Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20211Q4981999-09-10010 September 1999 Proposed Tech Specs Clarifying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits & Adding Ref to Caldon TR for LEFM ML20211G3221999-08-26026 August 1999 Proposed Tech Specs 4.0.6 Re SG Surveillance Requirements ML20212H0771999-08-20020 August 1999 Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820. Page 119 in Unit 1 ASME Section XI of Incoming Submittal Not Included ML20212G0821999-08-20020 August 1999 Rev 4 to Augmented Inservice Insp Plan for Cpses,Unit 1 ML20210R7091999-08-13013 August 1999 Revised Proposed Tech Specs for LAR 98-010,proposing Rev to TS Table 3.3.1-1, Rt Sys Instrumentation & TS Table B 3.3.1-1, Rt Sys Setpoints ML20211M0041999-08-0505 August 1999 Rev 31 to Technical Requirements Manual ML20211G7401999-07-27027 July 1999 Revs 29 & 30 to Technical Requirements Manual (TRM) for Cpses,Units 1 & 2 ML20209E1861999-07-0909 July 1999 Proposed Tech Specs,Adding Reactor Core Safety Limit Figures to Section 5.6.5 of Ts,Clarifying That Overpower N-16 Setpoint Remains in TS & Reflecting NRC Approval of TRs Used to Determine Core Operating Limits Presented in COLR ML20212J4251999-06-23023 June 1999 Proposed Tech Specs,Revising EDG Start Be Emergency Start Instead of Normal Start Following Loss of Offsite Power ML20195E5401999-06-0404 June 1999 Proposed Tech Specs Pages 3.2-6,3.4-24,3.4-25,3.7-23,3.7-30, 3.8-25,3.9-9,3.9-10 & 4.0-2,provided as Addl Aditorial Changes Supplementing LAR 99-001 ML20195B6461999-05-27027 May 1999 Marked-up TS Pages Re LAR 99-004,changing Plant Battery Surveillance ML20195B6771999-05-24024 May 1999 Proposed Tech Specs Relocating Parameter Limits Allows for Available Operating & Analytical Margins to Be Used in Most Efficient Manner ML20206G7111999-05-0404 May 1999 Proposed Tech Specs Revising Surveillances Associated with Plant Battery & EDGs & Miscellaneous Editorial Corrections ML20206Q0311999-04-16016 April 1999 Rev 28 to CPSES Technical Requirements Manual ML20205Q1681999-04-14014 April 1999 Rev 27 to CPSES Technical Requirements Manual ML20207F3511999-02-25025 February 1999 Fire Endurance Test to Qualify Protective Envelope for Class IE Electrical Circuits ML20203B0011999-01-25025 January 1999 Rev 10 to Security Training & Qualification Plan ML20211C1071999-01-15015 January 1999 Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval ML20198J3171998-12-21021 December 1998 Proposed Tech Specs,Proposing Changes Administratively for Unit 1 & Increasing Licensed Power for Operation of Unit 2 to 3445 Mwt ML20198J2541998-12-18018 December 1998 Proposed Tech Specs Sections 1.0,3.1,3.3,3.4,3.6,3.7,3.9 & 5.0,converting to ITS ML20198J5211998-12-17017 December 1998 Corrected Tech Specs Pages for Section 3.8 to 971211 Submittal Re TS Conversion Application ML20197K0491998-12-11011 December 1998 Proposed Tech Specs Section 3.8, Electrical Power Systems, Converting to ITS ML20196C5361998-11-20020 November 1998 Proposed TS Converting to ITS Sections 4.0,3.4 & 3.6 ML20195F1751998-11-13013 November 1998 Proposed Tech Specs,Revising Administrative Controls Section to Include Configuration Risk Mgt Program Into CPSES TS ML20195F5291998-11-11011 November 1998 Proposed Tech Specs Revising Core Safety Limit Curves & Overtemperature N-16 Reactor Trip Setpoints for Unit 2 Cycle 5 ML20196B8811998-10-30030 October 1998 Proposed Tech Specs Section 3.3 Re Instrumentation ML20154R7861998-10-21021 October 1998 Proposed Tech