7-1.
(
Pag 2 t of 6 i
EVALUATION RESEARCH CORPORATION COMANCHE PEAK RESPONSE TEAM QUALITY INSTRUCTION FOR ISSUE-SPECIFIC ACTION PLAN VII.c INSTRUCTION NO.: QI-044 REVISION:
2 ISSUE DATE: 04/01/86 C0 G 0__ D C0?Y CONTROL NO.DF-CO/
DOCUMENTATION REVIEW OF CONCRETE PLACEMENT Prepared by:
/'
vF/[9 Date:
I.1/- /(
i j
Y ~[ I Approved by:
N I-Date:
Issue Coordinator M !!!((e Approved by:
[.
6/
8 Date:
On-Site QA Represent ive Approved by:
Dater Y /
- dd QA/
Review Team Leader
/
0607170152 860711 PDR ADOCK 0D000445 A
t, QI-044 Rsv. 2 fg 1.0 PURPOSE
-Q)
This procedure provides the methods and accept / reject criteria for the performance of a documentation review for concrete placement.
2.0 APPLICABILITY This procedure applies to the performance of an independent review of the documentation for all safety-related concrete placement.
It applies to the samples selected from the population described in the Population Description for Concrete Placement.
3.0 REFERENCES
3.1 QA/QC-RT-922, " Description Memorandum for Document Review of Concrete Placement" used in development of procedure and includes specific sources for attributes and exclusions.
3.2 QI-043, " Reinspection of Concrete Placements."
3.3 CPP-009, " Performance of Reinspections and Documentation Reviews."
4.0 GENERAL Documentation reviews are performed and documented in accordance with established CPRT procedures. This procedure establishes the attributes and accept / reject criteria for the documentation review of Concrete Placements. Reference 3.3 addresses the method to perform and document the reviews.
4.1 Responsibilities 4.1.1 QA/QC Inspectors QA/QC Inspectors perform documentation reviews in accordance with established project procedures and instructions. Reference 3.3 addresses the method used l
to perform documentation reviews and to document and j
process the results.
4.1.2 QA/QC Discipline Engineers The QA/QC Discipline Engineers prepara the Quality Instruction delineating documentation review requirements and attributes.
l0 l
2
,a e,
QI-044 Rev. 2 i
N 5.0 INSTRUCTION d
Using the information below~, perform the documentation reviews on the sample items listed for this population and document the results on the applicable checklist (Attachment 6.1).
Attachments 6.2 through 6.9 are examples of TUGC0 Inspection Reports, which include attributes applicable to the documentation review. Using these documents as a guide and any other available information, the inspector shall review the Inspection Reports of the sample placement to determine which attributes are applicable.
Where no inspection v9rification exists for applicable attributes, DR's will be initiated. Where the documentation for a given attribute is missing, lump all sub-attributes into a single Deviation Report.
1.
Design Mix, concrete batching and conveying.
Review the Concrete Production Inspection Report (see.2 for sample) or similar document to verify notation that:
MixI esign cards were approved and signed by the QC d
A.
inspector.
B.
Mix, design card used corresponis to the mix specified by the-Field (Engineer).
C.
Mix' design designated on pour card agrees with batch ticket.
Batch ~plantscalesareincalkbration.
D.
E.
Batch ticket (see Attachment 6.3 for sample) properly filled out for receipt and add water after delivery.
Verify cl:at when water is added to truck, data shown on.9 does not exceed that allowed on c.3.
F.
Truck mixarssrequired to complete 70 tavolutions at mixing speed before start of delivery. this' f tem is applicable-to concrete batched in trucks only.
G.
Trucks are discharged before 45 minutes if ambient temperature is above 85'F or 90 minutes 'il approved by the engineer.
2.
Forms, Construction Joints Review the Concrete Preplacement Inspection Report (see.4 for sample) and the pour card (see Attachment 6.5 for sample) or similar documents, to verify that notations O
have been made.thatt 3
QI-044 Rev. 2 5.0 INSTRUCTION (Cont'd) 2.
