Forwards Exemption & Application for Amend to License NPF-1, Deleting Security Plan Requirements of 10CFR50.54(p) & Part 73 for Plant After Spent Nuclear Fuel Is Moved to Proposed ISFSI Area.W/Certificate of Svc
ML20199J548
Person / Time
Site: Trojan  File:Portland General Electric icon.png
Issue date: 01/29/1998
From: Quennoz S
PORTLAND GENERAL ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20199J554 List:
References
VPN-007-98, VPN-7-98, NUDOCS 9802050339
Download: ML20199J548 (4)


Text

. _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ - _ _ _ _ _ ______ _ _ _ _ _ --

Portland Gener:I Electsic One World Trade Center i21 SW Salmon Street Portland. OR 97204 January 29,1998 VPN-007-98 Trojan Nuclear Plant Docket 50-344,72-017 License NPF-1 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Exemption Request and License Cha Le Annlication (LCAT 243- Deletion of Security Requirements from Part 50 License after Fuel Movement to the ISFSI This letter transmits an Exemption Request, pursuant to 10 CFR 50.12, and LCA 243 which requests amendment of Facility Operating (Possession Only) License No. NPF-1 and the Trojan Tecimical Specifications This Exemption Request and LCA delete the Security Plan requirements of 10 CFR Part 50.54(p) and Part 73 for the Trojan Plant aller the spent nuclear fuel is moved to the proposed Independent Spent Fuel Storage Installation (ISFSI) area.

The deletion of Security requirements is to be concurrent with the completion of the movement of fuel to the 10 CFR 72 licensed area at the Trojan site. The Security requirements for the ISFSI area have been approved by the NRC Staff, by letter dated November 20,1996. The Exemption Request and License Amendment reflect the reduced potential for radiological sabotage or diversion of strategic nuclear materials after the spent nuclear fuel is removed from the Part 50 licensed area of the Trojan Plant.

These proposed actions are predicated on the receipt of a Part 72 License for the Trojan ISFSI, movement of the fuel to the ISFSI and the approval by the NRC Staff of License Change Application (LCA) 242 LCA 242 will authorize the removal of the ISFSI area from the Part 50 License. Approval of the ISFSI Part 72 license and the deletion of the ISFSI area from the Part 50 license will permit the timely decommissioning and termination of the Part 50 license for the balance of the Trojan site, consistent with the NRC approved Decommissioning Plan.

9002050339 900129 I PDR ADOCK 05000344

%/ PDR {p j g  ;

Natural gas. Electricity. Endless possibilities.

VPN-007-98 January 29,1998 -'

Page 2 of 2 Attachment I providus the background and reason for the proposed change, a description of the proposed change, and a no significant hazards consideration determination. Attachment 11 provides a copy of the affected License page and Technical Specification page with changes annotated.

Also attached is one signed copy of a C rtificate of Service for LCA 243 to the Chief Executive of the County'in which the facility is located and to the Director of the. Oregon Office of Energy.

Sincerely, Q C ===

Stephen M. Quennoz Trojan Site Executive Attachments .

c: M. T. Masnik, NRC, NRR D. G. Reid, NRC, NMSS R. A. Scarano, NRC Region IV David Stewart-Smith, OOE A. Bless, OOE

....._..._J

. STATE OF OREGON, ')

,/ ..' )

)

COUNTY OF COLUMBIA )

l 4 i

i 1, S. M. Quennoz, beina duly sworn, subscribe to and say that I am the Trojan Sits Executive, for Portland General Elcetric Company, the licensee herein; that I have full authority to execute this oath; that I have reviewed the foregoing; and that to the best of my knowledge, information, and belief the statements made in it are true.

Date _ /- A9 ,1998 W-^O = - tj _

S. M. Quennoz, ,

Trojan Site Executive Portland General Electric Company On this day personally appeared before me, S. M. Quennoz; to me known to be the individual who executed the foregoing instrument, and acknowledged that he signed the same as his free -

act.

GIVEN under my hand and seal this Ah day of Ml/112AXJ ,1998.

G' 0FFICLAL SEAL

~~/J[

9 g%g%c'.F,En COMMISSONNO 045755 MY CENSSm OMSJULG 1999 NotMEc in a State of Ore i th'e Residing at / l My commission expires %M49 s

UNITED STATES OF AMERICA

.f .l NUCLEAR REGULATORY COMMISSION in the Matter of . )

)

PORTLAND GENERAL ELECTRIC COMPANY ) Docket 50-344 THE CITY _OF EUGENE, OREGON, AND ) Operating License NPF-1 PACIFIC POWER & LIGHT COMPANY )

-(TROJAN NUCLEAR PLANT) )

CER flFICATE OF SERVICE I liereby certify that copies of License Change Application 243 to the Operating License for the Trojan Nuclear Plant, dated January 29,1998, have been served on the following by hand delivery or by deposit in the United States Mail, first class, this 29th day of January 1998:

State of Oregon Attn: David Stewart-Smith Oregon Office of Energy 625 Marion Street NE Salem, Oregon 97310 Chairman of County Commissioners Columbia County Courthouse St. Helens, Oregon 97051 e7 H. I(. Pate Manager, Licensing, Compliance, and Commitment Management On this day personally appeared before me H. R. Pate, to me known to be the individual who executed the foregoing instrument, and acknowledged that signed the same as his free act.

. GIVEN under my hand and seal this 29th day of January,1 8.

hY omsm Nota %c'In an t le State of Oregon eN u<CO PAT SCHAFFRAN NOTARY Pb8LOOREGON

$YE1999 Residing at Mhl/fz2 My commishn expires '7 -M-99

.