ML20127B619
Text
l f4AY 0 8 12E4 t
j m g '4 UNITED STATES NUCLEAR REGULATORY COMMILGION.
j, -
.I WASHINGTON, D. C. 20555 k.... /
l[E' p
NAY 0 4 1kO4 MEMORANDUM T0:
John Rebello, Chief
'~
Administrative Contracts Branch Division of Contracts Office of Administration FROM:
Jesse L. Funches, Director Planning & Program Analysis Staff Office of Nuclear Reactor Regulation
SUBJECT:
REQUISITION FOR NRC TASK FORCE AT WATERFORD 3 l
Attached is a requisition for costs incurred from the NRC Task Force effort I
at Waterford 3.
NRR, as the Task Force leader, feels that these costs
~
incurred from the use of Louisiana Power & Light equipment and supplies is justified because of the cost-benefit advantage this approach has. over contracting these services commercially.
If you have any questions concerning this requisition, please contact William H. Foster in Region IV.
/
sse L. Funches, Director Planning & Program Analysis Staff Office of Nuclear Reactor Regulation t
Attachment:
As stated
~'
cc: William H. Foster, R-IV
=
9 f
O e
nenmuy
i
- nc r./.M 34 U. S. NUCLEAR REGULATORY COMMISSION._
nevi i
REQUISITION FOR SUPPLIES, EQUIPMENT, OR t. ABOR SERVICES 1
,1 L[GW INSTR;JCTIONS ON REVER5E OF FORM &ET. Fie'.a'r.**Requesier's Pending CC;iy" for S. PROCEE51NO OFFICEA Mb*ENR7A
$ Property and $dDpty Branch, FQS.
- 1. REQUISITION NUMBER A. REQUltiTIONING ORGANtIATION
- 1. PERSON TO CONT ACT l2. Pt90NE NO.
- 3. DATE OF REC.
- 2. FUNCTIONALCODE i.f.H. Foster /Susie Roberson 728-8112 4-25-84
- 4. DELIVER TO (no.s,sissag eas Asem sve.; AO.Meisens Aparee'l
- 3. REQUIREMENT APPROVEO (4,paervre)
USNRC, RIV
- a. REOutstT40NING OFFICER (4sgaervref Arlington, TX TITLE L APPROVALS (stems neeartroes unoer groups t rsrouga t ea rne renese er thte term onue:be epare.ec
- 5. ACTION SIGNATURE DATE by 34e Properry C.emedes ead fae Orfes t@lvvedea Director er Desgase./
- a. POSTED
- l sortify Wiet personal property assets within the OfficalDivlelen have been onrefutty eresned ter enames; are arrently fully utiltand, and the mod tional recuented items are
- b. P.O. ENTRY esmolutely annential to work performeres arid will De used enry t.s essentieJ. cf f ateel
- s. PILLED
- a. PROPERTY COLAN.f&igaervie c
~
- d. DELIVERED y
D. OgrPICEttfiVislON DIRECTOR C A DE5rGMEE (sigstervref
- e. COMPLETED W.H. Foster, Dir., DRMA ///yr 1 e
PvRmAsE AcriON ft-a e eaas
- e. smP TO (coaerease ea< Danaeu=>
- 4. REQUEITED TTEM8 theese Tres erPrtatenaDeveas saaes Serseen stems)
L IT O*
(INCLUCt. luth!ICA 10 Jeeat90 sed vaeor 0roun t. 0)
NRC Task Force needs for Waterford Plant from Louisiana Power & Light Company estimated 2 h months beginning 3/26/84.
1.
Two Display Writers 0 $1,330.00 per month Est 2 h months = $3,325.00 EST.
2.
Trailer rental - one 9 $650.00 per month
. EST. 2 months =.$1,625.00 EST.
Trailer rental - one @ 5350.00 per month EST. 2 h months = $875.00 EST.
l l
3.
Utilities costs, EST. $300.00 per month Est. 2 h months = $750.00 EST.,,,
4.
Xerox Coping, Est. $100.00 per month Est. 2 h months = $250.00 EST.
1 5.
Misc. supplies, Est. $50.00 per month Est. 2 h months = $150.00 EST.
Total Estimated for this period:
$6,975.00
'"';"**8""'"'
^ ^7'.
t ~ -....... # c.... r,,,-i,e... ne.e.see,w....ee,, t,e... atn,.,,.we nir.oec n,ed.
" " " .!" * '.'.'. 2 '.:
.