.tlAR 3 0' E34 MEMORANDUM FOR: Jesse L. Funches, Director Planning and Program Analysis Staff j
FROM:
Darrell G. Eisenhut, Director Division of Licensing
SUBJECT:
PIDS FOR FIN A-6819, RESOLUTION OF WATERFORD OUALITY CONTROL ALLEGATIONS Project Identification Summary sheets (PIDS) are attached (Attachment 1) for the subject project, which is to be accomplished by the Idaho National
,.y Engineering Laboratory.
An additional $100K in the Casework Decision Unit must be allocated for the stated FIN because DL presently has no funds approved for this work. Also Advance funding in the amount of $50K is needed to enable initiation of work on this project by INEL.
The basis for the urgency of this work is explained in an EDO memorandum of March 12, 1984 (Attachment 2). The resolution of these allegations must begin immediately to avoid potential delay of the low power licensing decision for Waterford.
If work were delayed to obtai_n a proposal, a corresponding delay may occur in NRC Staff resolution of licensing issues and a licensing impact could result. Any questions ~should be directed to Mark Williams, on extension 27014.
'q 8506150277 850301 f
t [kg pg PDR FOIA GARDEB4-A-55 PDR Darre Division of Licensing
Enclosure:
e As stated fQ/A $fW DISTRIBUTION Central File Qj TAPMG Reading MWilliams JDonohew 7@a@/
Lgx DEisenhut b
w 3 Mjn 3/gj/84 kN DL: ORB #5
- TAPMG D-ate dre dninPMG Dt ew:cc DCrutchfiele n
15ans
_ senhut
/1g/84
/W184
/ M84 g/19/84
,14 4e e-t pens mwm
3 6 0 B34 MEMORANDUM FOR: Jesse L. Funches, Director Planning and Program Analysis Staff FROM:
Darrell G. Eisenhut, Director
,I Divisior of Licensing
SUBJECT:
PIDS FOR FIN A-6819, RESOLUTION OF WATERFORD QUALITY CONTROL ALLEGATIONS Project Identification Summary sheets (PIDS) are enclosed for the subiect
.. project, which is to be accomplished by the Idaho National Engineering Laboratory.
$105 K An additional M in the Casework Decision Unit must be allocated for the stated FIN because DL presently has no funds approved for this work.6A-c)
A M ce funding in the amount of $50K is needed to enable initiation of work on this project by INEL. gAta resc!t J e':gaticm, gesMentMavrteen l
- ead cremi@y H+y; cmthi4ca117 dow...wici.fta, e -
Ra ter. fox 6-Un i t-9-by-thesppM cant.. The resolution of these allegations' must begin immediately to avoid \\ potential delay of the low power licensing decision for Water Any questions should be directed to Mark Williams, Sn extension 2701a L st.*. - *7 Darrell G. Eisenhut, Director Division of Licensing
Enclosure:
As stated h
hIgm N
"'f )
' ois?!MH" h
wnt m we.42
- cm m3 f l~
4 TAPMG Reading wrA@ d e eG MWilliams
/
JDonohew DEisenhut-y m e$rc)
} % eVa a quxw! k i
(,4 AR y uw)ow n atm :$1 eL% q A'.9~m "'d'AM l
h.
/t DfpKO[}S
/
FL/
APMG DL: DIR DL TAPMG s.
l
'Jionohew:cc DC t af eld-MWi liams DEisenhut JLeonard l
@ /84
/ /84
) 6 % /84
/ /84
/ /84
w-o UNITED STATES 8
"h, NUCLEAR REGULATORY COMMISSION
(
WASHINGTON D. C. 20555
%..... +
,. LEAR h 019S4
/
f r
MEMORANDUM FOR: Jesse L. Funches, Director Planning and Program Analysis Staff FROM:
Darrell G. Eisenhut, Director Division of Licensing
SUBJECT:
PIDS FOR FIN A-6819, RESOLUTION OF WATERFORD QUALITY CONTROL ALLEGATIONS J.
Project Identification Summary sheets (PIDS) are attached (Attachment 1) for
~
the subject project, which is to be accomplished by the Idaho National Engineering Laboratory.
