IR 05000400/1985021
| ML20128K922 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 06/18/1985 |
| From: | Verrelli D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Utley E CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML18019A259 | List: |
| References | |
| NUDOCS 8507110164 | |
| Download: ML20128K922 (1) | |
Text
44 lick)
s June 18,1985 Carolina Power and Light Company ATTN: Mr. E. E. Utley Senior Executive Vice President Power Supply and Engineering and Construction 411 Fayetteville Street Raleigh, NC 27602 Gentlemen:
SUBJECT: REPORT NO. 50-400/85-21 On May 20-24, 1985, NRC inspected activities authorized by NRC Construction Permit No. CPPR-158 for your Harris facility.
At the conclusion of the inspection, the findings were discussed with those members of your staff identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observation of activities in progress.
Within the scope of the inspection, no violations or deviations were identified.
Should you have any questions concerning this letter, please contact us.
Sincerely, (Original signed by DMVerrelli)
David M. Verrelli, Chief Reactor Projects Branch 1 Division of Reactor Projects Enclosure:
Inspection Report No. 50-400/85-21 cc w/ encl:
R. A. Watson, Vice President Harris Nuclear Project R. M. Parsons, Project General Manager bec w/ encl:
NRC Resident Inspector 8507110164 850618 Document Control Desk PDR ADOCK 05000400 G
PDR State of North Carolina g'660 c//h
\\
L ackson:jw CMUpright AFGibson PE e r-ickson 6/
6/
6
6/d/85