From: Bajada E, Hansel J
EVALUATION RESEARCH CORP.
To:
Shared Package
ML20202J051 List: ... further results
References
QI-037, QI-37, NUDOCS 8607170100
Download: ML20202J540 (15)


Text

{ *-

Page 1 of 5

. s.

A._/

EVALUATION RESEARCH CORPORATION COMANCHE PEAK RESPONSE TEAM QUALITY INSTRUCTION FOR ISSUE-SPECIFIC ACTION PLAN VII.b.3 C

INSTRUCTION NO.: QI-037 REVISION: 1 1FFECTIVE DATE: 3/21/86 coman,IO.yp_C

' ^

OL

< s, REINSPECTION OF PIPE SUPPORTS TRT ISSUES-PIPE SUPPORTS IN ROOM 77N, SAFEGUARDS BLDG., UNIT 1 Prepared by: 4[d, .h Date: '3 -/ 7 - 86 Issue Coordinator Approved by: Date: 3 - 2 a - 8M iia'rdware Supervisor Approved by: , [. [ /6d(/tz Date: 2 !cb/[f f, On-Site QA Represen tive

/ Approved by: itu Date: 3 / /8d,

/ /

~

QA/Qy Reti'ew 'feam Leader

/

'./

8607170100 860711 1 PDR ADOCK 05000445 A PDR

f *.

QI-037 Rev. 1 1.0 PURPOSE To provide the methods and requirements for the visual reinspection of pipe supports by the QA/QC Inspection Team for the purpose of verifying the validity of deficiencies identified by the Technical Review Team (TRT).

2.0 APPLICABILITY This procedure is applicable to the pipe supports identified in population items list "TRT Issues-Pipe Supports In Room 77N, Safeguard Building Unit 1."

3.0 REFERENCES

3.1 Memo QA/QC-RT-1664 to M. Obert delineating documentation used in the development of this procedure including specific sources for attributes.

3.2 CPP-009. " Performance of Reinspection and Documentation Reviews."

4.0 CENERAL 4.1 Responsibilities A. QA/QC Discipline Engineers The QA/QC Discipline Engineers prepare the inspection procedure delineating reinspection requirements and attributes.

B. QA/QC Inspectors QA/QC Inspectors perform reinspection / verification in accordance with Ref. 3.2 and thfs inspection procedure.

The results shall be documented on checklist (Attachment 6.4).

4.2 Policy Activities performed under this procedure shall conform to the policies contained in the latest Comanche Peak Response Team Program Plan and Issue-Specific Action Plan (s).

G 2

. ~ _ _ _ _ _ . _

+ .

OI-037 Rev. 1 5.0 INSTRUCTION

(}

NOTES: 1. The inspector shall indicate the inspection tools used (and serial number / calibration date when applicable) tar filling in the Attachment 6.5. The tool codes required by Attachment 6.5 are listed on Attachment 6.6.

I.

2. Additional space is provided on Attachment 6.7 for supplemental remarks.

5.1 Support Identification 5.1.1 Verify that the support is permanently marked with the

.; (1) support mark number. Identification may have been accomplished by die stamping, vibro etching or nameplate securely fastened to support structure.

5.1 2 Verify that the installed support components, mark (1) number and configuration are the same as shown on the design drawings (DWG) or component modification card (CMC). Detail dimensional checks are not a requirement for support identification purposes, however, they may be checked to the extent necessary to identify the support.

() 5.2 Pipe Clamp Halves Parallel d

5.2.1 Verify that pipe clamps halves are parallel. For ,

(2) acceptance criteria see Attachment 6.1.

5.2.2 Measure and record the dimensions shown on Attachment l (2) 6.1.

3 5.3 Spherical Bearing Gap 5.3.1 Verify bracket / pipe clamp has installed bearing (3) spacers. It is acceptable to have one spacer.

Record the number of spacers on each side of the spherical bearing on Attachment 6.2.