An additional $100K in the Casework Decision Unit must be allocated for the
~
stated FIN because DL presently has no funds approved for this work. Also Advance funding in the amount of $50K is needed to enable initiation of work on this project by INEL.
The basis for the urgency of this work is explained 'in an EDO memorandum of March 12, 1984 (Attachment 2). The resolution of these allegations must begin immediately to avoid potential delay of the. low power licensing decision for Waterford.
If work were delayed to obtain a proposal, a -
1, corresponding delay may occur in NRC Staff resolution of licensing issues and a licensing impact could result. Any questions should be directed to Mark Williams, on extension 27014.
i
~
Darrell G.
isenhut, Director-l Division of Licensing
Enclosure:
/
As stated 1
l 1
l.
~
tttachmen) 1
~
OFFICE OF NUCLEAR REACTOR REGULATION PROJECT. IDENTIFICATION SUP."ARY (PIDS) g30$-
TITLE: Resolution of Waterford Unit 3 Quality Control Allegat' ions FIN: A-6819 CONTRACT NUMBER (Non-DOE):
$&RNUMBER:
' NRR OPEPATING PLAN 20-19-40-4)-1 INDEX NO.:
DIVISION:
BRANCH:,
PROJECT PANAGER:-
DL TAPMG Jack Donohew, Jr.
CONTRACTOR: INEL(EG&G)
CONTR4CT METHOD: DOE Wo'rk Order CITY, STATE (Non-DOE):
5 FALL BUSINESS / MINORITY CONTRACT (Non-DOE):
SUS-CONTRACTOR (5): No YES / /
NO /X/
AMOUNT $
PROJECTED PERIOD OF PERFORMANCE START: 4/2/84 END: 6/30/84 PROJECTED FINANCIAL DATA (000'.s)
PROJECT FY 19EGX84 TOTAL TOTAL T5 tat CARRY FixEsX84
.FY S4X85 FY $$86
~
VALUE OSLIG COSTED OVER BUDG BUDG BUDG 100 0
0 0-100 0
0 APPLICATION (RELATE.THE PROJECT TO A SPECIFIC PLANNED ACCOMPLISHMENT)
~
NRR FY84 Operation Plan: Casework Decir. ion Unit, Planned Accomplish Power Reactor Reviews This contract is provide assistance to NRC in resolving allegations of improper quality control practices during the construction of Waterford Unit 3 plant. These allegations must be. resolved in the near future _ to advoid a potential delay in the low power licensing decision by NRC for this plant.
O t,e a
f e
6
...e O
EM 3 01984 s'
WORK REOUIREMENTS (DESCRIBE WHAT IS TO BE PERFORMED)
The contractor will evaluate the alleged improper quality control practice during the construction of Waterford Unit 3, by a review of associated QA/QC documentation and will document his evaluation which will give the signifi-cance of his findings and the generic implications of his findings as they.
relate to the facility.
The contractor will provide an interim Technical Evaluation Report (TER) and a final TER. The interim TER will be an immediate report to be used by the NRC Staff to address the alleged improper quality control practices in the low power licensing decision for the plant. The final TER will be provided within four weeks of the interim TER.
Contractor Deliverables F][
Interim TER 1
Final TER 1
MODIFICATIONS (DESCRIBE MAJOR CHANGES TO THE PROJECT)
~
COMPLETE AS APPLICABLE -
Recor. mended:
Endorsed:
Endorsed:
Endorsed:
Approved:
PROJECT l'ANAGER TEAM LEADER BRANCH CHIEF ASST SIR.
DIVI'DT4 IIM 1ew DCrutchfield MWilliams Ia hut q_ge.
m e< p.
~ 8.
8.
. %'3t. p unscm,oun:me.e_.
l e
l
~
'd. M 3 0 E M $4R s o t
- WORK REOUIREMENTS (DESCRIBE WHAT IS TO BE PERFORMED) b.u_wu q med.GlRC AcJM g V
The contractor will evaluate the s
lleged improper quality control practice during the construction of tlaterford Unit 3,3will document his evaluation ud-the-departure trf W
.the-+Hqed-t: proper practice-f#cr thsgrepericeG L, cad will give the significance of/his and the generic implications of Ah,is d
.g. m% ~tm Tw & fq, The contractor will provide an interin Technical Evaluation Report (TER) and a final TER.
