ML20203A292
| ML20203A292 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 04/04/1986 |
| From: | Bajada E, Hansel J EVALUATION RESEARCH CORP. |
| To: | |
| Shared Package | |
| ML20202J051 | List:
|
| References | |
| CPP-024, CPP-24, NUDOCS 8607170208 | |
| Download: ML20203A292 (2) | |
Text
- _. _.
Pags 1 of 2 EVALUATION RESEARCH CORPORATION COPY CONTROL @M"'-
CONTROLh0.
COMANCHE PEAK RESPONSE TEAM PROJECT PROCEDURE FOR QA/QC ISSUE-SPECIFIC ACTION PLANS CHANGE NOTICE: 001 PROCEDURE NO: CPP-024 REVISION: 0 ISSUE DATE: 04/04/86 e
ISSUE-SPECIFIC ACTION PLAN REVISIONS The CPP identified above is hereby changed as shown on the attached page of this notice.
!M!M Prepared by:
Date:
4[# !dT, Approved by:
. (.
E'sofo Date:
On-Site QA Repre ntative Approved by:
a, j Date: Y //
Q CTeview Team ~ Leader
/
8607170208 860711 PDR ADOCK 0500 5
4 Ching2 Notics 001 4
/ \\
CPP-024 Revision: 0 1.
Delete Reference 3.2.
(
2.
Revise Section 4.0 to read:
" Responsible QA/QC Issue Coordinators submit proposed changes to their ISAPS to the QA/QC RTL. Subsequently, the SRT approves substantive changes prior to implementation.
Changes that are not substantive require the concurrence of the CPRT Program Director prior to implementation."
3.
Revise Section 5.1 to read:
"QA/QC Issue Coordinators propose changes to the QA/QC RTL for review."
i j
4.
Revise Section 5.2 to read:
i "The QA/QC RTL reviews proposed ISAP changes to ensure that they are clear, necessary, and appropriate for the concurrence / approval of the CPRT SRT. The QA/QC RTL obtains the concurrence of the CPRT t
Program Director in changes that are not substantive (e.g.,
clarification or correction of typographical errors) prior to l
implementation. The QA/QC RTL shall obtain the approval of the SRT, in substantive changes prior to implementation."
f i
4 i
a l
2
-_-