MONTHYEARML20217L0421999-10-21021 October 1999 Forwards Insp Rept 50-382/99-20 on 990815-0925 & Notice of Violation.Two Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20217N2111999-10-19019 October 1999 Forwards Insp Rept 50-382/99-14 on 990913-17 & 1004-08.No Violations Noted.Licensed Operator Requalification Program, Effective,Utilized Systems Approach to Training & Showed Continued Improvements Over Previous Insp Findings ML20217L0101999-10-18018 October 1999 Provides Update of Waterford 3 Effort for Review of Ufsar. Info Listed Includes Background Mgt Expectations,Review Status & Results,Clarifications Re Review & Conclusions ML20217L0141999-10-18018 October 1999 Submits Update to NRC Staff Re Circumstances & Plans for Submitting Certification Rept on Waterford 3 Plant Specific Simulator ML20217G7051999-10-14014 October 1999 Forwards Comments on Four of NRC RO Examination Questions for Exam Administered During Week of 991004 05000382/LER-1999-014, Forwards LER 99-014-00,providing Details of Reactor Shutdown Due to Loss of RCP Controlled bleed-off Flow.Attached Commitment Identification/Voluntary Enhancement Form Identifies All Commitments Contained in Submittal1999-10-12012 October 1999 Forwards LER 99-014-00,providing Details of Reactor Shutdown Due to Loss of RCP Controlled bleed-off Flow.Attached Commitment Identification/Voluntary Enhancement Form Identifies All Commitments Contained in Submittal ML20217D5151999-10-0707 October 1999 Forwards Application for Renewal of SRO License for C Fugate License SOP-43039-3,IAW 10CFR55.57.Without Encls ML20217C6251999-10-0505 October 1999 Informs That NRC Reviewed Util Ltr & Encl Exercise Scenario Package for Waterford 3 Emergency Plan Exercise Scheduled for 991013.Based on Review,Nrc Determined That Exercise Appropriate to Meet Objectives ML20212J6921999-09-29029 September 1999 Forwards Insp Rept 50-382/99-18 on 990830-0902.One Noncited Violation Identified Re Failure to Follow Procedural Instructions to Ensure That Members on Fire Brigade Shift Were Qualified ML20216G2441999-09-27027 September 1999 Forwards Insp Rept 50-382/99-19 on 990830-0903.No Violations Noted 05000382/LER-1999-013, Forwards LER 99-013-00,providing Details of Exceeding TS Limits for RCS Cooldown Rates.All Commitments Contained in Submittal Are Identified on Encl Commitment Identification/ Voluntary Enhancement Form1999-09-23023 September 1999 Forwards LER 99-013-00,providing Details of Exceeding TS Limits for RCS Cooldown Rates.All Commitments Contained in Submittal Are Identified on Encl Commitment Identification/ Voluntary Enhancement Form IR 05000382/19993011999-09-21021 September 1999 Informs That NRC License Exam Previously Associated with NRC Insp Rept 50-382/99-301 Will Be Incorporated Into NRC Insp Rept 50-382/99-14 ML20212D8761999-09-16016 September 1999 Informs That on 990818,NRC Staff Completed Midcycle PPR of Waterford 3.During Assessment Period,Number of Personnel Errors Occurred,Which Demonstrated Lack of Attention to Detail by Plant Personnel.Historical Listing of Issues,Encl ML20212C2471999-09-16016 September 1999 Forwards Five Final Applications for RO Licenses for G Esquival,Jm Hearn,Md Lawson,Re Simpson & PI Wood.Written Exam & Operating Test to Be Administered,Is Requested. Encls Withheld ML20212C2391999-09-16016 September 1999 Requests Cancellation of SRO Licenses for Bn Coble,License SOP-43835,due to Job Assignment Location & CA Rodgers, License SOP-43537-1,due to Resignation from Company, Effective 990901 ML20212C5881999-09-14014 September 1999 Forwards Insp Rept 50-382/99-15 on 990719-23 with Continuing in Ofc Insp Until 0819.No Violations Noted ML20211Q4421999-09-0909 September 1999 Forwards Insp Rept 50-382/99-07 on 990601-11.Three Violations Being Treated as Noncited Violations ML20211P4121999-09-0707 September 1999 Requests NRC Staff Review & Approval of Integrated Nuclear Security Plan (Insp) & Integrated Security Training & Qualification Plan (Ist&Q), for Use by All Entergy Operations,Inc.Encl Withheld,Per 10CFR2.790(d) ML20211M8391999-09-0303 September 1999 Forwards Revised Epips,Including Rev 25 to EP-001-020,rev 24 to EP-001-030,rev 25 to EP-001-040,rev 30 to EP-002-100,rev 22 to EP-001-010,rev 27 to EP-002-010,rev 26 to EP-002-102 & Rev 16 to EP-002-190.Listed Proprietary Revs to Epips,Encl ML20211L3681999-09-0202 September 1999 Forwards Five Preliminary Applications for Reactor Operator Licenses for Individuals Listed,Iaw 10CFR55.31.Encls Withheld ML20211K9741999-09-0101 September 1999 Forwards Insp Rept 50-382/99-16 on 990704-0814.Two Severity Level IV Violations Identified & Being Treated as Noncited Violations,Consistent with App C of Enforcement Policy 05000382/LER-1999-011, Forwards LER 99-011-00,providing Details of Reactor Shutdown