Gray Files Union Electric Company FRosa CHaughney Post Office Box 149 St. Louis, Missouri 63166

Dear Mr. Schnell:

SUBJECT:

CALLAWAY SPECIAL REPORT 89-03, INVALID DIESEL GENERATOR "A" FAILURE (TACNO.73619)

By letter dated May 1, 1989, Union Electric Company provided the subject special report. Apparently, diesel generator "A" was declared inoperable due to cooling water leaking from the exhaust valve cooling water jumper 0-rings on cylinder 48 into the rocker arm lube oil reservoir. This condition was discovered when the rocker arm lube oil reservoir high-high level alarm sounded.

The report also stated that this condition would eventually cause the rockers to seize and the diesel generator to fail, and that the engine could not be relied upon to perform its safety function. However, the report classified this event as an invalid failure since this failure j did not occur during a test.

The NRC staff disagrees with the classification of the failure. The NRC staff position is that the discovery of conditions that are auto-matically alarmed or found during inspections, when the diesel generator unit is on standby, that would have resulted in the failure of the diesel generator unit.during test or during response to a bona fide j signal, should be considered a valid test and failure.  !

It is therefore requested that you chang ~e the classification of this failure to a valid test and failure. Please contact us should you have any questions.

Sincer<21y,

/s/ I n . ann n, cW 8907310111 090720 oject Wedorate iib 3 PDR ADOCK 05000483 Division of Reactor Projects - III, S PNU IV, V and Special Projects l Office of" Nuclear Reactor Regulation i cc: See next page Office:hA/PDIII-3 P P SELT OEAB PD/P III-3 Surname: Kreutzer T1d(on/tg FRosa CHauginey JHannon p/89 Date: 7/l3 /89 /W/89 7 // T/89 7 /[ /89 7 h

\

0f (YO j

i

-l -/.*.r

!. 6 3 Mr'. D. F. Schnell Callaway Plant

' Union Electric Company Unit No. I cc:

Dr. J. O. Cermack Mr. Bart D. Withers CFA Inc. President and Chief 4 Professional Dr., Suite 110 Executive Officer Gaithersburg, MD 20879 Wolf Creek Nuclear Operating Corporation Gerald Charnoff, Esq. P. O. Box 411 Thomas A. Eaxter, Eq. Burlington, Kansas 66839 Shaw, Pittman, Potts & Trowbridge 2300 N Street, N. W. Mr. Dan I. Bolef, President Washington, D. C. 20037 Kay Drey, Representative Board of Directors Coalition Mr. T. P. Sharkey for the Environment Supervising Engineer, St. Louis Region Site Licensing 6267 Delmar Boulevard Union Electric Company. University City, Missouri 63130 Post Office Box 620 Fulton, Missouri 65251 U. S. Nuclear Regulatory Commission Resident Inspectors Office RRf1 Steedman, Missouri 65077 Mr. Alan C. Passwater, Manager Licensing and Fuels Union Electric Company l Post Office Box 149 l St. Louis, Missouri 63166 Manager - Electric Department Missouri Public Service Commission 301 W. High Post Office Box 360 Jefferson City, Missouri 65102 Regional Administrator U. S. NRC, Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Mr. Ronald A. Kucera, Deputy Director Department of Natural Resources P. O. Box 176 Jefferson City, Missouri 65102 4

- _ _ . ____