ML20199J580
| ML20199J580 | |
| Person / Time | |
|---|---|
| Site: | Trojan File:Portland General Electric icon.png |
| Issue date: | 01/29/1998 |
| From: | PORTLAND GENERAL ELECTRIC CO. |
| To: | |
| Shared Package | |
| ML20199J554 | List: |
| References | |
| NUDOCS 9802050347 | |
| Download: ML20199J580 (2) | |
Text
_ _ _ _ _ _ _. _ _ _ _ _ _ - - _ _ _ _ _ _ _ _ _
Prot.69ures, Programs, and Manuals 5.1 e
4 5.0 ADNINISTRATIVE CONTROLS 5.7 Procedures, Progrrms, and Manuals
)
- 5. 7.1 P_t2. tid.ur_iLi 5.7.1.1 Scope Written procedures shall be established, implementud, and maintained covering the following activities:
The precedures app 11 cabin to the safe storage of irradiated a.
(
fuel recomunended in Regulatory Guide 1.33, Revirion 2, Appendix A, February 1978; uwMann)I Defueled secuM+,y ca.1ekocLple i:plrztatteej b.
Defueled emergency plan implementatien; c.
d.
Quality assurance for radiological offluent and environment.nl monitoring; e.
Fire protection program implementution; and t.
All programs specified in Specification 5.7.2.
5.7.1.2 Review and Approval Each procedure of Specification 5.7.1.1, and changes thereto, shall be independently reviewed in accordance with established attainistrative procedures and approved by tha Plant General a
Manager or his designee prior to implementation, f
q 5.7.1.3
_ Temporary Changes Temporary changes to procedures of Specification 5.7.1.1 may be made provided:
r a.
The intent of the existing procedure is not altered; b.
The change is approved by a member of the facility Management staff and by a CERTIFIED FUEL HANDLER; and 9602030347 900129 PDR ADOCK 05000344 W
PDR (continued)
TROJAN UNIT 1 S-15
-R ENOM Wi NO. 105 t
l Procedurcs, Progrcms, and M:nuka 5.7 3
l5.0. ADMINISTRATIVE CONTROLS 5.7 Procedures, Programs, and Manuals 5.7.1 Procedures 5.7.1.1 Scope Written procedures shall be established, implemented, and maintained -
l covedng the following activities:
j a.
The procedures applicable to the safe otorage of irradiated fuel recommended in Regulatory Guide 1.33, Revision 2, Appendix A, February 1978; b.
(Intentionally deleted) l 4
c.
Defueled emergency plan implementation; d.
Quality assurance for radiological effluent and environmental monitoring; e.
F!re protection program implementation; and f.
All programs specified in Specification 5.7.2.
5.7.1.2 Review and Approval Each procedure of Specification 5.7.1.1, and changes thereto, shall be independently reviewed in accordance with established administrative procedures and approved by the Plant General Manager or his designee prior to implementation.
5.7.1.3 Temporary Changes Temporary changes to procedures of Specification 5.7.1.1 may be made
. provided:
a.
The intent of the existing procedure is not altered; b,
The change is approved by a member of the facility management staff and by a CERTIFIED FUEL HANDLER; and I
C (continued)
TROJAN UNIT 1 5-15 l
-