Due to Loss of Controlled bleed-off Flow.All Commitments Contained in Submittal Identified on Attached Commitment Identification/Voluntary Enhancement Form1999-08-31031 August 1999 Forwards LER 99-011-00,providing Details of Reactor Shutdown Due to Loss of Controlled bleed-off Flow.All Commitments Contained in Submittal Identified on Attached Commitment Identification/Voluntary Enhancement Form ML20211M3641999-08-30030 August 1999 Forwards Written Examination,Operating Tests & Supporting Ref Matl Identified in Attachment 2 of ES-210,in Response to NRC .Encl Withheld ML20211G5751999-08-27027 August 1999 Forwards RAI Re IPEEE Submittal.Please Provide RAI within 60 Days of Receipt of Ltr,Per Util Response to GL 88-20,suppl 4 ML20211E3281999-08-26026 August 1999 Forwards fitness-for-duty Performance Data for Period of 990101-0630,IAW 10CFR26.71(d).Ltr Does Not Contain Commitments 05000382/LER-1999-009, Forwards LER 99-009-00 Re Discovery of Condition of Noncompliance with App R Involving Inadequate Separation of Essential Cables Routed in Fire Area RAB-30 in Rab. Compensatory Measures Were Established Immediately1999-08-26026 August 1999 Forwards LER 99-009-00 Re Discovery of Condition of Noncompliance with App R Involving Inadequate Separation of Essential Cables Routed in Fire Area RAB-30 in Rab. Compensatory Measures Were Established Immediately 05000382/LER-1999-010, Forwards LER 99-010-00,providing Details of Inadequate Pumping Capacity in Dry Cooling Tower Area.All Commitments Contained in Submittal Are Identified on Attached Commitment Identification Voluntary Enhancement Form1999-08-26026 August 1999 Forwards LER 99-010-00,providing Details of Inadequate Pumping Capacity in Dry Cooling Tower Area.All Commitments Contained in Submittal Are Identified on Attached Commitment Identification Voluntary Enhancement Form ML20211F5421999-08-24024 August 1999 Forwards Proposed marked-up TS Page Xviii, Index Administrative Controls, Correcting Page Number Re TS Change Request NPF-38-220.Editorial Changes for TS Change NPF-38-221 Discussed ML20211F3561999-08-24024 August 1999 Forwards CTS Pages & TS Proposed marked-up Pages for Insertion Into TS Change Request NPF-38-207 Re Efas, Originally Submitted on 980702.Original NSHC Determination Continues to Be Applicable ML20211F4611999-08-24024 August 1999 Informs That NRC Reviewed Ltr & Encl Objectives for Waterford 3 Emergency Plan Exercise Scheduled for 991013.Exercise Objectives Appropriate to Meet Emergency Plan Requirements ML20211G1731999-08-23023 August 1999 Informs That Info Submitted in ,B&W Rept 51-1234900-00,will Be Withheld from Public Disclosure,Per 10CFR2.790 ML20211C5101999-08-19019 August 1999 Forwards Certified Copies of Liability Insurance Policy Endorsements Issued in First Half of 1999 for Each Entergy Operations,Inc Nuclear Unit,Per 10CFR140.15 ML20210T9791999-08-18018 August 1999 Discusses Which Responded to Reconsideration of Violation Denial (EA 98-022) Enforcement Action Detailed in .Concludes That Violation Occurred as Stated ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210S0561999-08-12012 August 1999 Submits Voluntary Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for NRC Fys 2000 & 2001 for Waterford 3 ML20210Q6161999-08-12012 August 1999 Forwards Corrected Copy of Monthly Operating Rept for July 1999 for Waterford 3.Original Rept,Submitted with ,Contained Typos ML20217F2661999-08-12012 August 1999 Forwards Copy of 1999 Waterford 3 Biennial Exercise Package to Be Performed Using Waterford 3 CR Simulator ML20210R9231999-08-11011 August 1999 Forwards Insp Rept 50-382/99-10 on 990719-23.Violations Noted.Nrc Has Determined That One Severity Level IV Violation of NRC Requirements Occurred ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams 05000382/LER-1999-008, Forwards LER 99-008-00,re Failure to Perform Testing of ESF Filtration Units Per TS Srs.Commitments Made by Util Also Encl1999-07-29029 July 1999 Forwards LER 99-008-00,re Failure to Perform Testing of ESF Filtration Units Per TS Srs.Commitments Made by Util Also Encl ML20210H4291999-07-29029 July 1999 Forwards Response to NRC Rai,Associated with TS Change Request NPF-38-208,proposing to Replace Ref to Supplement 1 with Ref to Supplement 2 of Calculative Methods for CE Small Break LOCA Evaluation Model, in ACs Section of TSs ML20210F9451999-07-27027 July 1999 Forwards Proprietary & non-proprietary Version of Rev 29 to EPIP EP-002-100, Technical Support Ctr Activation,Operation & Deactivation. Proprietary Info Withheld,Per 10CFR2.790 ML20210D3171999-07-23023 July 1999 Submits Proposal for Final Resolution of Reracking Spent Fuel Pool at Plant,Per License Amend 144,issued by NRC in .No New Commitments Are Contained in Ltr 05000382/LER-1999-007, Forwards LER 