Specs Section 3.7, Plant Systems ML20154S2901998-10-14014 October 1998 Proposed Tech Specs Sections 3.1,3.2,3.4,3.5 & 5.0 Re Reactivity Control Sys,Power Distribution Sys,Rcs,Eccs & Administrative Control,Respectively ML20154C9101998-10-0202 October 1998 Proposed Tech Specs 4.0.6, SG SR, Adding Definitions Required for F* Alternate Plugging Criterion & Identifies Portion of Tube Subject to Criteria ML20153E2661998-09-24024 September 1998 Proposed Improved Tech Specs Sections 3.4, RCS & 5.0, Administrative Controls ML20237E8461998-08-28028 August 1998 Proposed Tech Specs Pages Re Sections 1.0,2.0 & 3.0 of Proposed TS Changes in 980707 & s,In Response to NRC RAI ML20154C4511998-07-20020 July 1998 Interim Change Request ISI-1R5-01, Unit 1 ISI Plan,Rev 5 ML20236T9931998-07-20020 July 1998 1RF06 ISI Summary Rept First Interval,Third Period,First Outage for CPSES Unit 1, Commerical Operating Date 900830 ML20236J3131998-07-0101 July 1998 Revised Proposed Tech Specs Pages Re Safety Injection Signal & Blackout Signal ML20249C6101998-06-22022 June 1998 Proposed Tech Specs Section 3.6 Re Conversion Application ML20216B2811998-04-24024 April 1998 Rev 13 to Cpses,Units 1 & 2,IST Plan for Pumps & Valves First Interval ML20216E6291998-04-0909 April 1998 Marked-up TS Pages,Reflecting Proposed Changes in Amends to Licenses NPF-87 & NPF-89 ML20216B1471998-04-0606 April 1998 Proposed Tech Specs,Allowing Plant to Continue to Operate W/O Having to Perform Portions of SRs ML20217A3901998-03-18018 March 1998 Proposed Tech Specs Surveillance Requirements 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a) at Power Re Enforcement Discretion ML20216H1361998-03-13013 March 1998 Proposed Tech Specs Re Electrical Systems Surveillance Requirements ML20248L3191998-03-12012 March 1998 Proposed Tech Specs TS 4.8.1.1.2f.4)b) & TS 4.8.1.1.2f.6)b) Re Request for Enforcement Discretion ML20216D6021998-03-0909 March 1998 Proposed Tech Specs Temporarily Removing Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of SRs 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a),for Unit 2 Only ML20203K8621998-02-27027 February 1998 Proposed Tech Specs,Increasing RWST low-low Level Setpoint ML20203J5211998-02-25025 February 1998 Proposed Tech Specs Page to Remove Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of Surveillance Requirements 4.8.1.1.2f.4(a) & 4.8.1.1.2f.7(a) Until Plant Startup Subsequent to Next Refueling Outage ML20203J6151998-02-24024 February 1998 Rev 26 to Technical Requirements Manual ML20217P1531998-02-12012 February 1998 Rev 2 to ISI-2R2-01, Unit 2 ISI Plan ML20202B1641998-02-0505 February 1998 Proposed Tech Specs Bases 3/4.7.1.5 Re Main Steam Line Isolation Valves ML20217P2961998-01-30030 January 1998 Rev 5 to Unit 1 ISI Program Plan ML20202E5981997-11-25025 November 1997 Rev 12 to CPSES Units 1 & 2 IST Testing Plan for Pumps & Valves,First Interval ML20212C3881997-10-24024 October 1997 Proposed Tech Specs Re Revised Core Safety Limit Curves & Revised Overtemperature N-16 Reactor Trip Setpoints 1999-09-10