Forms, Ccnstruction Joints (Cont'd)
A.
Form work was installed with consideration for i
stability, line and grade, tightness of joints and cleanliness.
B.
Proper installation of construction joints, clean and properly wetted.
)
i C.
Seismic air gap is in compliance with design drawings, and protected from intrusion of foreign objects.
D.
Pour card is signed off by craft and engineers, with a unique pour number.
3.
Rebar, Cadwelds, waterstops, anchor bolts, embedded plates Review the Concrete Inspection Report (see Attachment 6.6) or similar document to verify notation that:
A.
Rebar is correct regarding size, spacing, concrete to rebar coverage, and properly installed.
I B.
Cadweld/ lap splices meet design requirements.
4 C.
Dowels are installed with correct anchorage length.
D.
Anchor bolts are the correct type.
E.
Waterstops are accurately installed.
F.
Correct embedmont has been installed.
i J
4.
Depositing and Consolidation Review the Concrete Inspection Report (see Attachment 6.4 for sample) or similar document, to verify notation that:
A.
Placement rate ensures proper integration with preceding lift.
l B.
Placement lift does not exceed 18".
C.
Placement technique causes minimum segregation.
D.
Placement placed to proper grade.
E.
Vibrators operate at a minimum 8,000 I.P.M.
l F.
Vibrators not used to convey concrete more than 3 ft.
I G.
Vibrators penetrate approximately 4 in. into preceding lift.
4 i
\\
a.
i QI-044 Rev. 2 l
l 1
l 5.0 INSTRUCTION (Cont'd) 5.
ATTRIBUTE DELETED 6.
In-Process Concrete Tests Review the Concrete Placement Summary (see Attachment 6.9 for sample) or similar document to verify notation that
. (
j A.
Air content is ecorded and meets the ace.eptance criteria listed on the Concrete Placement Summary.
B.
Slump is recorded and meets the acceptance criteria on the Concrete Placement Summary.
C.
Concrete temperature is recorded and meets the acceptance criteria on the Concrete Placement Summary.
7.
Curing Review the Daily Curing Verification Report (see Attachment 6.8 for sample) or similar document to verify notation that:
A.
Curing requirements have been properly addressed in the Daily Curing Verification Report.
()
B.
The Curing Log has been initialed and dated for each curing day.
8.
Compressive Strength Test Results Review the Inspection Report on compressive tests of concrete (see Attachment 6.7 for sample) or similar document, to verify that the specified 28-day design strength as summarized in the inspection report has been met for both:
A.
Laboratory cured cylinders.
B.
Field cured cylinders.
9.
Inspection Reports l
Verify that all Inspection Reports addressed in this QI are complete (i.e. all applicable attributes addressed, and the reports initialed or signed by the QA/QC inspector), and the correct Pour I.D. number has been incorporated.
s t
y
~' s,
i 5
QI-044 Rev. 2 4
5.0 INSTRUCTION (Cont'd)
(}
4 10.
Inspection and Test Personnel Certification Verify that inspection and test personnel were properly certified to perform the. inspections and rests as follows:
]
a.
The certific& tion was valid at the time of inspection, i.e. the date that the inspector initialed / signed must be on or after his certification date and prior to his certification expiration date.
l b.
The inspector was certified to the procedure used at the time of signature.
If this attribute is rejectcd determine if the person that signed as QC inspector was ever certified to the procedure used.
If the
"\\
inspector was ever certified to the procedure record the time period of certification, otherwise state in the remarks column that the person was never certified.
NOTES: Inspector's name shall be recorded on the checklist when a deviation occurs.
()
If any initials and/or signatures are illegible, an attempt shall be made to determine the inspector's name by checking the signature cards located in the Permanent Plant Records Vault.
