ML20203A292

From kanterella
Jump to navigation Jump to search
Change Notice 001 to Rev 0 to Procedure CPP-024, Issue-Specific Action Plan Revs
ML20203A292
Person / Time
Site: Comanche Peak  
Issue date: 04/04/1986
From: Bajada E, Hansel J
EVALUATION RESEARCH CORP.
To:
Shared Package
ML20202J051 List: ... further results
References
CPP-024, CPP-24, NUDOCS 8607170208
Download: ML20203A292 (2)


Text

- _. _.

Pags 1 of 2 EVALUATION RESEARCH CORPORATION COPY CONTROL @M"'-

CONTROLh0.

COMANCHE PEAK RESPONSE TEAM PROJECT PROCEDURE FOR QA/QC ISSUE-SPECIFIC ACTION PLANS CHANGE NOTICE: 001 PROCEDURE NO: CPP-024 REVISION: 0 ISSUE DATE: 04/04/86 e

ISSUE-SPECIFIC ACTION PLAN REVISIONS The CPP identified above is hereby changed as shown on the attached page of this notice.

!M!M Prepared by:

Date:

4[# !dT, Approved by:

. (.

E'sofo Date:

On-Site QA Repre ntative Approved by:

a, j Date: Y //

Q CTeview Team ~ Leader

/

8607170208 860711 PDR ADOCK 0500 5

4 Ching2 Notics 001 4

/ \\

CPP-024 Revision: 0 1.

Delete Reference 3.2.

(

2.

Revise Section 4.0 to read:

" Responsible QA/QC Issue Coordinators submit proposed changes to their ISAPS to the QA/QC RTL. Subsequently, the SRT approves substantive changes prior to implementation.

Changes that are not substantive require the concurrence of the CPRT Program Director prior to implementation."

3.

Revise Section 5.1 to read:

"QA/QC Issue Coordinators propose changes to the QA/QC RTL for review."

i j

4.

Revise Section 5.2 to read:

i "The QA/QC RTL reviews proposed ISAP changes to ensure that they are clear, necessary, and appropriate for the concurrence / approval of the CPRT SRT. The QA/QC RTL obtains the concurrence of the CPRT t

Program Director in changes that are not substantive (e.g.,

clarification or correction of typographical errors) prior to l

implementation. The QA/QC RTL shall obtain the approval of the SRT, in substantive changes prior to implementation."

f i

4 i

a l

2

-_-