The interim TER will be an immediate report *to be used by the NRC Staff to address the alleged improper quality control practices in the low power licensing decision for the plant.
The final TER will be provided within four weeks of the interia TER.
Contractor Deliverables FY Interia TEP, 1
Final TER 1
=
MODIFICATIONS (DESCRIBE MAJOR CHANGES TO THE PROJECT) s 9
COMPLETE AS APPLICABLE -
Reco =, ended:
Endorsed:
Endorsed:
MdEndorsed:
Approved:
BRANCH CHF ASST DIR.
DIV. DIR chow l4 Wi F. Miraalia
_D. Eisenhut (Initials)
M-M2W
'S
(
i
//
(Date)
' #[ ~
UNITED STATES
-l NUCLE R REGULATORY COMMISSION n
'* y,
,I WASHlf.GTON D.C.20555
,e
%,m/,
mas 1,21984
[
MEMORANDUM FOR:
John T. Collins, Regional Administrator-Region IV Harold R. Denton, Director Office of Nuclear Reactor Regulation Richard C. DeYoung, Director 3
Office of Inspection & Enforcement FROM:
William J. Dircks Execut'ive Director for Operations
SUBJECT:
COMPLETION OF OUTSTANDING REGULATORY ACTIONS ON COMANCHE PEAK AND WATERFORD
~
Construction of the Comanche Peak and Waterford fac,ilities is nearing y.w.
completion.
There remain a number of issues that 6eidlto be resolved before
~ j, i the staff-can make its licensing decisions. The issues remaining for these
~"
plants are quite complex and span more than one Office.
In order to assure the overall coordination / integration of these issu~es and to assure issues
=
~
are resolved on a schedule to satisfy hearing and licensing decision needs, '
~
I am. directing NRR to manage all necessary NRC actions leading to prompt licensing decisions.
Darrell Eisenhut, Director, Division of Licensing, NRR is being assigned the lead responsibility for this activity. He will coordinate the efforts of NRR, IE, and Region"IV, and will coordinate this activity with 01 and OELD.
Prior to any of the affected Offices undertaking Inajo} activities (e.g., inspections) or making decisions on these plants.
that activity should be concurred in by NRR.
We are presently in the process of assigning a dedicated senior manager to assist M.. Eisenhut in the management of these activities.
The first phase of this program will be the identification of issues needed to be resolved for each plant prior to hearing and licens,ing decisions.
Once the issues have been identified a Program Plan for resolution of each item should be developed and in;ilemented.
The Program Plan should addres's the scope of the work needed, the identification of the responsible line organization, and the schedule for completion.
In principle, this effort will therefore be similar to the effort ' undertaken regarding the allegation review on Diablo Canyon except that this effort should encompass all ligensing, inspection, hearing, and allegation issues.
p,
r -
m 3
Each affected Office will' assign.a full time senior managefto work with NRR to define, schedule and complete the issues.
I expect these managers to be identified by each of you within a few days.
All affected offices should
~-
provide dedicated resources and give their full support to this effort, to assure that all existing issues are expeditiously handled and all new issues In are promptly provided to NRR so as not to delay the licensing decisions.
addition, copies of all information, documents; depositions, etc. should be promptly provided to NRR to ensure a coordinated app, roach.
I anticipate that the approach utilized here will be necessary for a number of upcoming OL projects, and am directing NRR to take the lead for carrying out this activity.
(Sigrie:D E'!!:c !.Dir:kt William J. Dircks Executive Director for Operations cc:
G. Cunningham, ELD B. Hayes, 01
'..;c:.::..: ~
b ::~.:o.
Distribution _:
,J Dircks Roe Rehm Stello E r/f.
.D 4 * -A <Y hQ l.
1)
DLh32!nfield:cc 0'R NRR IR EDO it5
.}'Dircks//'/84 Dcrlh Ans M....ut HDe..on 3 / /84 g/C/84 g/r/84 1
. i :
n
u
^
s
.p-OVERALL MANAGEMENT E
COORDINATION (NRR)
?