If identification cannot be made the inspector shall reject this attribute.
6.0 ATTACHMENTS
6.1 Checklist
Concrete Placement (3 Pages) 6.2 Concrete Production Inspection Report (2 Pages) 6.3 Concrete Batch Ticket 6.4 Preplacement Inspection Report (2 Pages) 6.5 Concrete Pour Card 6.6 Concrete Inspection Report (2 Pages) 6.7 Concrete Compressive Tests Report l
6.8 Curing Verification Report
(
6.9 Concrete Placement Summary a
4 6
Attachmant 6.1 QI-044 Rev. 2 Page 1 of 3 L
CHECKLIST COMAWCRE P'.AE RESP 0stSE TIAN CRECKLIST r9rvtu tou DEsc vgmIFIcATION Ftc no.
FACE L OF 1 Concrete Placeeest QUALITY INSTRdCTION CREINSFECTIQW O cutt t yt-044 EQUEFMENI MARK /TmG 80.
@ DOCUMENTATION RETIElf
[ UllIT 2 O c=o=
vt31FtCAf!03 I
SZJECT DATE 1.
Destga Min. Concrete Batching & Conveying A. Mised Design Cards-51ae-Off
- 5. Mixed Design Cards-Specified By The Field C. Mized Design Cards-Proportions D. Batch Fleet Scales E. Satch Ticket F. Truck Misere-Revolutione l
C. Truck Discherme Time 2.
Forme Constructies Jetate A. Installettee of Fers ifork
- 3. Isotallation of Constructies Jointe PRDAaED ST:
gr30TED STs DISCIPLINE ENGE.
DATE LEAD OtSCIFt:NE DIGE.
0AIE Laarssamu ET:
Ap hinu 51:
i L" U E DATE LEAD IN5PECTOR SA;E CPFad17.tA. Revision el j
Attachmant 6.1 QI-044 Rev. 2 h
CHECKLIST (Cont'd)
Coe u cut PsAs ResFossa Trm l
CNCCKLIST a
1 l
rvru uTION DE5C VERIFICATION FEC N0.
Concrete Placement FACE L OF 1 VERIFTCATION A
I I
ACCEPT REJECT Daft
- c. Seteetc Air Ces 4
O. Pour Card St M ff a
3.
Rober. Cadweles.
Waterstepr. aether Belte. Embedded F1ste'i A. Rober-Stae.
Spacing. Concrete Cover & Freper Ynetellation
- 5. Cadweld/ Lap O
Settees C. Anchorage Length of Dovete D. Anchor Bolte-Type E. Installation of waterstone F. Installation of Embedeent 4 Depositing and Consolidatioe A. Placesset Rate S. Placement Lift C. Placement Technteue D. Placement Crede E. Vthretore Speed F. Vibrator Coeveyine C. Vibrater Penettetton crr nn?.la. Reviston 0 2
\\
Attechmsnt 6.1 QI-044 Rev. 2
(-
(,/
CHECKLIST (Cont'd) i l
COMANCHE FEAK RESPONSE TEAM CEECELIST POPULAIl0N DESC VERIFICATION FKC 30.
Concrete Flecesent FACE l 0F J 9E11FICAT109 ACCEPT REJECT DATE 5.
Attribute Deleted a
6.
ItwFrocess Concrete Teste A. Air Cemtent
- 3. Slump C. Concrete Temperature 7.
Curing (s\\
(
. ~ A. Curing Requirement e Properly Addressed B. Curing Log initteled and Deted 8.
Compressive Strength Test Results A. Laboratory Cured Cylindere B. Field Cured Cylinders 9.
Inspection Reporte
- 10. IneFection and Test Fereonnel Certificatios l
9 l
C2?-007. !3. lavision 0 3
Attachmsnt 6.2 QI-044 Rev. 2 Page 1 of 2
(
i COMAhCME PEAR STIAM (LECT 8tC STATION INSPECTION REPORT f3 sesrun.
