Text
e t
s.
N t
ConstructionTestin Ce Mne 4 /4-83
.. fC/ED y
i g TLu;;.
,;,6 DATE
,6ukJLwr.-n
</ds
- rnw If APPRQvfD TITLE
- gArg j
}f QUALITY ASSURANCE PLAN AUDIT
~
5.1 INTERNAL AUDITS
{'^;
WATERFORD STEAM ELECTRIC STATION UNIT No. 3 85061%.99e50301 g
Pg hDEB4A-55 Revised Paragraphs 6.1.3, 6.6 a), 6.6 k), 6.7 6.9.1, 6.10.2, 6.10.7, Form 5.1-1 and Added H
Paragraph 6.10.8 to Include Client Comments CJ 05/16/03 I
G Complete Revision to Incorporate Client Comments CJ 04/21/33 Complete Revision Including Incor-F poration of Company Name Change CJ 01/31/83 k
I E
Added Paragraphs 6.3 and 6.9 RNI 10/04/78 Revised Paragraphs 6.6 and 6.7; D
Replaced Form 5.1-1 with Form 8-1 RNI 08/29/7 8 EF F ECTIVE DESCRIPTION gy N o,
g 3
=
_. _ _ _ _ _ _... RECORD OF REVISIONS
.m s
l W
,,c.
-l l
w l
d d
g I
I l'
I Revised Paragraphs 6.4, 6.6 C
and 6.7: Added Form 5.1-1 SEK 08/22/77 Procedure Number Changed f rom 5.0 to l
B 5.1: Revised Paragraohs 3.1 and 5.2 SEK I 08/22/77 Revised Paragraph 3.2 and Deleted Paragraph A
6.3 (Renumbered Paragraohs Following 6.3)
SEK 06/07/77
!SEK l11/12/76 0
Issued for Use s
lSv Descriotion Date Rev. No.
<,-r v.,
...y._
~,
a c=
===ne
... _ = _ = =. _... _.
. _.. _. ~ -
AUDIT 5.2 Personnel performing audits shall be qualified and
-r-.
.,.. ~ "
certified in accordance with Procedure 5.2 - Qualifi-cation and Certification of Audit Personnel.
--6.0 PROCEDURE
- -- _..... 6. 1..
Time of Audit
'__- ' I 5.1.1 Audits shall be planned and scheduled by the Quality Assurance / Quality Control Departments.
~~ 6.I.2 A minimum of one (1) audit shall be conducted every
~ ' ' - -
six (6) months.
~~~ ~ - ~ '
- Rev, 6.-1. 3 Additional, audits, when deemed nec.essar.y by. th.e Qual-H ity Assurance Manager or Quality Control
- Manager, shall be conducted:
~^_._. [ ~, ~ [
a) when significant changes are made in the organi:a-tion of the quality system.
I b) when it is suspected that nonconf ormances exist in the Quality Assurance system.
~ " -
c) to verify implementation of required corrective actions.
.. T_ ~
[_
d) at the discretion of the Quality Assurance Manager or Quality Control Manager.
~ ~ " '
61.4 When it is -determined that an additional or reaudit is
- ~ ~ ~ - - - --
required, the following items shall be established.
a)
Date by which the audit is to be accomplished.
b)
Extent of audit.
.. _ _ ___.. -_ (L. L 5 Additional audits or reaudits shall be conducted to
'the same requirements as the original, using the ap-Propriate section(s) of the audit checklist and docu-mented and processed in the same manner as the origi-
" - ~
nal audit.
T NO.
TITLE REY.
PAGE l
5.1 INTERNAL AUDITS H
2 of 8
~
.W
-=
m AUDIT 1.0 SCOPE 1.1 This procedure describes the Internal Audit System to be used where GEO Construction Testing is performing nondestructive examination (NDE) services.
1.2 Radiation Safety Audits are not included in this pro-cedure.
i 2.0 PURPOSE 2.1 To verify conformance to, and implementation of, the total Quality Assurance Plan.
2.2 To establish a numerical rating of the project for comparison 'to previous'and subsequent addits' to' deter-
~
mine improvement or deterioration in the conformance to the Quality Assurance Plan.
