g Paga 1 of 2 EVALUATION RESEARCH CORPORATION N]
COMANCHE PEAK RESPONSE TEAM QUALITY INSTRUCTION FOR ISSUE-SPECIFIC ACTION PLAN VII.c COT 10 ' 9 C0 3Y' CHANGE NOTICE 001
. CONTROL N0,DFCDI INSTRUCTION NO: QI-052 REVISION: /1 5 Cl1l%S ISSUE DATE: 66/63/86 DOCUMENTATION REVIEW OF PIPE WHIP RESTRAINTS r
Prepared by:
Date:
g Approved by:
.' l.,. /,,/ / / h Date:
4///eP4 Issue Ccp/ddnator Approved by: M Date:
/-S-Sn.
On ' Site CfA Representative Approved by:
Date:
G 3 /4 Q
C Review Team Leader I
f f QO711 I
n
-- --000443 PDR
f
.Changs Notica 001
' g?
QI-052 1.
Page 3, Replace the whole Section 5.1.2. as follows:
$ ()
5.1.2 Drawings (IB)
. Record on Attachment 6.8 all drawing (s) and NCR(s) listed, referenced or physically included in the traveler package (s). Do not list this information from any historical file that may be included in the traveler package. The Discipline Engineer shall compare these against the drawing (s) and the NCR(s) used for the reinspection program and initiate Deviation Reports, if appropriate.
Note: For the Document Review Packages completed before the
. issuance of this' change notice, the Discipline Engineer shall review (and update, if necessary) Attachment 6.8 for above requirements.
2.
Page 4, Section 5.2, sixth line in the text; replace "Section 8.5" by "Section 8.1 or 8.5".
3.
Page ll, first paragraph, replace " receipt inspection documented on the RIR" by " site inspector has indicated on the RIR that the '