99-007-00,providing Details of Operation Outside Tornado Missile Protection Licensing Basis for turbine-driven Emergency Feedwater Pump Exhaust Stack & Steam Supply Piping.All Commitments Identified on Attached1999-07-23023 July 1999 Forwards LER 99-007-00,providing Details of Operation Outside Tornado Missile Protection Licensing Basis for turbine-driven Emergency Feedwater Pump Exhaust Stack & Steam Supply Piping.All Commitments Identified on Attached ML20210D8701999-07-23023 July 1999 Forwards Safety Evaluation Re First 10-yr Interval Inservice Insp Plan Requests for Relief ISI-018 Through ISI-020 for Entergy Operations,Inc,Unit 3 ML20210B1521999-07-15015 July 1999 Forwards Insp Rept 50-382/99-13 on 990523-0703.Three Violations Being Treated as Noncited Violations ML20209G9771999-07-13013 July 1999 Forwards Objectives & Guidelines for Waterford 3 Emergency Preparedness Exercise Scheduled for 991013.List of Objectives cross-referenced Where Applicable to Relevant Sections of NUREG-0654 IR 05000382/19990081999-07-12012 July 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-382/99-08 Issued on 990503 ML20209E5231999-07-0909 July 1999 Informs That as Result of NRC Review of Util Responses to GL-92-01,rev 1 & Suppl 1,staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2.This Closes Staff Efforts Re TAC MA0583 ML20209D4051999-07-0707 July 1999 Forwards Revised TS Pages to Replace Attachment C,Entirely in Original TS Change Request NPF-38-207,per 990519 Discussion with C Patel of Nrc.Changes to Action 20 Delete Word Requirement & Revise Word Modes to Mode 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217L0101999-10-18018 October 1999 Provides Update of Waterford 3 Effort for Review of Ufsar. Info Listed Includes Background Mgt Expectations,Review Status & Results,Clarifications Re Review & Conclusions ML20217L0141999-10-18018 October 1999 Submits Update to NRC Staff Re Circumstances & Plans for Submitting Certification Rept on Waterford 3 Plant Specific Simulator ML20217G7051999-10-14014 October 1999 Forwards Comments on Four of NRC RO Examination Questions for Exam Administered During Week of 991004 05000382/LER-1999-014, Forwards LER 99-014-00,providing Details of Reactor Shutdown Due to Loss of RCP Controlled bleed-off Flow.Attached Commitment Identification/Voluntary Enhancement Form Identifies All Commitments Contained in Submittal1999-10-12012 October 1999 Forwards LER 99-014-00,providing Details of Reactor Shutdown Due to Loss of RCP Controlled bleed-off Flow.Attached Commitment Identification/Voluntary Enhancement Form Identifies All Commitments Contained in Submittal ML20217D5151999-10-0707 October 1999 Forwards Application for Renewal of SRO License for C Fugate License SOP-43039-3,IAW 10CFR55.57.Without Encls 05000382/LER-1999-013, Forwards LER 99-013-00,providing Details of Exceeding TS Limits for RCS Cooldown Rates.All Commitments Contained in Submittal Are Identified on Encl Commitment Identification/ Voluntary Enhancement Form1999-09-23023 September 1999 Forwards LER 99-013-00,providing Details of Exceeding TS Limits for RCS Cooldown Rates.All Commitments Contained in Submittal Are Identified on Encl Commitment Identification/ Voluntary Enhancement Form ML20212C2391999-09-16016 September 1999 Requests Cancellation of SRO Licenses for Bn Coble,License SOP-43835,due to Job Assignment Location & CA Rodgers, License SOP-43537-1,due to Resignation from Company, Effective 990901 ML20212C2471999-09-16016 September 1999 Forwards Five Final Applications for RO Licenses for G Esquival,Jm Hearn,Md Lawson,Re Simpson & PI Wood.Written Exam & Operating Test to Be Administered,Is Requested. Encls Withheld ML20211P4121999-09-0707 September 1999 Requests NRC Staff Review & Approval of Integrated Nuclear Security Plan (Insp) & Integrated Security Training & Qualification Plan (Ist&Q), for Use by All Entergy Operations,Inc.Encl Withheld,Per 10CFR2.790(d) ML20211M8391999-09-0303 September 1999 Forwards Revised Epips,Including Rev 25 to EP-001-020,rev 24 to EP-001-030,rev 25 to EP-001-040,rev 30 to EP-002-100,rev 22 to EP-001-010,rev 27 to EP-002-010,rev 26 to EP-002-102 & Rev 16 to EP-002-190.Listed Proprietary Revs to Epips,Encl ML20211L3681999-09-0202 September 1999 Forwards Five Preliminary Applications for Reactor Operator Licenses for Individuals Listed,Iaw 10CFR55.31.Encls Withheld 05000382/LER-1999-011, Forwards LER 99-011-00,providing Details of Reactor Shutdown Due to Loss of Controlled bleed-off Flow.All Commitments Contained in Submittal Identified on Attached Commitment Identification/Voluntary Enhancement Form1999-08-31031 August 1999 Forwards LER 99-011-00,providing Details of Reactor Shutdown Due to Loss of Controlled bleed-off Flow.All Commitments Contained in Submittal