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20212H0771999-08-20020 August 1999 Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820. Page 119 in Unit 1 ASME Section XI of Incoming Submittal Not Included ML20212G0821999-08-20020 August 1999 Rev 4 to Augmented Inservice Insp Plan for Cpses,Unit 1 ML20211M0041999-08-0505 August 1999 Rev 31 to Technical Requirements Manual ML20211G7401999-07-27027 July 1999 Revs 29 & 30 to Technical Requirements Manual (TRM) for Cpses,Units 1 & 2 ML20206Q0311999-04-16016 April 1999 Rev 28 to CPSES Technical Requirements Manual ML20205Q1681999-04-14014 April 1999 Rev 27 to CPSES Technical Requirements Manual ML20203B0011999-01-25025 January 1999 Rev 10 to Security Training & Qualification Plan ML20211C1071999-01-15015 January 1999 Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval ML20154C4511998-07-20020 July 1998 Interim Change Request ISI-1R5-01, Unit 1 ISI Plan,Rev 5 ML20236T9931998-07-20020 July 1998 1RF06 ISI Summary Rept First Interval,Third Period,First Outage for CPSES Unit 1, Commerical Operating Date 900830 ML20216B2811998-04-24024 April 1998 Rev 13 to Cpses,Units 1 & 2,IST Plan for Pumps & Valves First Interval ML20203J6151998-02-24024 February 1998 Rev 26 to Technical Requirements Manual ML20217P1531998-02-12012 February 1998 Rev 2 to ISI-2R2-01, Unit 2 ISI Plan ML20217P2961998-01-30030 January 1998 Rev 5 to Unit 1 ISI Program Plan ML20202E5981997-11-25025 November 1997 Rev 12 to CPSES Units 1 & 2 IST Testing Plan for Pumps & Valves,First Interval ML20212E9811997-10-0606 October 1997 Rev 11 to CPSES Units 1 & 2 IST Plan for Pumps & Valves First Interval ML20210S3911997-09-0303 September 1997 Rev 10 to CPSES Units 1 & 2 Inservice Testing Plan for Pumps & Valves in First Interval ML20151L1391997-07-31031 July 1997 5 to Technical Requirements Manual, for Plant ML20141E6201997-06-26026 June 1997 Rev 24 of CPSES Units 1 & 2 Technical Requirements Manual ML20141F8471997-06-26026 June 1997 Rev 9 to IST Plan for Pumps & Valves First Interval ML20136G4361997-03-13013 March 1997 Rev 23 to CPSES Units 1 & 2 Technical Requirements Manual ML20135A8241997-02-24024 February 1997 Rev 22 to CPSES Units 1 & 2 Technical Requirements Manual ML20134C6831997-01-31031 January 1997 Rev 8 to Comanche Peak Steam Electric Station Units 1 & 2 Inservice Testing Plan for Pumps & Valves First Interval ML20134M4371996-11-13013 November 1996 Self Assessment Guide Program Guidelines ML20129A5991996-10-16016 October 1996 Rev 7 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20128G7661996-10-0202 October 1996 CPSES Unit 1 & 2 Inservice Testing Plan for Pumps & Valves First Interval ML20138B5181996-10-0101 October 1996 Rev 14 to ODCM for TU Electric CPSES Units 1 & 2 ML20117C8461996-07-19019 July 1996 Glen Rose,Tx ASME Section XI ISI Program Plan,Unit 1 - 1st Interval Rev 4 ML20217M1691996-05-24024 May 1996 Rev 3 to STA-750, Check Valve Reliability Program ML20117C6181996-05-0303 May 1996 Rev 1 to Unit 2 ISI Plan ML20117C6141996-04-14014 April 1996 Rev 1 to Unit 2 ISI Plan ML20107J0941996-04-0202 April 1996 Rev 1 to Interim Change Request ISI-2, CPSES Unit 2 ASME Section XI ISI Program Plan ML20107E4471996-02-0909 February 1996 Rev 1 of CPSES ASME XI ISI Program Plan Unit 2 ML20100B9471996-01-24024 January 1996 Rev 21 of CPSES Units 1 & 2 Technical Requirements Manual ML20086C5491995-06-30030 June 1995 Rev 20 to Technical Requirements Manual ML20091L1941995-03-29029 March 1995 Interim Change Request ISI-IR3-003, Unit 1 ISI Plan ML20081F1131995-03-12012 March 1995 Interim Change Request ISI-1R3-02 to Rev 3 to Unit 1 ISI Plan ML20080Q3351995-02-24024 February 1995 Rev 17 to CPSES Technical Requirements Manual ML20078R6371995-02-15015 February 1995 Rev 5 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20078H8501994-11-30030 November 1994 CPSES Odmc Rev Change Sheet ML20073L6591994-10-0606 October 1994 Rev 4 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20072C7081994-07-24024 