ML20127B914

From kanterella
Jump to navigation Jump to search
Summary of 840710 Meeting W/Util,Ebasco & Consultant at Site Re Util Proposed Program for NDE of Cracks in Common Foundation Concrete Basemat
ML20127B914
Person / Time
Site: 05000000, Waterford
Issue date: 07/26/1984
From: Lazo L
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
Shared Package
ML20125A430 List: ... further results
References
FOIA-84-426, FOIA-84-449, FOIA-84-A-55, FOIA-84-A-65 NUDOCS 8408060362
Download: ML20127B914 (3)


Text

I

,. m._

UNITED STATES

-[

^.s,

,,/ }.

N,UCLEAR REGULATORY COMMISSION 4

5/

f i s.f:,!,!1 '!

'nASHING TON. D. C. 20555

/

%,....f July 26, 1984 Docket No. 50-382 APPLICANT:

Louisiana Power and Light FACILITY:

Waterford Unit 3

SUBJECT:

SLWARY OF JULY 10, 1984 NEETING A meeting was held between the NRC Staff and Louisiana Power anc Light (LP&L) representatives on Tuesdav, July 10, 1984 at the 'naterford Steam Electric Station, Unit 3 site. Also attending the meeting were representatives of Muenow and Associates, a consultant to the applicant and EBASCO Services Inc., the Architect engineer. A list of attendees is included as Enclosure 1.

The purpose of the meeting was to discuss LP&L's proposed program for the non-destructive examination of cracks in the Waterford 3 common foundation concrete basemat.

The program was presented to the staff by R. A. Muenow of Muenow and Associates who will be performing the non-destructive micro'icismic evaluation of the concrete using the pulse echo method.

The program will define the vertical extention of East-West cracks located at the top of the mat including those beneath the reactor building.

In addition, one NE-SW crack, northeast of the reactor building and one NW-SE crack, northwest of the reactor building will be examined and evaluated.

The examination will attempt to define crack depth, width, length, orientation, and proximity to, or linkage with, other cracks in the lower portion of the mat.

It is expected that the examination of the cracks and the evaluation of the l

collected data will take approximately three weeks. At tnat time LP&L and their consultant Mr. Muenow will present their findings to the staff.

Their report will include the effect of the findings on the basemat design assumptions, and any corrective actions required.

The staff will review the data. prior to making a safety determination of the mat's integrity.

Ew?!

af0

%!S,garJg.;Lazo. Er.olectQanagerg Licensing Branch No. 3 Division of Licensing g

h 0f sp ee d 2 ye an n

~

llATERFORD BASEMAT NDE PROGRAM MEETING July 10, 1984 ATTENDEES NRC L. Lazo D. Crutchfield J. Na L. Constable T. Flippo APPLICAtlT K. Cook, LP & L T. Gerrets, LP & L R. Leddick, LP & L D. Dobson, LP & L R. Burski, LP & L R. 8.agnetto, LP & L P. Liu, Ebasco N. Hasan, Ebasco A. Ween, Ebasco R. Muenow, Muenew & Assoc.

T. Hedgecoe, Muenow & Assoc.

.