ML20058C094

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-483/90-16 on 901001-05.No Violations Noted
ML20058C094
Person / Time
Site: Callaway Ameren icon.png
Issue date: 10/23/1990
From: Miller H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Schnell D
UNION ELECTRIC CO.
Shared Package
ML20058C098 List:
References
NUDOCS 9010310259
Download: ML20058C094 (2)


See also: IR 05000483/1990016

Text

.

,

.

.

-

,

,

OCT 2 31339

Docket No. 50-483

Union Electric Company

AT1N: Mr. Donald F. Schnell

Senior Vice President - Nuclear

Post Office Box 149 - Mail Code 400

St. Louis, MO 63166

Gentlemen:

This refers to the routine safety inspection conducted by Mr.1. T. Yin and

Ms. K. Shembarger of this office on October 1-5, 1990, of activities at the

Callaway Nuclear Plant, authorized by NRC Operating Licenses No. NPF-30, and

to the discussion of our findings with Mr. W. R. Campbell and others of your

staff at the conclusion of the inspection.

The enclosed copy of our inspection report documents our evaluation of your

corrective actions conducted for the findings identified in your self-initiated

engineering oriented functional inspection of the essential service water (ESW)

system, which was a detailed vertical slice review of the system design and

performance. Within this area, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

We recognize the extensive resource commitment required in this effort, which

resulted in many significant findings. Corrective actions and schedules were

considered to be appropriate.

The establishment of a design basis document

retrieval and verification program for all new calculationst the present pump

vibration measurement / monitoring program; and the efforts-to assure adequacy

concerning flow balancing and supply within the essential service water

systems are considered to be strengths within your technical departments.

Our inspection identified a weakness in the installation of seismic restraints

for the replacement batteries inside the emergency light stations.

Positive

actions were taken by your staff to promptly address the concerns.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Conunission's regulations, a copy of

this letter and the enclosed inspect'on report will be placed in the NRC

Public Document Room.

l

opsp

901cald2N90io23

[DR

ADock osocons3

PDC

g

/6

l/

.

. . _ .

_

__

.

"

'

~ '

e

m

,

-

.

Union Electric Company

"2

30

We will gladly discuss any questions you have concerning this inspection.

Sincerely.

OPuCit'fA SI D ED U N #

-

Hubert J. Miller, Director-

.

Division of Reactor Safety-

Enclosure:

Inspection Report

No.50-483/90016(DRS)

cc w/ enclosure:

G. L. Randolph, General Manager.

Nuclear O

J. V. Laux.perations

. Manager Quality

Assurance

Tom P..Sharkey, Supervising

Engineer, Site Licensing-

DCD/DCB(RIDS)

OC/LFDCB

Resident inspector, Rlli

Region IV

Resident inspector, Wolf Creek

K. Drey

Chris R. Rogers, P.E.

"

Utility Division, Missouri

Public Service Counission

l

CFA, Inc.

E

Gerald Charnoff, Esq.

Thomas Baxter, Esq.

R. A. Kucera, Deputy Director,

Department of Natural Resources-

,

L

-

l-

5

--

o

-.

<

7y

l

iny

am

up

Rn

y

u

yv

R

[ [ ri

'

nb r

7

i

s-

V 102F/903-10/fht-.LMat

.

Mill r

Yin /cf.90 10/p/9ber;

30/1L/_0:

L/90 110/7/90" 10

/900 '

10/4-

,

..