July 1994 Rev 16 to Simulator Operations/Maint Instruction - 010, Simulator Certification Testing ML20069E5171994-05-17017 May 1994 Interim Change Request ISI-2RO-001, Comanche Peak Ses Unit 2 ISI Program Plan ML20029D0711994-05-11011 May 1994 Rev 16 to Technical Requirements Manual. ML20065K1721994-04-15015 April 1994 Rev 15 to CPSES Units 1 & 2 Technical Requirements Manual ML20058E3841993-11-30030 November 1993 Rev 14 to Technical Requirements Manual, Page 2-27, Clarifying Discussion in Table 2.1.1 Notations for Local Test Connections,Vent & Drain Valves & Revising List of Effective Pages EPL-1 Through EPL-4 ML20058C4441993-11-23023 November 1993 IST Plan for Pumps & Valves First Interval, Rev 3 ML20058B5791993-11-19019 November 1993 Rev 14 to Comanche Peak Steam Electric Station Technical Requirements Manual ML20058J9711993-11-19019 November 1993 Interim Change Request ISI-1R2-005 to Rev 2 to Unit 1 ISI Plan ML20056D8161993-08-11011 August 1993 Salp,Directive 8.6 1999-08-05
[Table view] |
Text
{ *-
Page 1 of 5
. s.
A._/
EVALUATION RESEARCH CORPORATION COMANCHE PEAK RESPONSE TEAM QUALITY INSTRUCTION FOR ISSUE-SPECIFIC ACTION PLAN VII.b.3 C
INSTRUCTION NO.: QI-037 REVISION: 1 1FFECTIVE DATE: 3/21/86 coman,IO.yp_C
' ^
OL
< s, REINSPECTION OF PIPE SUPPORTS TRT ISSUES-PIPE SUPPORTS IN ROOM 77N, SAFEGUARDS BLDG., UNIT 1 Prepared by: 4[d, .h Date: '3 -/ 7 - 86 Issue Coordinator Approved by: Date: 3 - 2 a - 8M iia'rdware Supervisor Approved by: , [. [ /6d(/tz Date: 2 !cb/[f f, On-Site QA Represen tive
/ Approved by: itu Date: 3 / /8d,
/ /
~
QA/Qy Reti'ew 'feam Leader
/
'./
8607170100 860711 1 PDR ADOCK 05000445 A PDR
f *.
QI-037 Rev. 1 1.0 PURPOSE To provide the methods and requirements for the visual reinspection of pipe supports by the QA/QC Inspection Team for the purpose of verifying the validity of deficiencies identified by the Technical Review Team (TRT).
2.0 APPLICABILITY This procedure is applicable to the pipe supports identified in population items list "TRT Issues-Pipe Supports In Room 77N, Safeguard Building Unit 1."
3.0 REFERENCES
3.1 Memo QA/QC-RT-1664 to M. Obert delineating documentation used in the development of this procedure including specific sources for attributes.
3.2 CPP-009. " Performance of Reinspection and Documentation Reviews."
4.0 CENERAL 4.1 Responsibilities A. QA/QC Discipline Engineers The QA/QC Discipline Engineers prepare the inspection procedure delineating reinspection requirements and attributes.
B. QA/QC Inspectors QA/QC Inspectors perform reinspection / verification in accordance with Ref. 3.2 and thfs inspection procedure.
The results shall be documented on checklist (Attachment 6.4).
4.2 Policy Activities performed under this procedure shall conform to the policies contained in the latest Comanche Peak Response Team Program Plan and Issue-Specific Action Plan (s).
G 2
. ~ _ _ _ _ _ . _
+ .
OI-037 Rev. 1 5.0 INSTRUCTION
(}
NOTES: 1. The inspector shall indicate the inspection tools used (and serial number / calibration date when applicable) tar filling in the Attachment 6.5. The tool codes required by Attachment 6.5 are listed on Attachment 6.6.
I.
- 2. Additional space is provided on Attachment 6.7 for supplemental remarks.
5.1 Support Identification 5.1.1 Verify that the support is permanently marked with the
.; (1) support mark number. Identification may have been accomplished by die stamping, vibro etching or nameplate securely fastened to support structure.