.m emum ContatTEPROCUCTIONINSPECTIonfaavaiuriase.
.u sia, swum saTCM M.Anf pss.as.
insi.
mar.s.t. ms, a art, a omnes w.
y
- a :sarsaw..usu. g.
2323 55 9 J al01 07 11.0 8. Rev.
.I Q is,pecria Q ses iss;aua::s y restauatie n sinat Q set tst sescass ventricatier asustria
- sssectim isssecties Yew. *ssutts C :ssesc?im sosutta. at aseticasts afsms satsstantser 85 S'5U8 s'
Q towsttim coststes. ussettstsc ess ittps Lista esta s
itse e.
3gh INSPECTIOR ATTR!bUTES 3
satt 18 13 11 NOTE: The fellemine attributes aust te voetfied ertse l_ l l to consencement of ano tatsnine eserations.
l l l'
l l l l'
l
- 1. lAll ets destem cares aeoreved and stomed nr a OC Inseecterj l
l 2.
Detaretnattaa of accreeste meistures.
I il I
- 3. htece2 nation of FM for fine aeereeste.
I l I a.
Asereeste motsture deteretnetiene cameensated for I l l 1
1.
Aeerogata aradatten testine canalete.
I 1 1 6.
nts denten care uses cc. fin-te ein sneef ftee av the l I
i field.
I I l
?.
mis desten care has same ocesertions as ersetaal ets I 'l l design.
l l l 8.
Saten slant scales ta calibrattoa.
I i l l
l 1 I i l
OAILT SATCM PLAaf OPERAff0NS I l l l
I I I i
1.
Concrete bulk estarials stared la accordance with i I l l
2323 55 9.
l l l l
2.
Infetuotten en beten tickets is correct.
l l l l
3.
Saten ticket erint euts within saeciffed talerances fee l l l l
cement, aggregates. water and samtstures.
I l l
l a.
Raedes eneet of maten tickets for vert f tcattom of water. l l
l l cement rette.
l l l l
h i I I l
l l l 1
I I I I I I Contioned e. Few 2 I I I l
i I i i
Attachmsnt 6.2 QI-044 Rev. 2 1
i C(sumCNE PtAE STIAN ELECTRIC STATION INSPECTION REPORT FOR PULL utA0lMs. Sit SWEET 1 e.
,,.n I i
. = l, us.t.
s ConcarTE MII!M Ano C0:4vtY!st i
! l 1
- 1. ifrwst einers c.leen and free of concrete build-ve.
I l I.
Tructs easty arter to start Of leadine.
l 3.
Trust steers leaded at teet.ua slant reeutred te canalete l
70 revolutions at etsing seced before start of delivery.
I l
4.
Truck revolutten counters feastica erseerly.
l l
S.
Satch tittets erecerlw filled out for receipt and add l
l uster after deliverv.
6.
Tructs are dischareed before 45 etautes if amatent l
-ature in amave ager er to minutes if a_. ___f he l
l l
l the Eneineer.
l l
1 l l
I l
l l
I asanass gem. : pets, gu.3 f
Iai t.a. CLasse Q
l"
- i. !
~'
2 l -
Attachmsnt 6.3 QI-044 Rev. 2 Page 1 of 1 FIGURE 1 - Concrete Batch Ticket N
N h
cc Q
g I
W y.
-l
.i g.
- l
.I i
1 i
i g
d e
4 I
E 4
g e
I I
l 3
t 5
3 I
I.
l k
I
- l I
u Y
l E
=lw si.
I s,
O s
=
=
r.
i.
r.
s
=
'=
a!
v 3
1 M
2 3
l g3 j
a 6l.
l l
a e
l l
8 s
s 3 2 E
ll
=
3 N
.i l 1
5
]
3 3 3 i ~'
j 3
e g
3
=
I I
E 8
l
- s 5
.e
=
i 5
O i
j
..4 QI-044 Rev. 2 Page 1 of 2 Comanens asAs :Tess e.z:rnec stafica
,t 2
181MCT10N HOCitT
("*
,_.~.