3.0 RESPONSIBILITY 3.1 The Quality Assurance Manager is respons ible for the implementation of this procedure.
3.2 Personnel performing Quality Control Audits shall be responsible to the Quality Assurance / Quality Control Departments.
This responsibility shall be either as a direct assignment to said departments or may be granted as a specific assignment by the Quality Assur-ance Department head.
In any case, no person having direct responsibility to an audited system may be used to audit that system.
4.0 REFERENCE - Quality Assurance Program, Section 18.
5.0 GENERAL INFORMATION AND INSTRUCTIONS 5.1 Audits are the means by which management is kept in-formed of the adequacy of the implementation of, and compliance to, the Quality Assurance Plan.
N-..
NO.
TITLE REV.
PAGE 5.1 INTERNAL AUDITS H
1 of 8
G 8 0. m.
t=an,
ca
.. _. - AUD I T EDIIBIT 1 (Front Page)
Rev.
H I
E QUALITY CONTROL AUDIT / INSPECTION
~
Control No.
To:
From:
Date:
Subject:
Report of Quality Control Audit / Inspection
Purpose:
DEFICIENCIES:
None Noted as Shown Below Refer to Attached Audtt' Checklist Ref. No. 5 Description m.
)
Stop Work Order Given: No Yes Resudit Reg'd.
Yes No Corrective Action to be Completed By: Date:
Deficiency Review 4 Acknowledgement By:
i RECOMMENDED CORRECTIVE ACTION:
i Ref. No. 4 Description e
(
QC Mgr. Approval Date Corrective Action Completed 3y:
Date:
Completion Acknowledged:
CC Mgr Date:
Fora No. 5.1 1 NO.
TITLE REY.
PAGE 5.1 INTERNAL AUDITS H
7 of 8
i GEO
~
Camaruchon Tascag AUDIT
. 't i
EXHIBIT 1 (Back'Page)
Rev.
H DEFICIENCIES: (cont'd)
Reference No. 4 Description
.N f.
s RECOMMENDED CORRECTIVE ACTION: (cont'd)
Ref. No. 4 Description 4
i e
- s,
~
NO.
TITLE REV.
PAGE 5.1 INTERNAL NJDITS H
8 of 8
0 GEO ca====== T==no 3
~. - ~... ~
AUDIT Rev.
6.10.2 Approval of any recommended corrective actions.
H 6.10.3 Evaluating adequacy of any required response and ex-tent of investigation.
6.10.4 Assuring corrective and preventive actions are identi-fled and scheduled for each finding.
6.10.5 Confirming that any required corrective and preventive actions are accomplished as scheduled.
6.10.6 Verification that required corrective and preventive actions have been completed.
This shall be accom-plished through written communication, reaudit or other appropriate means.
6.10.6.1 The completions of corrective and preventive actions
.that may be verified by written communication are tho se which do not require on-site, visual examina-
, tion.
Two examples are as follows.
a)
Additional Training of perso nnel A written re-cord of training listing tne required parameters including, but not limited to:
scope of training, training dates, name and signatures of those who received the tra.ining, and signed by the trainer.
i l
b)
Documentation Errors Submittal of copies of the l
corrected documents, reports, etc.
I Rev.
6.10.7 providing written notification to project Manager and l
Client of satisf actory closing of audits in a timely manner.
6.10 7.1 Copies of the completed audit, including related clo-sure material, shall be transmitted to the Client.
Rev.
6.10.8 Signing of the " Completion Acknowledged" on the report H
indicates acknowledgement of completion and acceptar.ce of the corrective actions.
m
.s
. am NO.
TITLE REV.
pAGE 5.1 INTERNAL AUDITS H
6 of 3
...--_----a--
t C-fD -
ca=== nan r==ne
- ~.....
,lj AUDIT
_.6. 8. 1. _
In the event the Auditor and Project Manager cannot
~~
reach a mutual agreement regarding the audit findings and/or recommended corrective actions, the matter shall be resolved by the Quality Review Board.
The findings of the Quality Review Board shall be final and made a part of the audit report.
Note:
The Quality Review Board shall consist of:
a) the Auditor; b) the Project Manager; c) the Quality Assurance or Quality Control Manager;
~
dT the President ~or Vice Prssident.
