LP&L PHYSICAL VERIFICATION PROCEDURE COATINGS 1.0 Approval o //4 Prepared By:
/
QA Engineer
/ Dede Approved By:
,M, t
/ /o //J m/
Project QA Engineer
'Dati Approved By:
/-//-#J QA Manager Date 2.0 Purpose The purpose of this procedure is to establish and describ'e the method for performing a uniform and comprehensive review of the physical application of coatings and the documentation supporting the activity.
55 3.0 Scope This task shall include a review of documentation supporting the coatings installation. The task shall be accomplished by field verification to be followed by the documentation review.
4.0 Responsibilities 4.1 Task Leader As directed by 'he LP&L Quality Assurance Manager, the Task Leader t
i v :1 coordinate activities, provide support, and compile data for submitting to the Quality Assurance Manager.
(Pet. Proc. No. QP 19.1) i G
QF 19.1-D3.2 Page 1 of 3 01/07/83 8506150180 850301 PDR FOIA GARDEB4-A-55 PDR I
e 4.2 The Auditor shall be responsible for:
Determining the depth of review and methods for accomplishing a.
review.
b.
Preparing checklists to be used in documenting review.
c.
Obtaining required contractor procedures. drawings, etc.,
needed for performance of review.
d.
Compiling and submitting documented evidence of results of the review to the Task Leader.
5.0 Procedure 5.1 Physical Verification Protective coating applications selected by the Team Leader will be walked down to decennine if they have been installed in accordance with applicable specifications and procedures. The primary document that will be used to perform this task is the Waterford 3 Project
('
Specification LOU 1564.734.5.1. The below listed tools may be needed for application verification:
a.
Dry Film Thickness Taster (Microtester) b.
Sling Psychrometer I
c.
Surface Thermometer d.
Inspection Mirror e.
Flashlight f.
Surface Profile Comparator s-,
QF 19.1-D3.2 Page 2 of 3 01/07/83 O
_e
i 5.2 The walkdown team shall utilize walkdown documentation applicable to r
protective coatings installation and documentation. This documentation shall include specifications, installation records, and other documents and forms required to complete the walkdown.
Walkdown information shall be recorded on Coatings Walkdown Checklist Form D3.2-1A (see attachment).
5.3 Records review and followup records review will be conducted as per paragraph 5.2 of the LP&L Quality Assurance Procedure QP 19.1.
Deficiencies noted will be processed per paragraph 6.0 of QF 19.1.
( t-l QF 19.1-03.2 Page 3 of 3 01/07/83
.