Insp Rept 50-400/85-23 on 850528-30.No Noncompliance Noted. Major Areas Inspected:Physical Security Plan Implementing Procedures,Security Organization & Physical Barriers.Details Withheld (Ref 10CFR2.790 & 73.21)
ML20126M129
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 06/12/1985
From: Mcguire D, Tillman A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20126M114 List:
References
50-400-85-23, NUDOCS 8506200243
Download: ML20126M129 (1)


Text

. '

p Efo UNITED STATES

/j ug'o NUCLEAR REGULATORY COMMISSION

[\ /g/ j, R EGION 11 g 101 MARIETTA STREET, *' s AT L ANTA, GEORGI A 30323

...../ JUN 171986 Report No. 50-400/85-23 Licensee: Carolina Power and Light Company 411 Fayetteville Street Raleight, NC 27602 Docket No. 50-400 License No. CPPR-158 Facility Name: Shearon Harris Nuclear Power Plant Inspection Date: May 28-30, 1985 Inspector: NON ff4/) b// <FrE A.Ti}lm],'PhysicalSe'curityInspector Wte S'igned Approved' by b . .

I M lo ' ll.17 g.R.McGuire, Chief,QhysicalSecuritySection DateSi6ned

' Nuclear Materials Safety and Safeguards Branch Division of Radiation Safety and Safeguards SUMMARY Scope: This announced pre-operational inspection involved 12 inspector-hours on site inspecting: Physical Security Plan Implementing Procedures; Security Organization; Physical Barriers - Protected Area; Physical Barriers - Vital Areas; Security System Power Supply; and Detection Aids - Protected Are Results: The construction, installation and implementation of security facilities, equipment, and operational activities in the areas in which review could be accomplished, appeared to be progressing in accordance with the

% provisions, and commitments of the proposed physical security, contingency, and training and qualifications plan g6200243050617 G ADOCK 05000400 PDR ENCLOSURE CONTAINS*"

          • """'**

3ApEGUARDS INFORMATION' "PAGE