ML20198H545

From kanterella
Jump to navigation Jump to search
Forwards NRC Observer Team Roster for Indian Point 2 full- Participation Exercise.Site Access Training & Badging Scheduled for 860603 & Exit Meeting Scheduled for 860605
ML20198H545
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 05/16/1986
From: Harpster T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Liebler G
CONSOLIDATED EDISON CO. OF NEW YORK, INC.
References
NUDOCS 8605300485
Download: ML20198H545 (2)


Text

- . .. . ..- -- -_ _- - - -. . -- - _ _ _ _

4 e

gg 1G N y l Docket No. 50-247 Consolidated Edison Company of New York, Inc.

! Indian Point Station, Unit No. 2 ATTN: Mr. George Liebler

Emergency Preparedness Group i Broadway and Bleakley Avenues Buchanan, New York 10511 i

Dear Mr. Liebler:

r

/

Thank you for working and cooperating with the staff of this section while we prepared for the June full-participation exercise. The NRC observation team roster is attached.

The required time for site access training and badging has been scheduled for the morning of Tuesday, June 3, prior to Consolidated Edison's controller-observer briefing. Our exit meeting is scheduled to begin at 1:30 p.m., Thursday, June 5 in the location you suggested - the Simulator Building conference room.

Please call Charles Amato (215-337-5394) if you have any questions, problems or comments.

Sincerely, Orfs%2 ci , g v..,

^

Terry L. Harpster, Chief Emergency Preparedness Section i Division of Radiation Safety I and Safeguards

Enclosure:

As stated bec: D. J. Vito j 8605300485 860516 i- PDR ADOCK 05000247' e F PDR -

~.

l )

' l RI:DRSS '

l Amato//y/P H ps.er ..

l 5/rf/86 5/<(486 i

1 0FFICIAL RECORD COPY

} )

Enclosure NRC 05servor Team Roster IP-2 Full-Participation Exercise Location Team Member Control Room Gary Weale, PNL TSC Larry Rossback, SRI, IP-2 OSC/ Accountability Darrell Fisher, PNL E0F Ed Podolak, NRC, HQ E0F Charles Amatol , NRC, RI On-site Team John Davis, PNL Off-site Team Joseph Stephen, PNL JNC David Vito 2, NRC, RI NRC RAC Observer James Hawxhurst, NRC, RI Notes: PNL Battelle Pacific Northwest Laboratory 1 - Team Leader - general observer 2 - Senior Inspector - general observer 1

0FFICIAL RECORD COPY

--+>ww

=m,,- ,

=--+ - = 9