FEB 121987 Docket No. 50-286 Power Authority of the State of New York Indian Point 3 Nuclear Power Plant ATTN:
Mr. William Josiger Resident Manager P. O. Box 215 Buchanan, New York 10511 Gentlemen:
Subject:
RECEIPT OF REQUESTED INFORMATION In a letter dated January 9, 1987 from Mr. Ray, of your staff, to Mr. Dudley, of our staff, the information requested at a November 14, 1986 meeting was provided. The information was sufficient to clarify the differences between the Indian Point Unit 3 Main Control Room and the Indian Point Unit 2 Simulator.
Thank you for the information. No reply to this letter is required.
Sincerely, OriginalSi A iE7%
Robert M. Gallo, Chief Reactor Projects Branch No. 2 Division of Reactor Projects I
cc:
R. Tansky, Training Superintendent Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector State of New York l
OFFICIAL RECORD COPY r
8702240393 870212 PDR ADOCK 05000206 P
\\b 5EOl
e Power Authority of the State of New York bec:
Region I Docket Room'(with concurrences)
N. Dudley OL File.
L. MO Utt0'-!\\.
7,' LIMVILtd P. trol 7k1 i
hAf f
RI:DRP RI:D RI P
N diey/nd RK r
_ Livvawe R Gallo 02/8[/87 02
/87 02A0 /87 p
Y l'
OFFICIAL RECORD COPY
!