6.9 Any audit finding (s) requires a written response with-in 30 days.from receipt.
The response shall state the
.results of the review and the extent of any investiga-tion, the corrective actions taken and any actions taken to prevent recurrence.
Objective evidence of the above shall be included in the audit response, as ap-plicable.
Rev.
6.9.1 The response shall be prepared and signed by the Pro-H ject Manager, or a designee approved by the Project Manager, and submitted to the Quality Control Manager.
6.9.2 In the event the necessary corrective and/or preven-tive actions cannot be completed by scheduled comple-tion date, the reasons why and the new completion date shall be requested.
Request and concurrence shall be documented and f orm a part of the audit.
Concurrence is by the Quality Control Manager, request is by the Project Manager.
6.9.3 A follow-up report shall be provided listing the re-quirements of Paragraphs 6.9 and 6.9.1.
0.10 The-Quality Centrol Manager shall be responsible for:
A_10.1 ObtMning written response to audit reports, where ap-plicable.
w.
(-
MO.
TITLE REY.
PAGE 5.1 INTERNAL AUDITS H
5 of 8
%== w c
~ *
--- ~-
m AUDIT 6.2 Audit Checklist 6.2.1 Inte rnal audits shall be performed in accordance with an " Audit Checklist".
All elements of the Quality As-surance plan will be audited.
6.2.2 All of the checklist shall be completely filled out and signed by both the Auditor and the Project Man-ager.
6.2.3 If for some reason a particular segment of the audit checklist does not apply to the project or cannot be performed, the. reason shall be noted on the appropri-ate segment.
6.2.4 Each item of the audit has been as. signed a.per.centage point value'.
These points are granted if t' hat speci-fic item meets the minimum requirements of the Quality Assurance Plan.
No points are allowed for discrepant areas.
6.2.5 The total' value of percentage points for each segment
~
of the audit shall be noted in the appropriate space on the cover sheet.
These totals shall be averaged to obtain the final quality rating of the project. -
6.5 Audit findings shall be ' reviewed with the Project Man-ager prior to final preparation of reports.
6.4 One (1) copy of the audit checklist and one (1) copy of the audit report ( Exhibit 1-Form 5.1-1, Typical) l will be given to the Project Manager.
The original shall be submitted to Corporate Quality Control for review by Executive Management and the Quality Assur-ance Manager.
6.5 Copies -of audits and related documentation shall be on file at the GEO Construction Testing project facility and in the Quality Control Department.
6.6.
Audit results shall be documente d on a " Quality Con-trol Audit / Inspection" report form.
The Auditor shall address the report to the Project Manager and include the following information, as a minimum.
,(
)
L NO.
TITLE REY.
PAGE 5.1 INTERNAL AUDITS H
3 of 8
, _ ~ -
g Cansumenom Tesang a..-...-..
- ~
=%
i AUDIT Rev.
a)
Control No.
Each audit report shall be given a H
i number for documentation traceability purposes.
i It shall cons is t of the project job number and a i
sequential number taken from a log maintained by i
the project for that purpose.
Example:
XXXX-XX Sequential No.
Project Job No.
b)
Date audit completed, l
c)
Purpose of audit, i.e.,
scheduled, reaudit, spe-cial
.e,tc.
d)
Findings, if any.
e-)
Recommended corrective actions.
- .m f)
Stop work order given.
Yes or no.
_,/
g)
Reaudit required.
Yes or no.
h)
Date by which corrective actions must be completed.
Correc' ive actions are to be completed within l
Note:
t l
30 days.
i)
Acknowledgement by Project Manager.
j)
Corrective actions completed by and date.
Rev.
k)
C ompletion acknowledged and approval by Quality H
, Control Manager and date.
Rev.
6.7 All nonconformances and deficiencies shall be pro-H cessed in accordance with Procedure 4.5 Nonconfor-mance and Corrective Action.
l 6.8 Each audit finding is to be reviewed and investigated by the Project Manager to de tehnine the extent of re-quired corrective actions and schedule appropriate cor-l rective actions including actions necessary to prevent recurrence.
3
.s t
NO.
TITLE REV.
PAGE j
5.1 INTERNAL AUDITS H'
4 of 8
-