Forwards Std Order for DOE Work: Resolution of Waterford Unit 3 QA, Approved as Modified
ML20126E059
Person / Time
Site: 05000000, Waterford
Issue date: 05/03/1984
From: Eisenhut D
Office of Nuclear Reactor Regulation
To: Wade T
ENERGY, DEPT. OF, IDAHO OPERATIONS OFFICE
Shared Package
ML20125A430 List: ... further results
References
CON-FIN-A-6819, FOIA-84-426, FOIA-84-449, FOIA-84-A-55, FOIA-84-A-65 NUDOCS 8506150282
Download: ML20126E059 (225)


Text

.

/pa sso b, UNITED STATES w

NUCLEAR REGULATORY COMMISSION I

WASMGTON, D. C. 20555

%....^. s May 3, 1984 Mr. Troy E. Made, III, Manager

!daho Operations Office U.S. Department of Energy 550 2nd Street Idaho Falls, Idaho 83401

Dear Mr. Wade:

SUBJECT:

INEL TECHNICAL ASSISTANCE TO THE DIVISION OF LICENSING, NRR,NRC:

" RESOLUTION OF WATERFORD UNIT 3 QUALITY ASSURANCE" FIN A-6819 The enclosed NRC Form 173, Standard Order for 00E Work, is hereby submitted in accordance with Section III.B.2 of the DOE /NRC Memorandum of Understandirg of February 24, 1978.

As indicated in the enclosed NRC Form 173, we have reviewed the Idaho National Ergineering Laboratory (INEL) proposal tated April 2,1984, for the subject program and approve the proposal es modTfied in the attachment to the PRC Fom 173. The modifications are to increase the r'equired level of effort which is urgently needed at Waterford Unit 3 and for the reporting recuirements. We have discussed the modifications to the Statement of Work with and have agreed upon an estimate cost and schedule for the work with Mr. 8. Barnes of INEL.

The modified program is estimated to be S232,000 for FY84 The enclosed NRC Fom 173 provides an additional S182,000 to fully furd the program in FY84 Funding authori:ation in the amount cf $50,000 in FY84 has provicusly been provided for this procram.

He recuest that a revised INEL proposal includino the modifications a*.tached to the enclosed NRC Fom 173 be submitted with six (6) copies within 10 days in the forrat of the Statement of Werk for this program to:

U.S. Nuclear Reculatory Commissicn ATTN: Mark Wilitams, Chief, TAPMG Division of Licensfrg Washington, OC 20555 Standard terms and conditions for NRC worir, as provided for in 00E/NRC Metrorandum of Understandinn of February 24, 1978, and described in the NRC Manual Chapter 1102, apply to this effort.

Q/A N $Vh 4/r73r 85061$g2850301

&. - -ss

=

.x

~. -.... -

l.

1 7.

i l

No changes to the Statement of Work are authorized without prior written j

approval from me.

If you have any questions concerning this order, please contact Park Williams, TAPMG, on FTS 492 8461.

t l

Sincerely, t

1 C

1-

[DivisionofLicensingDarrell G. Eisen!ut, Dire 1

t 1

I

Enclosures:

NRC Fom 173 w/ attachment Podification to the Statement of Work i

cc w/ enclosure:

j See next page t

i h

i i

l i.

i i

i i

i i

1 1

1 i

i

T

~

Troy E. Made, Manager U.S. Department of Energy Idaho Operations Office 550 2nd Street Idaho Falls, Idaho 83401 cc:

Mr. Robert W. Barber Office of Nuclear Safety - EP-34 U.S. Department of Energy Washington, DC 20545 fir. Darrell Lewis U.S. Department of Energy Idaho Operations Office 550 2nd Street Idaho Falls, Idaho 83401 Mr. R. E. Tiller U.S. Departnent of Energy Idaho Operations Office 550 2nd Street Idaho Falls, Idaho 83401 Mr. P. Litteneker U.S. Departrent of Energy Idaho Operations Office 550 2nd Street Idaho Falls, Idaho 83401 Mr. C. Obenchain Idaho National Engineering Lab EG&G Post Office Box 1625 Idaho Falls, Idaho 82415 P'r. B. Barnes Idaho National Engineering Lab EG&G Post Office Box 1625 Idaho Falls, Idaho 82415 e

f

^

Troy E. Wade, Manager May 3,1984 U.S. Department of Energy Idaho Operations Office 550 2nd Street Idaho Falls, Idaho 83401 cc: Mr. Robert W. Barber Office of Nuclear Safety - EP-34