5.1 2 Verify that the installed support components, mark (1) number and configuration are the same as shown on the design drawings (DWG) or component modification card (CMC). Detail dimensional checks are not a requirement for support identification purposes, however, they may be checked to the extent necessary to identify the support.
() 5.2 Pipe Clamp Halves Parallel d
5.2.1 Verify that pipe clamps halves are parallel. For ,
(2) acceptance criteria see Attachment 6.1.
5.2.2 Measure and record the dimensions shown on Attachment l (2) 6.1.
3 5.3 Spherical Bearing Gap 5.3.1 Verify bracket / pipe clamp has installed bearing (3) spacers. It is acceptable to have one spacer.
Record the number of spacers on each side of the spherical bearing on Attachment 6.2.
5.3.2 Verify that the resultant gap (see Attachment 6.2)
(3) between the spherical bearing and the bracket or clamp is less than the thickness of the thinnest installed spacer. Record the resultant gap to the nearest 1/32 inch on Attachment 6.2.
, 5.3.3* If there is more than one size spacer or if the spacer thickness is not as shown on Attachment 6.2, record the nominal thickness of each installed spacer to the i nearest 1/32 inch on Attachment 6.2.
O
\~~/
- NOTE: This is not an accept / reject criteria.
3 3
QI-037 Rev. 1 5.0 INSTRUCTION (Cont'd)
[a~ )
5.4 Snubber Adapter Plate Bolt Thread Engagement Length 5.4.1 Verify minimum thread engagement of bolting in adapter 1
(4) plate. Snubber sizes 1/4 and 1/2 are inaccessible for this inspection. When.these sizes are encountered, enter N/A on the reinspection checklist and note the snubber size in remarks. Acceptance criteria is as follows:
Snubber Size 1 3 10 35 100 Thread Engagement 5/16" 5/16" 9/16" N/A N/A 5.4.2 Record the nominal thickness of the snubber adapter plate, nominal bolt diameter and depth of bolt recess for each recessed bolt as shown on Attachment 6.3.
5.5 Pin and Bolt Locking Devices *
- NOTE: The pins, bolts, and studs to be inspected for locking devices are shown on Attachment 6.8.
5.5.1 Verify that cotter pins and snap rings are in place l
(5) (see Attachment 6.8).
O Verify that the cotter pins are the r?sximum size the
!] 5.5.2 (5) hole will accommodate and are fully opened.
5.5.3 Verify that the load bolts are provided with (5) locking devices (see Attachment 6.8).
Verify all other threaded fasteners, except SA-193 and SA-325 Bolting Materials and Hilti Bolts, are provided with locking devices as shown in the design drawing.
. When not specified on DWG/ CMC the locking device will be one of the following:
l lock nuts l jam nuts drilled and wired nuts upset threads. Record the distance from the top of the nut to the upset thread in the remarks column of the checklist. At least
' two thread cross sections should be deformed f
in at least two places approximately 180* l t
apart.
(
U) 4 l
. . . . _ . . _ . - . . - . ~. _ . . . . - .-. - - - . . .. - -
QI-037 Rev. 1 6.0 ATTACHMENTS 6.1 Pipe Clamp Halves Parallelism 6.2 Spherical Bearing Gap-Sway Struts and Snubbers 6.3 Snubber Adapter Plate Bolt Thread Engagement Length 6.4 Inspection Checklist 6.5 Inspector Tools Used 6.6 Inspection Tools and Codes
- 6.7 Supplemental Remarks 6.8 Pins and Bolts / Studs
'O l
4
)
l I
i l
O 5
i
. .,-- --,,-._--,_,--w w., _ w.-. .-,e.,- --m.-.- - - . - - - _ . - . - ~ . - - . - - - - - _ _ , - _ _
- Attachment 6.1 QI-037 Rev. 1
(
/N Page 1 of I COMANCHE PEAK REVIEW TEAM INSPECTION CHECKLIST VERIFICATION PACKAGE NO. I-S-PS7N HANGER MARK NO./ DRAWING NO.