- i...., - r.
=
y
..m p, e.
.I,.
..,. - -Ot-w.u.o-i. ns.
m.
,1 Cl" " Ells CPE-Div.=" CP*%tm crg,,,
aP;,;;r,,,
em assa.rs C.uperm somsuTus. au. as.usae6s efuse safwastese
,j Q mesesma ensutus, v.sesnsfest iTuus ustus assu y
ge.fsi,J,Q t
wisseman arrnisures l Ii 1
I I rimhi I I i
h POUR CARD SIGH OFF IT CRAFT AND EMSileEERS. WITN UN!QUE I 1.
I i i i
pcus E==ER.
11 I i
e 2.
I Fasematt-sTastttTT. Ltur Ano ""?'*. TtGHTNESS OF lil I
I I l
IJotwT1 AND CLEAMLlutSS. J0!NT1 GACRIT ftGMT.
i l F 1
(,,,
I 3.
I e M i tRSTALLATION OF (IPAleED METAL CONSTWCTlan i i Il JOINTE.
l I
I 4.
I a-iisscTion Jolpet ettAN AND i-ZC2_f hunau WITH l
i I
l l~l H l
__I ife0 ST g WAftR.
no m #tilkE # 5 E I
5.
I Act0UACT OF PLACluS PER$GEIEL AIS EtRitPMDif.G Yl FBK $ k l.,
a u 5 g= (--
8.
'l E- -ia at - FAsB!CAft(II TOLERAfICI IS Ptt DEstGN 1
'I I
t I i i I
00Ciself OuttlIS PLACEMNT.
j 1 ll I
i l
I tristic AIR SAP IN Cl3EILf 8"** W1718 Ot310ll OftAlftuss, I i1 7.
f i gap au?iian FaM INTEttfE W 70EtEGil ORMCT3.
1 il l
l l l i
l l
6 I I i
I re s -- 7 RAff - ' i *t!!PER TRTIGRAf te WITN PRECE0!M i l I
I a.
ILIFT AND PtACIMS COIFtWES TO THE PittP0uR PLAN l l I
l ll i
I l
i li i
i I II i
s.
l..- - u tirft no not excern is".
l ll I
i l
in.
I pe a...,m,,, TtcMutout cmsts utn!Mun srsRtsATIQn.
I II I
I l
I i l I I
i t
.,.4 QI-044 Rev. 2 9
CIMARCIIE PtAs SMNO REfBBC STAf!W IllSPECT!GI REPORT (swm.cera Mit FULL MEASINGI. $tt SNEET 1 as.
If90 g
g as.
]
]
M 184Ranat 11.
TranAM MUT UttB 10 ctMTET """'TE IERR Tuas 1 FEIT 11 PanA. 1,2.2 4
1 t?
visa & TORS PENETRATE i ?
_---Y 4 ""** tlft9 FRE.
ll j
DEntMC f.IFT.
l l
1 l
t1.
?!BRATORS OPERATE & MIlfl30Bt OF 8.000 tMr.
I
=^ -
. IF F'==
14.
--- - --- 4 P' -
. 6 _ ------
m ts e=emers team to cir. tas. ca A wm-== or 1 IF F' M 18 to LY.138. OR t.ESS.
E' M I/S m 4
PWt
('i 9
,,,e,m, I
"%QO ta_
tr.
4FrucaTraw of asume infra.
ta-WT S Git.a ma- "=='==mam fler N I
scusssa (ass 37E5. (E)
I i
6 e
~'
I.a. CLasEB C
l es i
I l
t l
2
Attachmsnt 6.5 QI-044 Rev. 2 Page 1 of 1
& FM CAN en er peut pas lagett i
NEstPT13 (IF mat.sammar; Esflmim costum on.
e ITM CAAFf SIDERVfB EIGIMata etste NIX f.S. W.
