ML20203A122
| ML20203A122 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 05/22/1986 |
| From: | Bajada E, Patterson A EVALUATION RESEARCH CORP. |
| To: | |
| Shared Package | |
| ML20202J051 | List:
|
| References | |
| QI-073, QI-73, NUDOCS 8607170181 | |
| Download: ML20203A122 (2) | |
Text
-
I Pega 1 of 2 1,
('N EVALUATION RESEARCH CORPORATION COU' R0 lied CO?Y CONTROL N0 DF-col COMANCHE PEAK RESPONSE TEAM PROJECT PROCEDURE FOR ISSUE-SPECIFIC ACTION PLAN VII.c CHANGE NOTICE:
001 PROCEDURE NO: QI-073 REVISION NO: 0 ISCUE DATE: 05/22/86 DOCUMENTATION EEVIEW OF PIPE WELDS / MATERIAL The QI identified above is hereby changed O
as shown on the attached page of this notice.
Prepared b d
Date:
6/2 // 8L 1
T)
Approved by: 7F M h/A2J$w Date:
f/2///6 Issue Cop /dvinator I
/
Approved by:
C.h6mh Date:
On-Site QA Represe6tative Approved by:
q Date:
S 2.,
B(,
i QA/QC Review Team Lead $
/
/
8607170181 860711 PDR ADOCK 05000445 A
r 6
l*'
Chingo Notico 001, QI-013 Rev. 0 1.
Delete the following base material specifications from Attachment 6.4, ASME IX MATERIAL DESIGNATIONS:
SA-182 Grade F22 SA-234 Marking WP22 SA-387 Grade 22 Class 1 Add the designation "(65)" after material specification SA-234 Marking WPB (60) in P-Number 1. Group Number 1.
2.
Delete all references to notes 9 and 10 on Attachment 6.5, ASME INSPECTION REQUIREMENT MATRIX.
3.
Revise the first verification bullet in Attribute 7 to add the word "ASME" and read:
"The Inspector's area or category of certification at the time of inspection is ASME QC Level II, as a minimum,....."
lO I
1 l
s
!O 2
_ _ _