Identified on Attached Commitment Identification/Voluntary Enhancement Form ML20211M3641999-08-30030 August 1999 Forwards Written Examination,Operating Tests & Supporting Ref Matl Identified in Attachment 2 of ES-210,in Response to NRC .Encl Withheld ML20211E3281999-08-26026 August 1999 Forwards fitness-for-duty Performance Data for Period of 990101-0630,IAW 10CFR26.71(d).Ltr Does Not Contain Commitments 05000382/LER-1999-010, Forwards LER 99-010-00,providing Details of Inadequate Pumping Capacity in Dry Cooling Tower Area.All Commitments Contained in Submittal Are Identified on Attached Commitment Identification Voluntary Enhancement Form1999-08-26026 August 1999 Forwards LER 99-010-00,providing Details of Inadequate Pumping Capacity in Dry Cooling Tower Area.All Commitments Contained in Submittal Are Identified on Attached Commitment Identification Voluntary Enhancement Form 05000382/LER-1999-009, Forwards LER 99-009-00 Re Discovery of Condition of Noncompliance with App R Involving Inadequate Separation of Essential Cables Routed in Fire Area RAB-30 in Rab. Compensatory Measures Were Established Immediately1999-08-26026 August 1999 Forwards LER 99-009-00 Re Discovery of Condition of Noncompliance with App R Involving Inadequate Separation of Essential Cables Routed in Fire Area RAB-30 in Rab. Compensatory Measures Were Established Immediately ML20211F3561999-08-24024 August 1999 Forwards CTS Pages & TS Proposed marked-up Pages for Insertion Into TS Change Request NPF-38-207 Re Efas, Originally Submitted on 980702.Original NSHC Determination Continues to Be Applicable ML20211F5421999-08-24024 August 1999 Forwards Proposed marked-up TS Page Xviii, Index Administrative Controls, Correcting Page Number Re TS Change Request NPF-38-220.Editorial Changes for TS Change NPF-38-221 Discussed ML20211C5101999-08-19019 August 1999 Forwards Certified Copies of Liability Insurance Policy Endorsements Issued in First Half of 1999 for Each Entergy Operations,Inc Nuclear Unit,Per 10CFR140.15 ML20210Q6161999-08-12012 August 1999 Forwards Corrected Copy of Monthly Operating Rept for July 1999 for Waterford 3.Original Rept,Submitted with ,Contained Typos ML20210S0561999-08-12012 August 1999 Submits Voluntary Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for NRC Fys 2000 & 2001 for Waterford 3 ML20217F2661999-08-12012 August 1999 Forwards Copy of 1999 Waterford 3 Biennial Exercise Package to Be Performed Using Waterford 3 CR Simulator 05000382/LER-1999-008, Forwards LER 99-008-00,re Failure to Perform Testing of ESF Filtration Units Per TS Srs.Commitments Made by Util Also Encl1999-07-29029 July 1999 Forwards LER 99-008-00,re Failure to Perform Testing of ESF Filtration Units Per TS Srs.Commitments Made by Util Also Encl ML20210H4291999-07-29029 July 1999 Forwards Response to NRC Rai,Associated with TS Change Request NPF-38-208,proposing to Replace Ref to Supplement 1 with Ref to Supplement 2 of Calculative Methods for CE Small Break LOCA Evaluation Model, in ACs Section of TSs ML20210F9451999-07-27027 July 1999 Forwards Proprietary & non-proprietary Version of Rev 29 to EPIP EP-002-100, Technical Support Ctr Activation,Operation & Deactivation. Proprietary Info Withheld,Per 10CFR2.790 ML20210D3171999-07-23023 July 1999 Submits Proposal for Final Resolution of Reracking Spent Fuel Pool at Plant,Per License Amend 144,issued by NRC in .No New Commitments Are Contained in Ltr 05000382/LER-1999-007, Forwards LER 99-007-00,providing Details of Operation Outside Tornado Missile Protection Licensing Basis for turbine-driven Emergency Feedwater Pump Exhaust Stack & Steam Supply Piping.All Commitments Identified on Attached1999-07-23023 July 1999 Forwards LER 99-007-00,providing Details of Operation Outside Tornado Missile Protection Licensing Basis for turbine-driven Emergency Feedwater Pump Exhaust Stack & Steam Supply Piping.All Commitments Identified on Attached ML20209G9771999-07-13013 July 1999 Forwards Objectives & Guidelines for Waterford 3 Emergency Preparedness Exercise Scheduled for 991013.List of Objectives cross-referenced Where Applicable to Relevant Sections of NUREG-0654 ML20209D4051999-07-0707 July 1999 Forwards Revised TS Pages to Replace Attachment C,Entirely in Original TS Change Request NPF-38-207,per 990519 Discussion with C Patel of Nrc.Changes to Action 20 Delete Word Requirement & Revise Word Modes to Mode ML20209B6081999-06-30030 June 1999 Submits Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Disclosure Encl 05000382/LER-1999-005, Forwards LER 99-005-00,providing Details of Discovery of Untested Electrical Contacts in safety-related Logic Circuits1999-06-24024 June 1999 Forwards LER 99-005-00,providing Details of Discovery of Untested Electrical Contacts in safety-related Logic Circuits