94 %
6,Hg OI Contact dvuq Ss. zb ELD Contact s 7-4 l
Overall Review of
^
Review of Desian Review of Construction Issues and Operation Issues QAAdequacy(CAT)
~
(NRR)
(RegIV)
(IE)~
k u-Gqlaado
'.:.....frew
.,,. g.:,..
-. f*
f r
~ '.. ' ' Irit f4 I! Y
".4 S.*
- *T, J
.e e*
- W.
8 a
a g
O e
l
. ;.+ % ).
4' g
UNITED STATES
'[
fg NUCLEAR REGULATORY COMMISSION e
WASHINGTON, D, C. 20535 f
?
c 6
/
MAR 121934 MEMORANDUM FOR: John T. Collins, Regional Administrator Region IV Barold R. Denton, Director C'4 Off, ice of. Nuclear Reactor Regulation Richard C. DeYoung, Director
- Office of Inspection & Enforcement FROM:
William J. Dircks Executive Director for Operations f
("cJECT:
COMPLETION OF OUTSTANDING REGULATORY ACTIONS ON 1
COMANCHE PEAK AND WATERFORD
)
Construction of the Ccmanche Peak and Waterford facilities is nearing i
cc=pletion. There remain a number of issues that. need to be resolved before the staff can make its Ticensing decisions.
The issues remaining for these plants are quite ccmplex and span more than ene Office.
In order to assure the overall coordination / integration of these issues and to assure issues are. resolved on a schedule to satisfy hearing and licensing decision needs.
i I am directing NRR to manage all necessary NRC actions leading to prompt licensing decisions. Darrell Eisenhut, Director, Division of Licensing, NRR is being assigned the lead responsibility for this activity. He will coordinate the efforts of NRR, IE, and Region.IV, and will coordinste this activity with OI and DELD. Prior to any of the affected Offices undertaking r'.ajor activities (e.c., inspections) or making decisions on these plants, that activity should be concurred in by NRR.
I We are presently in the process of assigning a dedicated senior manager to assist Mr. Eisenhut in the management of these activities.
~he first phase of this program will be the iden-ificatier cf is:Uss neaded to be resolved for each plant pricr to hearing and licensing decisions.
Once the issues have been identified a Program Plan for resolution of each item should be developed and implemented.
The Program Plan should address the scope of the work needed, the identification of the responsible line organization, and the schedule for ccepletion.
In principle, this effort i
will therefore be similar to the effort undertaken regarding the allegation j
review cn Diablo Canycn except that this effort shculd encem; ass all
'f eensing, inspection, hearing, and allegaticn issues, h0lAN~W $
YY I
N
o 2-Each affected Office,will assign a full time senior manager to work with NRR to define,. schedule end cceplete the issues.
I expect these canagers to be identified by each of you within a few days.
All affected offices should provide dedicated resources and give their full support to this effort, to cssure t'nat all. existing issues are expeditiously handled and all new issues are prc ptly provided to NRR so as not to delay the licensing decisions.
In addition, copies of all infomation, documents, depositioris, etc. should be promptTy provided to NRR to ensure a coordinated approach.
I anticipate that the. approach utilized here will'be necessary for a number cf u;tening OL projects, and am directing NRR to take the lead for carrying cut this activity.
e
\\'
Will1.. J. Dircks Executive Director for Operations cc:
G. Cunningham, ELD E. Hayes, OI e
6 e
4 e
dp 0
O 4
t 1
4-t s
s
~
0VERALL MANAGEMENT i
'-COORDINATION (NRR)
+
i t
4 01 Contact i
. U.
ELD Contact o.
1-I Review of Design Review of Construction Overall Review of Issues and Operation Issues QAAdequacy(CAT) u
{
(GRR)
(Reg IV)
(IE),
{
i i
I I
e j
l l
p l
t l
e e
t i
e e
4 e
j
\\
I l.
8 e
?
I e
l l
- o j
t
,,--w..,--
m y,
-e-we---me
,-ve
<e.--y-,m<r.re-e-w---,
y,----m,
,,=,-y---w-e--
wg
-..ee
-,-.,-e,
.r,--,..---e-,--w-r-.
---,-v,