I----------------
i' "
LIM & GAAM H HItaammassatttIIIIII pqmg '
REMS OWN CAAELSB I
ELECMICAL a
i--
IN5fBisitWAff0N RfDES ISR Pfl0 JECT ENGINEER E1ee. 5 Mech. et Civil 5 Cees,...,ieu.
e.
ee to.ei. ding.he f.ettee and Switchecer tidge.) to be per each sta 19. delly sely.Civt1 Eastseer Date ree toes then Se euhts yeede of ats 19 per der o.ress.k.
slump, ear sessent. vest weight and temperature teste see weived. Civil Engtseet Det?
,.6 QI-044 Rev. 2 Page 1 of 2 a:manc3e esa tram e.stres stanam iss9ECTiefe 2 0 0187 pm GLOClout 80ultaCE J
.is.
srms.,.as
-__- - se
. - - =
aur aa ;m a es, e amemas =
.a ur saw.pr =
mm aus.
g
)
15 9:55 18 J m 01 0P.11.6 2. ase.
Om
- s s c w. = o r*.a u a c r u,,,.
c7=w,
s m Mrs Q escena enemmes, am assusasha arme entweetur i
Q menevise sammme. unapumeteor itque wvus asias j_ g g o,. J,,,, j a.speem anmeurs:
t 1artmaneavam errn te ramarrv terr aan amare m,
i I
i 1enmeen m.m e m,m.ien
,,e I et g
i a li 2.
IraarerTr to erama envramar rt wtfuta frarearr_
11 e
8eama 1t t t I f I
i i.
CASICLOAAP ULICt3 I'ttT E5tm storsomst. Has 3.1.1 i t i
a l i i
t a
enntame aan tairas free mar tw enmeret utfr ama aar nr. I I e 1
i cusamt tocaten eena t t. t
_ _ 'Jul.a rs :1 e
- T '4!r t 9 48 e*i 1.
neans tyrammt Aar rammer? ttfr_ imaart am ts#5 d E "I@WeJ
" ~
l 8
seen, maan s,a I
i 4.
Oglas am 1157aLLg8 wifle COMT amoanist LUIETII i
e i
pass. 1.1.1 1
1 l t D
f 7.
8 agt g staa anae gang fg.
i astrufart e _ pamat t j 1 I
I i l i 1
I s.
!cir sans agress in erstan ana=murt ansian restam I 8 6 4
I I cannW5.
I I I
.. t I
I I
I i
MISCIL M 1TTEL 4 M M ITD S I
e i i e_
8e *rattest or uttert i amansa tfert Imet at arTatt ra andt i 3 3 8
'seerm, tre arn essa,,,
i 6
to.
19=== anft 4ar Twr canarcT st2r, Typr. e araffest ama 1 !
1 l-
- pasA i 1 7 8
j i
e l
tt.
tpaavettaa :er amamus eatft rams mr enmentTr ts ramartf 4
,.6 QI-044 Rev. 2 pges gfE4as S.8CTmg 3?AT10ft CT1000 REPOM.
sees 2 ef 2
tapuMWmu mis att ugAatues. 55 SEET l.
se.
T lhfPtim0N AtT140ufts
- {
Uk. g l
AIS AfLT THAEADS MAvt WTE PELIECTitM M ruuimulW a
11 (Cent PAAA. 3.1.2 6
12 Wmitmauvri M ^
"ILLT IN3L"J_".
