ML20108A854

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Repts for Sept 1984 & Rev 15 to Offsite Dose Calculation Manual & Description of 840826 Challenge to Unit 2 Safety Valves
ML20108A854
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 10/11/1984
From: Haynes J
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
Shared Package
ML20108A856 List:
References
NUDOCS 8411150233
Download: ML20108A854 (1)


Text

L f:y.,9 Southern California Edison Company SCE SAN ONOFRE NUCLE AR GENER A TING ST ATION P.O. Box 12 4 S AN CLEMENTE. C ALIFORNI A 92672 J. G. H A YN E S TatsenON STQTION M AN AGE R (734) 4,2-7700 October 11, 1984 Director Office of Management Information and Program Analysis U. S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Sir:

Subject:

Docket Nos. 50-361/50-362 Monthly Operating Reports for September 1984 San Onofre Nuclear Generating Station, Units 2 and 3 Enclosed are the Monthly Operating Reports as required by Section 6.9.1.10 of Appendix A, Technical Specifications to Facility Operating Licenses NPF-10 and NPF-15 for San Onofre Nuclear Generating Station, Units 2 and 3, respectively.

Additionally, enclosed is Revision 15 of the Offsite Dose Calculation Manual.

In accordance with Section 6.14.2 of Appendix A, this revision was reviewed and found acceptable by the Onsite Review Committee on August 14, 1984.

Also, enclosed is a description of a challenge to Unit 2's safety valves which occurred on August 26, 1984.

Please contact us if we can be of further assistance.

) Sincerely, ba* vin Enclosures cc: F. R. Huey (USNRC Senior Resident Inspector, Units 1, 2 and 3)

J. P. Stewart (USNRC Resident Inspector, Units 2 and 3)

J. B. Martin (Regional Administrator, USNRC Region V)

N 8411150233 841011 PDR ADOCK 05000361 gM 7

R PDR g i