5.3.2 Verify that the resultant gap (see Attachment 6.2)

(3) between the spherical bearing and the bracket or clamp is less than the thickness of the thinnest installed spacer. Record the resultant gap to the nearest 1/32 inch on Attachment 6.2.

, 5.3.3* If there is more than one size spacer or if the spacer thickness is not as shown on Attachment 6.2, record the nominal thickness of each installed spacer to the i nearest 1/32 inch on Attachment 6.2.

O

\~~/

  • NOTE: This is not an accept / reject criteria.

3 3

QI-037 Rev. 1 5.0 INSTRUCTION (Cont'd)

[a~ )

5.4 Snubber Adapter Plate Bolt Thread Engagement Length 5.4.1 Verify minimum thread engagement of bolting in adapter 1

(4) plate. Snubber sizes 1/4 and 1/2 are inaccessible for this inspection. When.these sizes are encountered, enter N/A on the reinspection checklist and note the snubber size in remarks. Acceptance criteria is as follows:

Snubber Size 1 3 10 35 100 Thread Engagement 5/16" 5/16" 9/16" N/A N/A 5.4.2 Record the nominal thickness of the snubber adapter plate, nominal bolt diameter and depth of bolt recess for each recessed bolt as shown on Attachment 6.3.

5.5 Pin and Bolt Locking Devices *

  • NOTE: The pins, bolts, and studs to be inspected for locking devices are shown on Attachment 6.8.

5.5.1 Verify that cotter pins and snap rings are in place l

(5) (see Attachment 6.8).

O Verify that the cotter pins are the r?sximum size the

!] 5.5.2 (5) hole will accommodate and are fully opened.

5.5.3 Verify that the load bolts are provided with (5) locking devices (see Attachment 6.8).

Verify all other threaded fasteners, except SA-193 and SA-325 Bolting Materials and Hilti Bolts, are provided with locking devices as shown in the design drawing.

. When not specified on DWG/ CMC the locking device will be one of the following:

l lock nuts l jam nuts drilled and wired nuts upset threads. Record the distance from the top of the nut to the upset thread in the remarks column of the checklist. At least

' two thread cross sections should be deformed f

in at least two places approximately 180* l t

apart.

(

U) 4 l

. . . . _ . . _ . - . . - . ~. _ . . . . - .-. - - - . . .. - -

QI-037 Rev. 1 6.0 ATTACHMENTS 6.1 Pipe Clamp Halves Parallelism 6.2 Spherical Bearing Gap-Sway Struts and Snubbers 6.3 Snubber Adapter Plate Bolt Thread Engagement Length 6.4 Inspection Checklist 6.5 Inspector Tools Used 6.6 Inspection Tools and Codes

6.7 Supplemental Remarks 6.8 Pins and Bolts / Studs

'O l

4

)

l I

i l

O 5

i

. .,-- --,,-._--,_,--w w., _ w.-. .-,e.,- --m.-.- - - . - - - _ . - . - ~ . - - . - - - - - _ _ , - _ _

  • Attachment 6.1 QI-037 Rev. 1

(

/N Page 1 of I COMANCHE PEAK REVIEW TEAM INSPECTION CHECKLIST VERIFICATION PACKAGE NO. I-S-PS7N HANGER MARK NO./ DRAWING NO.

PIPE CLAMP HALVES PARALLELISM ENTER ALL DIMENSIONS TO NEAREST 1/32", IN INCHES 1 2 3 S1 S2 A S1 and S2 dimensions are taken at opposite sides of the clamp.

  • Comments:

l "S" dimensions on the same side of the clamp at points 1, 2 and 3 shall

' be within 1/16" of each other to be acceptable. Also, the clamp shall i

be not more than 1/16" out of parallel from side to side' at points 1, 2 I and 3 to be acceptable.