ML20196G5731999-06-24024 June 1999 Forwards Operator Licensing Exam Outlines Associated with Exam Scheduled for Wk of 991004.Exam Development Is Being Performed in Accordance with NUREG-1021,Rev 8 ML20212J4121999-06-23023 June 1999 Responds to NRC Re Reconsideration of EA 98-022. Details Provided on Actions Util Has Taken or Plans to Take to Address NRC Concerns with Ability to Demonstrate Adequate Flow Availability to Meet Design Requirements ML20196E9371999-06-22022 June 1999 Forwards Revs Made to EP Training Procedures.Procedures NTC-217 & NTC-217 Have Been Deleted.Procedure NTP-203 Was Revised to Combine Requirement Previously Included in Procedures NRC-216 & NTC-217 ML20196A1021999-06-17017 June 1999 Provides Supplemental Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, Per 990513 Request of NRC Project Manager ML20195F3671999-06-0909 June 1999 Forwards Rev 21,Change 0 to EP-001-010, Unusual Event. Rev Reviewed in Accordance with 10CFR50.54(q) Requirements & Determined Not to Decrease Effectiveness of Emergency Plan ML20195C7801999-06-0303 June 1999 Submits Response to Violations Noted in Insp Rept 50-382/99-08.Corrective Actions:All Licensee Access Authorization Personnel Were Retrained Prior to Completion of Insp ML20195C2951999-05-28028 May 1999 Forwards Annual Evaluation of Changes & Errors Identified in Abb CE ECCS Performance Evaluation Models Used for LOCA Analyses.Results of Annual Evaluation for CY98 Detailed in Attached Rept,Based Upon Suppl 10 to Abb CE Rept ML20195C0241999-05-28028 May 1999 Notifies NRC of Operator Medical Condition for Waterford 3 Opertaor Sp Wolfe,License SOP-43723.Attached NRC Form & Memo Contain Info Concerning Condition.Without Encls ML20196L3281999-05-24024 May 1999 Informs That Entergy Is Withdrawing TS Change Request NPF-38-205 Re TS 3.3.3.7.1, Chlorine Detection Sys & TS 3.3.3.7.3, Broad Range Gas Detection Submitted on 980629 ML20206S4691999-05-17017 May 1999 Requests Waiver of Exam for SRO Licenses for an Vest & Hj Lewis,Iaw 10CFR55.47.Both Individuals Have Held Licenses at Plant within Past Two Year Period,But Licenses Expired Upon Leaving Util Employment.Encl Withheld 05000382/LER-1999-004, Forwards LER 99-004-00 Re Discovery That Response Time Testing Had Not Been Performed for ESFAS Containment Cooling Function,As Required by TS SR 4.3.2.31999-05-14014 May 1999 Forwards LER 99-004-00 Re Discovery That Response Time Testing Had Not Been Performed for ESFAS Containment Cooling Function,As Required by TS SR 4.3.2.3 ML20206N1921999-05-10010 May 1999 Provides Revised Attachment 2 for Alternative Request IWE-02,originally Submitted 990429 Re Bolt Torque or Tension Testing of Class Mc pressure-retaining Bolting as Specified in Item 8.20 of Article IWE-2500,Table IWE-2500-1 ML20206J1471999-05-0606 May 1999 Requests That Implementation Date for TS Change Request NPF-38-211 Be within 90 Days of Approval to Allow for Installation of New Monitoring Sys for Broad Range Gas Detection Sys ML20206J1721999-05-0606 May 1999 Notifies That Proposed Schedule for Plant 1999 Annual Exercise Is Wk of 991013.Exercise Objective Meeting Scheduled for 990513 at St John Baptist Parish Emergency Operations Ctr ML20206G8021999-05-0404 May 1999 Provides Revised Response to NRC Re Violations Noted in Insp Rept 50-382/99-01.Licensee Denies Violation as Stated.Change Made Is Denoted by Rev Bar & Does Not Materially Impact Original Ltr ML20206E7811999-04-29029 April 1999 Proposes Alternatives to Requirements of ASME B&PV Code Section XI,1992 Edition,1992 Addenda,As Listed.Approval of Alternative Request on or Before 990915,requested ML20205T2531999-04-22022 April 1999 Forwards LER 99-S02-00,describing Occurrence of Contract Employee Inappropriately Being Granted Unescorted Access to Plant Protected Area ML20205R2611999-04-20020 April 1999 Forwards Rev 19 to Physical Security Plan,Submitted in Accordance with 10CFR50.54(p).Plan Rev Was Approved & Implemented on 990407.Rev Withheld,Per 10CFR73.21 ML20205Q3241999-04-16016 April 1999 Submits Addl Info Re TS Change Request NPF-38-215 for Administrative Controls TS Changes.Appropriate Pages from New Entergy Common QA Program Manual Provided as Attachment to Ltr 1999-09-07
[Table view] |
Text
.
e g- Ente gy por:ti:nt, Inc.
Killona. LA 700G6 Tel 504 739 6242 ames J. Fisicaro l Na0s"E5?' l W3F1-96-0210 A4.05 PR December 26,1996 ,
i U.S. Nuclear Regulatory Commission l ATTN: Document Control Desk )
Washington, D.C. 20555
Subject:
Waterford 3 SES Docket No. 50-382 License No. NPF-38 NRC Inspection Report 50-382/96-24 Reply to Notice of Violation Gentlemen: .
In accordance with 10CFR2.201, Entergy Operations, Inc. hereby submits in !
Attachment 1 the response to the violations identified in Enclosure 1 of the subject inspection Report.