'i U.S. Department of Energy Washington, DC 20545 Mr. Darrell Lewis U.S. Department of Energy Idaho Operations Office 550 2nd Street Idaho Falls, Idaho 83401 Mr. R. E. Tiller U.S. Department of Energy Idaho Operations Office 550 2nd Street Idaho Falls, Idaho 83401

\\

Mr. P. Litteneker U.S. Department of Energy Idaho Operations Office 550 2nd Street Idaho Falls, Idaho 83401 Mr. C. Obenchain Idaho National Engineering Lab EG&G Post Office Box 1625 Idaho Falls, Idaho 82415 i

i Mr. B. Barnes Idaho National Engineering Lab EG&G l'

Post Office Box 1625 Idaho Falls, Idaho 82415 g

i OISTRIBUTIONI NRR PROJECT FILE FMiraglia ZRosztoczy f

TAPMG Reading JLeonard f

e J0cnchew/MW1111ams DCrutchfieldf V

li, CON 00andois, CON j

MPMG D'L:TAPN0 OtrApj/A P

chew:1b MWt fam 0C c field FM(reglia der fsenhui 4g/84 4/.0 84 y 4/g /84 4/4r/84

/v/84 4/ss/84 l

e

'(

l

1 1 -

i NRC acau 173 u s sucLE Aa aEcuta' caw couuissicN caOE a NUMet a (5 -791 20-84-361 OATE STANDARD ORDER FOR DOE WORK May 4, 1984 ISSUED TO: (00E Offical ISSUED BY: (NRC Of fical ACCOUNTING CITATION Office of Nuclear Reactor

^**a oaa sa T'o~ svu 8ci.

Idaho Operations Office Regulation, DL 11vnsnn_sna BAa NuMBEa 20-19-40-41-1 PERFORMING ORGANIZATION AND LOCAtl0N Idaho National Engineering Laboratory

'j"6b-4 Idaho Fall s, Idaho WOR K PE RICO. THIS ORDE R FIN TITLE fixed I ESTIMATEo O Resolution of Waterford Unit 3 Quality Control Allegations

'08/06/84

'i2/15/84 08 LIGATION AVAILABILITY PROVIDED BY:

l$182,000 A THIS OR DER

$ TOT AL 05 ONCERS PL ACEO d AICR 70 THIS CA TE WITM THE PERFORMING CRGANIZATION

'**"'""*"'"5C'"'

  • 4,759.000 TJ"Nv 's!^*!iMAeo' ' ^ *'
  • 5'"'

E ls4,941,000 C TcTAL CRCERS To CATE ifoTAL 4 a s' 0 AMOUNT INCLUDE 0 IN 'C" APPLICA8LE TO THE " FIN NUMBE R* CITEQ IN THIS OR DE R S

SINANCIAL SLEx10lLITY I

T FUNCS WILL NOT BE REPROGR AMVED 8ETWEEN PINS UNE O CONSTITUTES A LIMITAflCN CN 08LIGATICNS AUTHORIZEO Q 8UNCS VAY SE REsacGRAMMED NOT TO EXCEED : ' car.CF FIN LEVEL UP TO $504. UNE C CCNSTITUTES A LIMITATION CN COLiGATICNS AUTHCar2E D STANDARD TERMS AND CON 0lT10NS P8 TOV 10E0 00E ARE CONSIDEREO PART OF THl3 ORDER UNLESS OTHERWISE NOTEO.