PIPE CLAMP HALVES PARALLELISM ENTER ALL DIMENSIONS TO NEAREST 1/32", IN INCHES 1 2 3 S1 S2 A S1 and S2 dimensions are taken at opposite sides of the clamp.
l "S" dimensions on the same side of the clamp at points 1, 2 and 3 shall
' be within 1/16" of each other to be acceptable. Also, the clamp shall i
be not more than 1/16" out of parallel from side to side' at points 1, 2 I and 3 to be acceptable.
(M Ceutt8 88 unc Pm) (AT tw o os c.ta w e)
! (a mana w cour)-- i 7 ,
6/EEOf CAMA
^
\
( ,
r1 n, l I f \ ,, ..
r1 f
l a + : :- o i
/ H f wW j LJ A . L L ln (/
T 3w l
I Inspector Date
__ -. __ _ _ _ _ _ _ , , , _ _ _ _ _ . _ . _ _ _ _ . _ _ _ _ _ _ _ ~ - _ _ _ _
O Attachmtnt 6.2 QI-037 Rev. 1 Page 1 of 3 CN h COMANCHE PEAK REVIEW TEAM INSPECTOR CHECKLIST VERIFICATION PACKAGE NO. I-S-PS7N HANGER MARK NO./ DRAWING NO.
SNUBBER / STRUT SERIAL NO.
SPHERICAL BEARING GAP - SWAY STRUTS AND SNUBBERS
-$ FORWARD BRACKET / PIPE CLAMP AND BEARING 6,'--* e NM4 SPACER NUMBER OF SPACERS INSTALLED ON MN NOMINAL EACH SIDE OF SPHERICAL BEARING THICU ESS SIDE G1 SIDE G2
/
X.'/
\ Il b lX.
Q -
x>y-
-\
sm.
N' )\ [ RESULTANT GAP =
\\\\ ,I G1 + G2 = RESULTANT GAP BRAcke 7' OR PIPE CL M P l
O Date Inspector
Attachm2nt 6.2 QI-037 Rev. I fm
('j' COM/.4CHE PEAK REVIEW TEAM INSPECTOR CHECKLIST VERIFICATION PACKAGE NO. I-S-PS7N HANGER MARK NO./ DRAWING NO.
SNUBBER / STRUT SERIAL NO.
SPHERICAL BEARING GAP - SWAY STRUTS AND SNUBBERS
- ~k REAR BRACKET / PIPE CLAMP AND BEARING dy e SPACER NUMBER OF SPACERS INSTALLED ON NNA NOMINAL EACH SIDE OF SPHERICAL BEARING NI THICKNESS SIDE G1 SIDE G2
/
7:
5 I 5 C) \ I~l
(./ 1
\i SNEA p b A.I- x
\ RESULTANT GAP =
\\\\K G1 + G2 = RESULTANT GAP l
l BRAC#2 7" 08 PIPE CLAP 1P 1
I Inspector Date l
l 2 i
! - - - - - ~ _ . - - _ . . __ _ _ _ _ _ _ _ _ _ _ _ , _ _ , _ _ _ _ _ , _ _ _ _ _ _
Attachmint 6.2 QI-037 Rev. 1 COMANCHE PEAK REVIEW TEAM INSPECTOR CHECKLIST VERIFICATION PACKAGE NO.
HANGER MARK NO./ DRAWING NO.
SPHERICAL BEARING GAP - SWAY STRUTS AND SNUBBERS
- 1 SPACER THICKNESSES XRB SIZE
- SPACER THICKNESS EACH 06 1/8" 08 1/16" 10 3/32" 12/14 3/32" 20 11/32" 24 5/16" 36 13/32" SPC PIPE CLAMP SIZE
- SPACER THICKNESS EACH 06 5/32" 08 3/32" 10 1/8" O- 12/14 20 3/16" 3/8" 24 3/8" 36 1/4"
lO l
3
.Attcchmsnt 6.3 01-037 Rev. 1 Page 1 of I d COMANCHE PEAK REVIEW TEAM INSPECTION CHECKLIST VERIFICATION PACKAGE NO.
HANGER MARK NO./ DRAWING NO.
SNUBBER SERIAL NO.
SNUBBER ADAPTER PLATE BOLT THREAD ENGAGEMENT LENGTH BOLT tp - nominal thickness g
dg r \g J of snubber adapter plate.