Waterford 3 agrees with the NRC's assessment that the two examples of the first violation indicate a less than rigorous resolution of identified deficiencies in a timely manner. We believe the timeliness and thoroughness of our response was not typical of Waterford 3 expectations and performance.
With regards to the second violation, we have performed a critical examination of the inspection report and related NRC correspondence, held numerous discussions with other utilities, and challenged our position repeatedly. As a result, we still believe that our testing methodology for CC-134A(B) and CC-135A(B) is in compliance with !
all ASME section XI requirements and 10CFR50.55a(g). Additional details are provided in Attachment 1.
9612300117 961226 DR ADOCK 0500g2 /hf
{ '[
300005
NRC Inspection Report 96-24 Reply to Notice of Violation W3F1-96-0210 Page 2 December 26,1996 If you have any questions concerning this response, please contact Tim Gaudet at (504) 739-6666.
Very truly yours,
~
df hf J.J. Fisicaro I Director !
Nuclear Safety JJF/WDM/tjs Attachment i
l cc: L.J. Callan (NRC Region IV), C.P. Patel (NRC-NRR), l R.B. McGehee, N.S. Reynolds, NRC Resident !.1spectors Office L
i i
I
Attachm:nt to W3F1-96-0210 Prg31 of 7 ATTACHMENT 1 ENTERGY OPERATIONS. INC. RESPONSE TO THE VIOLATION IDENTIFIED IN ENCLOSURE 1 OF INSPECTION REPORT 50-382/96-24 VIOLATION NO. 9624-01 10 CFR Part 50, Appendix B, Criterion XVI, requires, in part, that conditions adverse to quality be promptly identified and corrected.
Procedure OP-901-511, " Instrument Air Malfunction," Attachment 5, Note 1, requires that accumulators for Valves CC.135A(B), Dry Cooling Tower A(3) Inlet Isolation Valve, have pre-staged motive cylinders (nitrogen bottle) to allow a backup air source to be connected to the accumulators on a loss of instrument air.
Contrary to the above, conditions adverse to quality were not promptly identified and corrected in that:
- 1. As of October 22,1996, the licensee failed to determine all of the potential water usage sources from the Condensate Storage Pool (CSP) following a design basis tornado event, as required by Condition Report (CR) 96-0086, dated January 22, 1996.
- 2. From October 14-21,1996, the licensee did not implement immediate corrective !
actions specified in CR 96-1603 by prestaging a nitrogen cylinder for valve CC- 1 1358, as required in procedure OP-901-511.
This is a Severity Level IV violation (Supplement 1) (50-382/9624-01).
l
RESPONSE
(1) Reason for the Violation (Example 1)
Entergy believes that the root cause of this condition is that design documents are inadequate for the design basis tornado accident.' Contributing causes were personnel error, poor verification and testing techniques, and inadequate procedures and instructions.
Design basis document W3-DBD-003, Emergency Feedwater (EFW), states that the Component Cooling Water (CCW) Makeup Pumps will require a minimal amount of CSP volume following any design basis accident. An existing calculation which stated that the CCW Surge Tank would require 116 gallons of makeup from the CSP following a design basis tornado event was overlooked in calculation MN(Q)-9-17 and therefore, subsequently in the W4.101 evaluation performed for CR 96-0086. Weaknesses were discovered in procedural guidance to direct engineering personnel in determining if other J
I Attachm::nt to '
W3F1-96-0210
}
Pags 2 of 7 i i
- i' information exists that would affect calculations being performed or to pursue in what documents ;
- j. (i.e., procedures, other calculations, etc.) information obtained from !
calculations should be placed. :
t -(2) Corrective Steos That Have Been Taken and the Results Achieved i i !
e- Upon discovery, calculations were performed to include the additional j makeup requirements. Based on Technical Specification (TS) minimum levels, the WCT and CSP contain 344,000 gallons of water. During the first l 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of the design basis tomado event, a total of 343,976 gallons of water j j would be needed for EFW consumption, Ultimate Heat Sink (UHS) :
3 consumption, and CCW Surge Tank makeup. Based on these numbers, the l'
- WCT and CSP provided a 24 gsllon margin. This margin, however, was
! based on the DCT outlet isolation valves, CC-181 A(B) and CC-135A(B),
j being leak tight. Since these valves had not been leak tested, an assumed ,
leakage of 5 gpm per valve was made. Recommendations were made to the :
{ Control Room to maintain CSP level greater than 92% to provide added i volume. Operations management directed the Control Room staff to maintain
- L CSP level greater than 96%.
With CSP level at 96%, the available margin for the tornado event, not j j considering seat leakage thiough the Dry Cooling Tower (DCT) inlet isolation !
j valves, CC-135A(B), discharge check valves, CC-181 A(B), and bundle l
) isolation valves, is 10.555 gallons. Assuming a combined leak rate of 10 gpm j for CC-135A(B) and CC-181 A(B) for the initial two hours prior to isolation of [
the damaged bundles, the remaining margin is 9,355 gallons. The combined '
~ leakage to the damaged bundles through the bundle isolation valves for the i
- remaining 22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br /> could not exceed 7 gpm. The DCT bundle inlet and outlet
! isolation valves were used as isolations during two maintenance activities j (Work Authorization (WA) #'s 01142260 & 01144162) with no appreciable
! leakage.
