ML20203A309
| ML20203A309 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 06/26/1986 |
| From: | Merhan R, Patterson A, Zill R EVALUATION RESEARCH CORP. |
| To: | |
| Shared Package | |
| ML20202J051 | List:
|
| References | |
| QI-013-01, QI-13-1, NUDOCS 8607170211 | |
| Download: ML20203A309 (2) | |
Text
Pcge 1 of 2
.s 7
EVALUATION RESEARCH CORPORATION p
l CO ROLLD C0'Y.
CONTROL iiO. 300L COMANCHE PEAK RESPONSE TEAM QUALITY INSTRUCTION FOR ISSUE-SPECIFIC ACTION PLAN ISAP-VII.c CHANGE NOTICE: 002 INSTRUCTION NO: QI-013 REVISION: 5 EFFECTIVE DATE: 06/26/86 A
DOCUMENTATION REVIEW FOR INSTRUMENTATION EQUIPMENT /R-E-ININ The QI identified above is hereby changed as shown on the attached page of the notice.
Prepared by:
Date:
"II"hd x<
O Approved by:
Date:
l Issue Coordinator l
Approved by:
Date:
['Sh -If[2 On-Site QA Repfabentative Approved by:
Date:
0 dd Q
Review Teath Leader n)
L 8607170211 860711 PDR ADOCK 00000445 A
PDR l
1
I lh Chenge Notice 002 QI-013 Rev. 5 Change to Quality Instruction i
( ^N Section 5 Inspection Report and Inspector Certification
(,)
Para. 1 Add the following sentence after the last sentence of the paragraph.
" Inspector certification files and Inspection Reports are located at the B&R Permanent Plant Record Vault (PPRV)."
Section 5 Instrumentation Tubing Manufacturing Record' Para. 2 Add the following sentence after the last sentence of the paragraph.
" Inspector certification files are located at the B&R PPRV. Tubing manufacturing record sheets are located at B&R PPRV or TUCCO PPRV."
Section 5 Tube Bender Qualification Form Para. 3.1 Add the following sentence after the last sentence of the paragraph.
" Tube Bender Qualification Forms are located at the B&R PPRV."
),)
/
Section 5 Add the following sentence after the last sentence of the Para. 3.2 paragraph.
" Inspector Certification Files are located at the B&R PPRV."
l l
l l
[ (h
- k. /
l 2
l