~
6 D - nominal bolt A n diameter.
7 a - depth of recess 7 b O' /
/
cNUBBER s
/ /hj f-
\ gpAggg SNv80ER
. ADAPTER PLATE
! BOLT tp Dt dt 1
l 2
3 4
l lO Inspector Date 1
Attatchment 6.4
.. QI-037 Rev. 1 p) t
%/
Ir.JPECTION CHECKLIST Page 1 of 1 COMANCRE FEAK RESPOWSE TEAM CIECILIST rarmnou ogsc m m cA n og pgg yo, FIFE SCFFORTS t t-PS TN FACE 1 0F j QUAL m INSTRUCTION Qt-031 Oizt=5'<cTto= 0 entT t EWLEEFI MTAG 30. l DOCUMENTATION RETID' O cut! :
O coo=
VER m CATION ACCEPT REJECT DATE 1 Identification 2 Fipe Cleep Relvee Perellel 3 fpherteel Bearias Cap 4 Snubber Adapter Flate
' Bolt Thread Engagement Length 5 Fin & Solt/ Stud Locking Device PREFARED BY: AFFa0TED BYs DISCIPLINE ENGR. DATE LEAD DISC!FLINE 00GR. DATE imarswaas EY: A,ravisu BT:
6 m :s.vu GATE LT.AD IN57Tmt SATE
~
as7I*M7.1A. lavi$ca J . . ..
t
. . =___ . . _ _ . . _ _ _ -. . - . . - . - - . - _
Attachm2nt 6.5
. y1-037 Rev. 1
$ INSPECTION TOOLS USED VERIFICATION PACKAGE NO. I-S-PS7N HANGER MARK NO./ DRAWING NO.
.i ATTRIBUTE TOOL CODE (s) SER #/CALIB DUE DATE
't
]
- 1. Identification
- 2. Pipe Clamp Halves Parallel
- 3. Spherical Bearing Cap
- 4. Snubber Adapter Plate Bolt Thread Engagement Length
- 5. Pin and Bolt / Stud Locking Device j INSPECTOR DATE l
?
O
Attachment 6.6 QI-037 Rev. 1 Page 1 of 1
-I INSPECTION TOOL AND CODES
)
CODE TOOL AF ANGLE FINDER BL BUBBLE LEVEL BS BOROSCOPE BW 1/32", 1/16", 3/32", 1/8" MIRE CG CONTOUR GAGE DF DRY FILM THICKNESS GAGE FG FEELER GAGES FL FLASHLIGHT
- FM FIBRE METAL FILLET GAGES GG GAL FILLET GAGES HL HI-LOW CAGE MG MAGNIFYING GLASS
[
MI MICROMETERS MM MIRROR MN MAGNET PB PLLH BOB PR PROTRACTOR SC SLIDE CALIPER SR 6" RULE ST STEEL TAPE MEASURE TG TAPER GAGE TW TORQUE WRENCH UD UNDERCUT GAGE (DIAL)
- UP UNDERCUT GAGE (PIT)
VC VERNIER CALIPER VT INSPECTION l
,,,nm. , - - - . - , - , , , , - . , , - . - , , , , - ,- , - , , - - - - . _ , , - , - , - , - , - > - -
Attachasnt 6.7 QI-037 Rev. 1 SUPPLEMENTAL REMARKS i
VERIFICATION PACKAGE NO.
HANGER MARK MO./ DRAWING NO.
ATTRIBUTE (NO./ DESCRIPTION) REMARKS
- O J
l
.i i
a t
1
'l lO
-w--g,s---~e,-p, a m aw ,m,w.,--m--,--,m-s,,,w,em we-w wwmw -w.,, g-. e, n,, ., ,-m.--w_ ,me em ,w
}- .
Attacheent 6.8 QI-037 Rev. 1 PINS AND BOLTS / STUDS e-n >\
! LOAD Bol-T/STup/ PIN
_L BOLTl STUD
/
) 18~~'
N uff0RT S O
SUPPORT p STRUCTURAL MGmBGP.
g
~ g LOAD SoCTl STUD / PIN
< ..i./
v -, .
4 -
2
-4 f
f \ Pipe l ICicmp
\J <;
N socr/smg O
. -__ _ _. - _ _ _ _ _ . . _ _