PAIW.J.l.3 safrTT.astAftB WM MAVg 7= =aaILITY VERIFIED AM 11 pealNTAINED. PARA 3.2
>t i
I l l ii t
1 m
n "pf t.a ta u9 2 A
'"iA E r1as e i;,
AEBBMut38 m eestJ NJ l
l l
4
~
,li.n.ca.aees O
e 2
1 I
Attschmant 6.7 QI-044 s
Rev. 2 Page 1 of 1 O
e esas man s6ssies sesam pas e asses, a sesweems vesse er seassis e,.
seessmas --
.e yea e.
ee es= we.e==
m, een
,a m
se so I
,=*,:2 e===i==.=
.em
= = wee s===.== '
= =a < a i
i a.
, e e.
.==s===nas e.
i.e.
= we enev
===4 eaa.
O assem===
0e Q same e om e I =O asse Q em O===
e v
aus e.usse =
O mensaus======
.s. nam w
esa som
=s.
'L.
e.n a m e, w.
.em e w
s to
&.,',y, g-f.our p
.es a m e.s., ear.1_
.us a.
esog 6 uge fe.8 p
gut.ege e g
==
.m.
s 8
s
.m.
1 3
.we e a= see e 8
me e se wan, ves, asents een se e, essas ane es
.a siaew....
==
m 9
6 agene% e He 8 M999900*
l W-Get6 WSIWIM 99 W 6 IEW O SI S W W adSS
.et tagsge em8 es Speses. w eest s ges 8u gws. f ues 98 8 S et Smetes. et set eW 9 G E.W.S.MB W e
uB e8 l
-== = -..
.aamma sm maa.a gamme a as -~~
EN h.N W.0= G
,I
7
,,.8 QI-044 Rev. 2 Page 1 of 1 consamens Mme eTEAas ti.scTmc sta11ese
,t 18894C7101I IEMMT F
i n== =
n.as - - ---
ira _.
Cesef ag veriffeatles d
sur s.s sun. e e e smammu m ga uemme en.ser s asur = =.. =
gauw.
mm 01-0P-11.0 11 se,.
,i SS-9 d
i g.
. met same.Ts O esestles eeun# tee.and,assuaashg efang saftreefear c
wei 4sm.
we, ivos wavie
,4 6,
g inspearian amisurts ee, 2
e
- 1. lCortee Insgestles Regisirgesets heve been est (Sett. 3.31 l
l 2.
Pretaattee free lamenmalcal Oaeses flaat. 3.4) i I
3.
Field Cered Cylladers (Sect. 3.9)
I I
0411y Coring Verificattee (Sect. 3.8.2)
~
l l
l 1
titoes testes '
was ap0LICAE8 est I
3 4
5 6
7 8
9 10 11 II 13 le 184f14L3 l l
- M i
eseos tema certag summune la ease enant toesgrtly of eastisettem ey mostleg surfesa eten unter, if tas enese ferus ereolets or See85, las earteg file it 4Geensee.
I RIG N IM.55p4 fyse of tapet flue of rese Asummel I
I re.o or e...
I II I
I II I
I l
I emas =% av en se so t.
's e:.,. :i s4 U l
I
\\
=.i a w.igi,c l
l l
l l'I i
i I (Centinued en paan 21 l l l l
l
'I IIS*wissedby:
LEVEL tt GATE:
_. ~ _. _ _ _ _.
l
..9 QI-044 Rev. 2 Page 1 of I i
l b
fanas Utillttes Generettag Campesy Comessas poet stans tiestric statten Page er glWETt PLACDWif EfeeWT
,... case _ _ _
pose no.
teuipment used:,
fetal Tds. Placed:
Thorummeter(s):
Sting ag (Is.):
to AirMeter(s):
Air Cast. Ag.5 to 1
Sluse(s):
Temp. Ag.(P):
to Nts 1.0.:
Wit IdetW4:
Test
- flebet, 3 hse Air Eengreat negar Add meer 2
an.
an.
ta.
1 f-T.
sale.
1.
9 3.
- A i
i a
l I
I I
a.
i e
in 11 11.
11.
ta_
14_
f4_
I F.
12 14 I
- zo.
Inseecwnemanictea maa ta s.eentwivesivae.
,,,,,,,