\ ,
j Testing produced the following results:
4
- CC-181 A/CC-135A 0.04 gpm l CC-1818/CC-135B 0.008 gpm i
i (3) Corrective Steos Which Will Be Taken to Avoid Further Violations i
- e Research sil licensing and design documents pertaining to the design basis tornado event. Detail the design basis tomado event similar to
- j. Calculation MN(Q)-9-3 that details the LOCA event. Revise design i documents and issue a Licensing Document Change Request (LDCR)
L to clarify the FSAR if required. Determine leakage criteria for valves
' required to be leak tight during a design basis tornado event. The IST j Program will be updated with these results. ECD, July 31,1997.
4
- _ - _. . - _ m. .
Att: chm:nt to W3F1-96-0210 !
4 Ng3 3 of 7 )
. Develop a design basis for CCW Makeup following design basis accident. Revise DBD-003, Emergency Feedwater, and update Calculation EC-191-003 with results. ECD, March 31,1997.
. The WCT cross-connect line will be tested during RF8 to ensure make-up capability from one basin to another (corrective action from CR 96-0086). ECD, July 31,1997.
1
. Revise Calculation MN(Q)-9-17 to take into account the CCW makeup
, from the CSP, ECD, July 31,1997.
. Revise NOECP-011, Performance of Calculations, to strengthen the !
design input and verification process for calculations. ECD, January I 31,1997. .
4 i . Add DCT bundle isolation valves, CC-137A(B)/CC-179A(B), CC- !
141 A(B)/CC-175A(B), CC-139A(B)/CC-177A(B), CC-143A(B)/CC- '
173A(B) and the CCW Makeup Pumps to the IST Plan to ensure these components will be able to perform their specific function during a
- design basis tornado event. ECD, January 31,1997.
(4) Date When Full Compliance Will Be Achieved l
Waterford 3 is in full compliance in that all potential water usage sources ,
during a design basis tornado accident have been identified. Estimated completion dates are provided, above, for corrective actions aimed at reducing the potential for future violations. Those corrective actions will be completed by July 31,1997.
3 (1) Reason for Violation (Example 2)
The cause for the second cited condition in this violation is personnel error.
incorrect assumptions, inadequate follow-up of task status, lack of task ownership, and inadequate communications between Operations and System Engineering led to the temporary nitrogen bottle not being staged. l A Condition Report (CR) was written on 10/14/96 when it was discovered that a temporary nitrogen bottle was not staged for CC-134B and CC-135B as directed by Operations Off-Normal Procedure OP-901-511, " Instrument Air Malfunction." The nitrogen bottles are staged locally for the A and B train CCW DCT isolation and bypass valves to minimize shift effort in the event of an instrument air malfunction after normal working hours. This requirement is administrative in nature. There is no design or aafety requirement that requires the bottles to be staged in the DCT areas.
. . ~ .~. . . - . . ~ - - . - . _ . . - . - . - . . . . -. . - .-. . - . - - -
Atttchm:nt to
-. W3F1-96-0210 Pags4of7 l A series'of communication errors and incorrect assumptions led Operations
- , . personnel to assume that System Engineering would stage the bottle.
Engineering personnel informed the Control Room of the lack of requirements for the bottles and believed that Operations would stage the bottle as a i requirement of OP-901-511. No one person took ownership of the issue and 4
acted as the coordinator to ensure replacement of the bottle.
On 10/21/96, NRC inspectors discovered that a nitrogen bottle was staged in the A DCT area but not in the B. )
(2) Corrective Steos that Have Been Taken and Results Achieved Once informed, the shift superintendent directed personnel to immediately j place a nitrogen bottle along with the necessary equipment in the area of CC-135B.
(3) Corrective Steos Which Will Be Taken to Avoid Further Violations
. A review will be done of the need for the temporary nitrogen bottles to l
be staged in the DCT areas. If the bottles are left in the area, they will l be identified with an OPS AID.
l e As an enhancement, OP-901-511 will be revised to remove requirements for staging the nitrogen bottles in the DCT area.
. Operations management will review this CR with personnel with emphasis on the necessity for thorough communications and proper follow-up of assigned task completion. Also stressed will be the 2 consequences of incorrect assumptions during problem solving.
- (4) Date When Full Compliance Will Be Achieved Waterford 3 is currently in full compliance in that the temporary nitrogen bottle I has been staged in the DCT area. Estimated completion dates are provided, above, for corrective actions aimed at reducing the potential for future violations. Those corrective actions will be completed by July 31,1997.
Attrchmant to I -
W3F1-96-0210 '
[- -
Pegs 5 of 7 h VIOLATION NO. 9624-02 1
10CFR50.55a(g) requires, in part, that inservice testing to verify operational
- readiness of pumps and valves whose function is required for safety be t , accomplished in accordance with Section XI of the ASME Boiler and Pressure Vessel Code.
i j Section XI, " Rules for Inservice inspection of Nuclear Power Plant Components,"
Subsection IWV-1100, includes within the scope of inservice testing, Class 1, 2, and
- 3 valves (and their actuating and position indicating systems), that are required to
- perform a specific function in shutting down the reactor or in mitigating the consequences of an accident.-
Contrary to the above, as of October 22,1996, the licensee failed to verify the operational readiness of valves whose function is required for safety in accordance l ' with Section XI. of the ASME Boiler and Pressure Vessel Code. Specifically, the i licensee failed to perform testing that ensured operational readiness of the safety-
{ related air accumulators'of ASME Class 3 valves.
i
RESPONSE
l Basis for Discutina the Violation .
