Change Notice 001 to Rev 0 to Procedure CPP-024, Issue-Specific Action Plan Revs
ML20203A292
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 04/04/1986
From: Bajada E, Hansel J
EVALUATION RESEARCH CORP.
To:
Shared Package
ML20202J051 List: ... further results
References
CPP-024, CPP-24, NUDOCS 8607170208
Download: ML20203A292 (2)


Text

- _ . _. __ - ____ _

Pags 1 of 2

, EVALUATION RESEARCH CORPORATION COPY CONTROL CONTROLh0.

@M"'-

COMANCHE PEAK RESPONSE TEAM PROJECT PROCEDURE FOR QA/QC ISSUE-SPECIFIC ACTION PLANS CHANGE NOTICE: 001 PROCEDURE NO: CPP-024 REVISION: 0 ISSUE DATE: 04/04/86 e

ISSUE-SPECIFIC ACTION PLAN REVISIONS The CPP identified above is hereby changed as shown on the attached page of this notice.

Prepared by: " Date: !M!M Approved by: . (. E'sofo Date: 4[# !dT, On-Site QA Repre ntative Approved by: a, j Date: Y/// $

Q CTeview Team ~ Leader 8607170208 860711 5 PDR ADOCK 0500

4 4 . Ching2 Notics 001

, / \ CPP-024 Revision: 0

1. Delete Reference 3.2. -

(

2. Revise Section 4.0 to read:

" Responsible QA/QC Issue Coordinators submit proposed changes to their ISAPS to the QA/QC RTL. Subsequently, the SRT approves substantive changes prior to implementation. Changes that are not substantive require the concurrence of the CPRT Program Director prior to implementation."

3. Revise Section 5.1 to read:
"QA/QC Issue Coordinators propose changes to the QA/QC RTL for

! review."

i j 4. Revise Section 5.2 to read:

i "The QA/QC RTL reviews proposed ISAP changes to ensure that they are clear, necessary, and appropriate for the concurrence / approval t

of the CPRT SRT. The QA/QC RTL obtains the concurrence of the CPRT Program Director in changes that are not substantive (e.g.,

clarification or correction of typographical errors) prior to l

implementation. The QA/QC RTL shall obtain the approval of the SRT,

! in substantive changes prior to implementation."