Rev 3 to Quality Instruction QI-001, Procedure for Class 1E Cable Terminations Insp - Comanche Peak Response Team Action Item I.a.4
ML20202J729
Person / Time
Site: Comanche Peak  
Issue date: 12/28/1984
From: Celli G, Hansel J, Michael Jones
EVALUATION RESEARCH CORP.
To:
Shared Package
ML20202J051 List: ... further results
References
QI-001, QI-1, NUDOCS 8607170137
Download: ML20202J729 (5)


Text

Y 3.x V

c. c q yk ' l301D CO?Y COMANCHE PEAK RESPONSE TEAM QUALITY INSTRUCTION COMROL M0-CPRT ACTION ITEM I.a.4

()

INSTRUCTION N0.

REVISION ISSUED DATE PAGE 01-001 3

12/28/84 1 0F 2 Procedure for Class 1E Cable Terminations Inspection - CPRT Action Item I.a.4.

/B /88[/M PREPARED BY:

d DATE Evaluatigh Res'earch Corporation

+

APPROVED BY:

ddad S /44,M -Kw.I/ha6ce.

DATE

/c9//d8//p Evaluation Research Corporation N[ b DATE M 8

APPROVED BY:

/A

,,4.

~

/

/

Te~ ant LeaWEY E ec gT.

1.0 REFERENCE 1.1 Office Memo,12/6/84, M.B. Jones to J.L. Hansel, " Action Item I.a.4 -

Sample Selection".

2.0 PURPOSE AND SCOPE 2.1 The purpose of this Quality Instruction is to define the method by which to verify the adequacy of Class 1E cable terminations of the (aj circuits that are necessary to prevent Core melt down at Comanche Peak Steam Electric Station. This is in direct support of the CPRT Action Item I.a.4.

2.2 The scope of this Quality Instruction is limited to inspection of the random sample conductors previously selected (see Ref.1.1), verifying

.that the as built locations are in accordance with design documents.

3.0 RESPONSIBILITIES Quality Inspectors (ERC) shall be responsible for physical inspections and completion of the inspection reports. The Electrical / Instrumentation Review Team Leader is responsible for review and approval of the inspection reports.

4.0 INSTRUCTION 4.1 VERIFY TERMINATIONS: The following criteria applies:

4.1.1 The Quality Inspectors shall verify that conductors are terminated to the proper place and in accordance with the latest applicable Engineering drawings or Vendor drawings.

O 8607170137 860711 PDR ADOCK 0D000445 A

PDR

\\:

  1. QI-001 REV. 3 i

Page 2 of 2 4.1.2 Where the physical terminations do not match the drawings, the em Quality Inspectors shall sketch the location of the conductors.

U 4.2 VERIFY CONDUCTOR IDENTIFICATION 4.2.1 The Quality Inspector shall verify correctness of conductor identification by use of the attached conductor identification tag 3

(containing cable numbar ) and correct color code as shown on current design drawings.

4.3 DOCUMENTATION (as applicable) 4.3.1 Quality Inspectors will be furnished an inspection package containing a controlled drawing of the latest revision and any DCA's pertaining to the cable being inspected, a SWA/TWF, and any other documentation and information needed to complete the inspection.

4.3.2 Quality Inspectors accompanied by ETG or Start-up (in accordance with their requirements), shall inspect the identified cable termination in the identified cabinet for agreement between connect drawing and field termination.

4.3.3 Quality Inspectors shall document the results of the inspection on the speciel I.R. provided (Attachment 1).

The I.R. shall be completed in accordance with Attachment 2.

If the inspector finds a discrepancy between the connect drawing and field termination, he or she shall identify the proper attribute and identify the discrepancy on an s

information copy of the termination drawing and attach the drawing to s

the special I.R.

The inspector shall also note the discrepancy in the remarks section of the I.R. along with the drawing number, revision and any applicable DCA's.

The. I.R. shall be reviewed for legibility, accuracy and completeness and approved by the ERC Level III. The completed I.R. shall be submitted to the Electrical / Instrumentation Review Team Leader for review / approval of satisfactory items and for evaluation referral of unsatisfactory items to TUGCo Engineering for disposition.

i O

J

- - - - ~ _. _ - - -. _ _.. - - _ _,.. _ _.

01'-001-REV.

3 ATTACHMENT 1 PAGE 1 0F 2 SHEET 1 0F COMANCHE PEAK RESPONSE TEAM INSPECTION REPORT - CPRT ACTION ITEM I.a.4 DRAFT O

REV.

v

' a EM DESCRIPTION: CLASS 1E CABLE TERMINATIONS Tennination Dwg. No.

b Revision (2)

DCA's INSPECTION ATTRIBUTES:

Activity 1: Verify proper cable identification (Para. 4.2.1).

Activity 2: Verify proper cable termination (Para. 4.1.1).

Activity 3:

Identify terminal board and terminal point for each item inspected, indicate SATISFACTORY or UNSATISFACTORY condition.

Sign and date results and indicate applicable DCA's in coments block, and indicate discrepancies with drawing number and applicable DCA's in remarks section.

CABLE CONDUCTOR STATUS SAMPLE CABLE COND ACT.#1 ACT. #2 INSP. SIGNATURE N0.

10#

COLOR TB#

TP#

S U

S U

AND DATE COMMENTS W

(iD (h) &

(in) m m

v h

REMARKS:

1 l

INSPECTOR h

DATE BADGE #

r "EVIEW AND APPROVAL M

DATE

! V Evaluation REsearch Corporation REVIEW AND APPROVAL h

DATE Electrical / Instrumentation R.T.L.

REFERRED TO TUGCo ENGINEERING FOR EVALUATION h

DATE I

El ectrica l/ Inst. K. I.L.

e 8

ATTACHMENT 1 PAGE 2 0F 2 01-001 REV.

3 SHEET OF t'"J' CABLE CONDUCTOR STATUS CONTINUATION SHEET ACTION ITEM I.a.4 DRAFT h)b TERMINATION DWG. # h REV.h REV.

SAMPLE CABLE COND ACT. #1 ACT. #2 INSP. SIGNATURE NO.

ID #

COLOR TB#

TP#

S U

S U

AND DATE COMMENTS b

_a 1

l j

l l

REMARKS:

W

-e

m ATTACHMENT 2 PAGE 1 0F 1 REV.

3 Procedure for Class IE cable Terminations Inspections - CPRT Action Item I.a.4 INSPECTION REPORT (Completion Instruction)

The numbers below correspond to the numbered blocks on the Inspection Record:

1.

Enter the Termination Drawing No.

2.

Enter Rev. of Termination Drawing.

3.

Enter all DCA's.

4.

Enter Sample No.

5.

Enter Cable Identification No.

6.

Enter Conductor Color Code.

7.

Identify Terminal Board.

8.

Identify Terminal Point.

)

9.

Indicate SATISFACTORY or UNSATISFACTORY for Activity 1 and Activity 2.

10.

Enter the Name and Dated Signature of Inspector.

11.

Indicate applicable DCA's.

12.

Identify any discrepancies with Drawing number and applicable DCA's.

NOTE: The continuation sheet may be:used for blocks 1-2, 4-12 as needed.

13.

Signature, Date and Badge No. of Inspector.

14. Approval signature and date of ERC Level III.

15.

If SATISFACTORY, approval signature and date of Review Team Leader, if l

UNSATISFACTORY, enter N/A.

16.

If UNSATISFACTORY, signature and referral date of Review Team Leader, if SATISFACTORY, enter N/A.

l 17.

Enter Draf t and/or Rev. number of the Action Plan as applicable.

l l

)

v l

l