! Waterford 3 disputes the NRC's position that the failure to stroke fail-as-is valves -
- CC-134A(B) and CC-135A(B) using their air accumulators as the source of air constitutes a violation of 10CFR50.55a(g) and ASME Section XI.
l As noted in your inspection report, the operation of ASME Class 3 valves
- CC-134A(B) and CC-135A(B) mitigate the consequences of the design basis tornado
! event. Therefore, Waterford performs the following tests to verify the operational
! readiness of each valve and its actuating device:
f . Quarterly IST stroke time test using the lA system as the motive force for the .
valves. Both valves are timed in the open and closed directions.
! . Accumulator drop test each refueling outage to meet 10CFR Appendices A and B j operational readiness criteria.
i
! Inspection Report 96-24 cites Information Notices (IN) 85-84 and 86-50 which i describe the failure to test valves that have been identified as fail-safe (i.e., valves L that fail to either the open or closed position on a loss of control air or power).
, ASME Section XI, Subsection IWV-3415, also addresses fail-safe valves. This j section states that when practical, valves with fail-safe actuators shall be tested by l observing the operation of the valves upon loss of actuator power.
j Valves CC-134A(B) and CC-135A(B) are not fail-safe valves. These valves are fail-
- - as-is valves (i.e., valves that do not change position on loss of control air or power).
Because they fail-as-is, these valves do not change position on loss of control air or
Attachm:nt to W3F1-96-0210 Pags 6 of 7 power. These valves are therefore not subject to testing in accordance with subsection IWV-3415.
Engineering inspection report 96-202 also comments on Waterford 3's position on testing of fail-safe valves in accordance with IWV-3415. The inspection report states that the licensee did not interpret the ASME quarterly test specified in the ASME ~
. Code Section XI, Article IWV-3415 for fail-safe valves, to include valves that relied on air accumulators to change position on loss of normal non-safety IA.
The IST Program monitors valves for degradation so that corrective action may be taken in a timely manner should problems with the valves develop. Valves CC-134A(B) and CC-135A(B) are in Waterford's IST Program. The testing currently performed on these valves satisfies all applicable ASME Section XI requirements.
Consistent with the definitions from Regulatory Guide 1.22, the actuator or actuating system of the code class valve is taken to be, "A component or assembly of components that directly controls the motive power (electricity, compressed air, etc.).
for actuated equipment." An air accumulator does not " control the motive power"; ;
rather, it provides the motive power which is controlled by the actuator. An air i accumulator is therefore not part of the actuator or actuating system.~ There is no )
requirement in ASME Section XI, Subsection IWV, to test accumulators on fail-as-is i valves.
Waterford 3 does believe, however, that periodic testing of accumulators for CC-134A(B) and CC-135A(B) should be conducted in accordance with 10CFR50 Appendix B Criterion XI, Test Control, to duplicate, as closely as practicable, the performance required of the valves in the event of an accident. This has been addressed in Condition Report CR-96-1978. Therefore, stroke testing CC-134A(B) and CC-135A(B) using the accumulator as the motive source will be added to STA-001-005, " Leakage Testing of Air and Nitrogen Accumulators for Safety Related Valves." Initial testing will be completed by January 15,1997, with subsequent testing being performed on a refueling outage basis. Wat3rford 3 believes that stroke testing these valves each refueling outage will verify their operational readiness under all conditions.
In addition, it has also been determined and documented in CR-96-1978 that periodic testing of the accumulators for the following valves should be conducted.
These valves will be stroke tested with their respective accumulators each refueling outage beginning with RF8:
. CC-641, CCW to Containment Outside Containment isolation
. CC-710, Containment CCW Return Header Inside Containment isolation e CC-713, Containment CCW Return Header Outside Containment isolation
. CC-963A, Shutdown Heat Exchanger A CCW Flow Control Valve
. CVR-101, Containment Vacuum Relief Train B Control Valve
. CVR-201, Containment Vacuum Relief Train A Control Valve
Att::chment to
+
W3F1-96-0210 Pcgs 7 of 7 A preliminary evaluation has been performed regarding the above valves. It has !
been determined that the accumulators for CC-134B and CC-135B are free from moisture accumulation. Since these valves are located in the -35 wing area at the ,
lowest point of the lA system, this is strong evidence that IA accumulators in general will not experience air volume reduction due to moisture buildup. Accumulator 1 volume reduction could result in degradation or loss of function of the associated l valve if the accumulator was needed during a loss of instrument air event.
Further review has shown that there is a high degree of confidence that listed valves will perform if needed based on:
is I
- 1. all of the listed valves are tested periodically as required by ASME Section XI
- 2. the lA system dewpoint is maintained at s -10 *F and is therefore very dry and will not promote corrosion 3, a maintenance history search was performed and only one recorded event was found where an IA check valve (test boundary valve) failed to close during accumulator testing Given the above, Waterford 3 believes there is a high degree of certainty that the .
subject will perform as designed. This, coupled with the stroke testing of these !
valves each refueling outage will verify operational readiness for air-operated safety-related valves supplied with air accumulators under all conditions.