(M Ceutt8 88 unc Pm) (AT tw o os c.ta w e)

! (a mana w cour)-- i 7 ,

6/EEOf CAMA

^

\

( ,

r1 n, l I f \ ,, ..

r1 f

l a +  : :- o i

/ H f wW j LJ A . L L ln (/

T 3w l

I Inspector Date

__ -. __ _ _ _ _ _ _ , , , _ _ _ _ _ . _ . _ _ _ _ . _ _ _ _ _ _ _ ~ - _ _ _ _

O Attachmtnt 6.2 QI-037 Rev. 1 Page 1 of 3 CN h COMANCHE PEAK REVIEW TEAM INSPECTOR CHECKLIST VERIFICATION PACKAGE NO. I-S-PS7N HANGER MARK NO./ DRAWING NO.

SNUBBER / STRUT SERIAL NO.

SPHERICAL BEARING GAP - SWAY STRUTS AND SNUBBERS

-$ FORWARD BRACKET / PIPE CLAMP AND BEARING 6,'--* e NM4 SPACER NUMBER OF SPACERS INSTALLED ON MN NOMINAL EACH SIDE OF SPHERICAL BEARING THICU ESS SIDE G1 SIDE G2

/

X.'/

\ Il b lX.

Q -

x>y-

-\

sm.

N' )\ [ RESULTANT GAP =

\\\\ ,I G1 + G2 = RESULTANT GAP BRAcke 7' OR PIPE CL M P l

O Date Inspector

Attachm2nt 6.2 QI-037 Rev. I fm

('j' COM/.4CHE PEAK REVIEW TEAM INSPECTOR CHECKLIST VERIFICATION PACKAGE NO. I-S-PS7N HANGER MARK NO./ DRAWING NO.

SNUBBER / STRUT SERIAL NO.

SPHERICAL BEARING GAP - SWAY STRUTS AND SNUBBERS

  • ~k REAR BRACKET / PIPE CLAMP AND BEARING dy e SPACER NUMBER OF SPACERS INSTALLED ON NNA NOMINAL EACH SIDE OF SPHERICAL BEARING NI THICKNESS SIDE G1 SIDE G2

/

7:

5 I 5 C) \ I~l

(./ 1

\i SNEA p b A.I- x

\ RESULTANT GAP =

\\\\K G1 + G2 = RESULTANT GAP l

l BRAC#2 7" 08 PIPE CLAP 1P 1

I Inspector Date l

l 2 i

! - - - - - ~ _ . - - _ . . __ _ _ _ _ _ _ _ _ _ _ _ , _ _ , _ _ _ _ _ , _ _ _ _ _ _

Attachmint 6.2 QI-037 Rev. 1 COMANCHE PEAK REVIEW TEAM INSPECTOR CHECKLIST VERIFICATION PACKAGE NO.

HANGER MARK NO./ DRAWING NO.

SPHERICAL BEARING GAP - SWAY STRUTS AND SNUBBERS

  1. 1 SPACER THICKNESSES XRB SIZE
  • SPACER THICKNESS EACH 06 1/8" 08 1/16" 10 3/32" 12/14 3/32" 20 11/32" 24 5/16" 36 13/32" SPC PIPE CLAMP SIZE
  • SPACER THICKNESS EACH 06 5/32" 08 3/32" 10 1/8" O- 12/14 20 3/16" 3/8" 24 3/8" 36 1/4"
  • Nocinal Dimensions I

lO l

3

.Attcchmsnt 6.3 01-037 Rev. 1 Page 1 of I d COMANCHE PEAK REVIEW TEAM INSPECTION CHECKLIST VERIFICATION PACKAGE NO.

HANGER MARK NO./ DRAWING NO.

SNUBBER SERIAL NO.

SNUBBER ADAPTER PLATE BOLT THREAD ENGAGEMENT LENGTH BOLT tp - nominal thickness g

dg r \g J of snubber adapter plate.

