April 24,198f Decket I:c. 50-382
!'El'.0RANDUM FCR:
G. Lainas F. liiraglia T. Novak F. Schroeder F. Rewsome J. Knight W. Jchnston R. Heuston L. Rubenttein D. Muller W. Russell FROM:
T. Novak, Assistant Director for Licensing, DL SU5 JECT:
ISSUES CURRENTLY UliDER REVIEU WITHIN LRR TO SUPPORT LICENSING OF WATERFORD 3 Leedriana Power and Light Ctr.;any has informed the NRC that they will tse ready for anc anticipcte receiving an operatint license on l'ay.10,1984 There are a number of issues currently under review within hRR which reed to be reviewed on a priority basis in order to support the licensing of Waterford 3. lists the issue, the responsible review branch and comments for each issue under review.
In view cf the limited amount of time remaining between now and the date that the applicant anticipt.tesfor licensing, you are requested to provide inputs to SSEF. 76 for these issues by C.O.B. on May 7,198t..
Ycu should cocrdinate your respenses with the Project Manager, J. Wilson at extension 27702.
h 7 T. Novak, Assistart Directer fer Licensing
.* Division of Licensing
Enclosure:
As stated cc w/ enclosure:
V. Eenarrya F. Resa i
G. Letr D. Zierant.
W. Garen111 H. Butler p/
F. Bocher V. I:conan E.C. Lias.'
W. T:egan g
l
(
m 4$$$3[1h 2pp$
L- -
a
a 1
ISSUES CURRENTLY UNDER REVIEF! UITHIN NRR TO SUPPORT LICENSING OF WATERFORD 2 s
Issue Responsible Dra.
Comments 1.
Pass Operability NRR/DE/CMEB/DL Complete prior to exceeding LicenseCondition(FP) 5% power 1
2.
Appendix R (FP)
NRR/DE/Ci1EB Under review 1
l 3.
Cracking cf Concrete NRR/DE/SGEB Cracking ef Basemat has Basemat been alleged as a construc-tien concern.
Presently under staff review 4
Leakage Reduction NRR/DSI/METB May recuire license condition Program-(III.D.l.1) 5.
Cnsite stcrage of t:RR/DSI/ttETB May recuire license ccndition low level waste 6.
Centrol Room Design NRR/DHFS/HFEB Staff awaiting applicant Review input on human engineering discrepancies 7.
Plant and Corporate NRR/DHFS/LOS Reorganizatien identified in Recrgenization FSAR Anendnent 34 6.
Preservice Inspecticn NRR/DE/MTEB SSER, ccepleting review Program 9.
Energency Feedwater NRR/DSI/I'CSB SSER, completing review Control 10.
Emergency Operating NRR/DHFS/PSRB SSER, completing review:
Procedures 11.
CCH Design Change URR/DSI/CSB SSER, relex civersity criteris to CIAS to prevert PCP danage - SSER, com;1eting revier 12.
ILE Euljetin 79-27 NRR/eSI/ICSB SSER, completirg review 13.
Operator Training NRR/DHFS/ LOB Review ef FSAR Update la.
Purge Valve FRR/DE/ECB Technical Review performed Cualification by BUL 15.
in.ic gas detecto-s NPR/DE/SAB May recuire JIo fcr
'or C.P.. Isolaticr.
inoperable system; cessible license cenditden g.
u