ATTACHVE N TS THE FOLLOWING ATTACHMENTS ARE HE REdv SE Cual TV M ACE A P ART OF ?Hl3 ORCER I wont ON Twi$ CaCER 15 NCT OLA$318'EO

$ STATEVENT 08 40R< 3qqj s(C C WCaK ON Twis C ACEa INVOLVES CLAssisiEO 2 A00ificNAL TERuS ANo %N6iNNion iNacavaTiCN NnC soav +87 'S AT? ACHED oTHER im 't***C0 f** 2!00088* DV %"*00' end Jett ind ndstett it ing attached siste-'ent of were m00 dues the 00( pt000 sod REMARKS e

This order accepts the INEL proposal dated April 1984 for this FIN as modified in the attached Modification to the Statement of Work, requests a revised proposal including the modifications within 10 days, authorizes the work in the modifications which is urgently needed and provides funds of $182,000 to fully fund this program in FY84 The program is estimated to be $232,000 in FYS?.

l l

! Af ter acceptance, please senc to :ne NRC Office of Resource "anagement ATT1: 0.Dancoid,

and provice a cocy to tne Jf fice of Nuclear Resc ce Regulation, ATT1

K. McGra th.

m

'ISSUt%G AU THO RITY I

ACCEPTING ORGANIZATION I

O / Q

,dh gp

~**'

I mQ j,~ w n4~ m we e ucmig NRC s tav 173 4 7 i

Da ted :.iay 3,1934 F00tFICATION TO THE STATFMENT OF LIORK

Title:

Resolution of Faterford Unit 3 Quality Assurance Allegations FIN No.: A-6819 Project Manager: Jack Donohew (FTS 492-7230)

Estinated Level of Effort: 1.6 direct technical staff years 2.

Reportino Reouirement: Technical Evaluation Letter Reoort The irterim report will be provided to the NRC Lead Engineer at the end of the plant site visits between May 14 and May 30, 1984 Add the follcwing paragraphs to this Section:

"The following information shall be included on the title page for the interim and final TER.

a.

Contractor's Identification b.

Program or Project Title c.

Subjects d.

Author (s) e.

Resconsible NRC Individual and Of' fee or Division 8

NRC FIN Number

\\

c.

Document Date h.

Plant Name and Cocket Number In addition, the 'ollowing notice shall be included on the inside front Cover!

NOTICE This report was prepared as an account of work socnscred by an agency of the United States Goverrrent. Neither the United States Govarnment nor any agency thereof, or any of their employees, nakes any warrant, expressed or implied, nr assures any legal liability or respcnsibilitv for any third par *.y's use, or *he results cf such use, of anv infoniation, apparatus prnduct or prCCess disclosed in this report or represents that its use by such third party could not infringe privately owned rights. Tha "fews expressed in this raport are not necessarily those of the U.S. Fuclear Regulatory Cornission.

Prior to completing and forwarding the interim and final TER, the centractor shall Dravide a draf t to the NPC Lead Engineer for his review and ccrrents.

Tha dra't shall be clearly marked shewin1 that it is a draf t renort and, in addition to the ebove information, shall include the 'ollrwinc antice:

'This decurent was prepared prirarily for Dreliminarv or internal use.

It has not received full review and accenval.

Since *.here rav be substantive chances, this decurent thould not be censidered firal.'

F

-2 (5) MEETU!GS AND TRAVEL Replace this Section with the following:

"1.

A first two-week visit for the seven-person team to the plant site with the team working up to 7 days a week, twelve hours a day.

2.

A second three-week visit for the seven-person team to the plant with the team working up to 7 days a week, twelve hcurs a day.

This visit may be broken down into as many as 3 separate visits of one week each. This will be decided by the NRC Lead Engineer.

3.

A one week, one-person visit to NRC offices, Bethesda, l'aryland, to write results of the first team visit to the plant site.

4 A one-day, two-persor visit to NRC offices at Bethesda, Maryland, for presentation of findings and conclusions of the entire effort.

5.

Travel required by this project and not identified in the Statenert of Work must receive prior approva,1 of the NRC Pro.iect Manaoer. "

\\