~

6 D - nominal bolt A n diameter.

7 a - depth of recess 7 b O' /

/

cNUBBER s

/ /hj f-

\ gpAggg SNv80ER

. ADAPTER PLATE

! BOLT tp Dt dt 1

l 2

3 4

l lO Inspector Date 1

Attatchment 6.4

.. QI-037 Rev. 1 p) t

%/

Ir.JPECTION CHECKLIST Page 1 of 1 COMANCRE FEAK RESPOWSE TEAM CIECILIST rarmnou ogsc m m cA n og pgg yo, FIFE SCFFORTS t t-PS TN FACE 1 0F j QUAL m INSTRUCTION Qt-031 Oizt=5'<cTto= 0 entT t EWLEEFI MTAG 30. l DOCUMENTATION RETID' O cut! :

O coo=

VER m CATION ACCEPT REJECT DATE 1 Identification 2 Fipe Cleep Relvee Perellel 3 fpherteel Bearias Cap 4 Snubber Adapter Flate

' Bolt Thread Engagement Length 5 Fin & Solt/ Stud Locking Device PREFARED BY: AFFa0TED BYs DISCIPLINE ENGR. DATE LEAD DISC!FLINE 00GR. DATE imarswaas EY: A,ravisu BT:

6 m :s.vu GATE LT.AD IN57Tmt SATE

~

as7I*M7.1A. lavi$ca J . . ..

t

. . =___ . . _ _ . . _ _ _ -. . - . . - . - - . - _

Attachm2nt 6.5

. y1-037 Rev. 1

$ INSPECTION TOOLS USED VERIFICATION PACKAGE NO. I-S-PS7N HANGER MARK NO./ DRAWING NO.

.i ATTRIBUTE TOOL CODE (s) SER #/CALIB DUE DATE

't

]

1. Identification
2. Pipe Clamp Halves Parallel
3. Spherical Bearing Cap
4. Snubber Adapter Plate Bolt Thread Engagement Length
5. Pin and Bolt / Stud Locking Device j INSPECTOR DATE l

?

O

Attachment 6.6 QI-037 Rev. 1 Page 1 of 1

-I INSPECTION TOOL AND CODES

)

CODE TOOL AF ANGLE FINDER BL BUBBLE LEVEL BS BOROSCOPE BW 1/32", 1/16", 3/32", 1/8" MIRE CG CONTOUR GAGE DF DRY FILM THICKNESS GAGE FG FEELER GAGES FL FLASHLIGHT

FM FIBRE METAL FILLET GAGES GG GAL FILLET GAGES HL HI-LOW CAGE MG MAGNIFYING GLASS

[

MI MICROMETERS MM MIRROR MN MAGNET PB PLLH BOB PR PROTRACTOR SC SLIDE CALIPER SR 6" RULE ST STEEL TAPE MEASURE TG TAPER GAGE TW TORQUE WRENCH UD UNDERCUT GAGE (DIAL)

UP UNDERCUT GAGE (PIT)

VC VERNIER CALIPER VT INSPECTION l

,,,nm. , - - - . - , - , , , , - . , , - . - , , , , - ,- , - , , - - - - . _ , , - , - , - , - , - > - -

Attachasnt 6.7 QI-037 Rev. 1 SUPPLEMENTAL REMARKS i

VERIFICATION PACKAGE NO.

HANGER MARK MO./ DRAWING NO.

ATTRIBUTE (NO./ DESCRIPTION) REMARKS

O J

l

.i i

a t

1

'l lO

-w--g,s---~e,-p, a m aw ,m,w.,--m--,--,m-s,,,w,em we-w wwmw -w.,, g-. e, n,, ., ,-m.--w_ ,me em ,w

}- .

Attacheent 6.8 QI-037 Rev. 1 PINS AND BOLTS / STUDS e-n >\

! LOAD Bol-T/STup/ PIN

_L BOLTl STUD

/

) 18~~'

N uff0RT S O

SUPPORT p STRUCTURAL MGmBGP.

g

~ g LOAD SoCTl STUD / PIN

< ..i./

v -, .

4 -

2

-4 f

f \ Pipe l ICicmp

\J <;

N socr/smg O

. -__ _ _. - _ _ _ _ _ . . _ _