Provides Notification of Completion of Installation of Backup Nitrogen Sys Isolation Check Valves & Test Connections at Facility
ML20055H573
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 07/24/1990
From: Nandy F
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-88-14, TAC-71715, NUDOCS 9007270012
Download: ML20055H573 (2)


Text

.

~

u.

. =

' s

,j"'YW Southem Califomia Edison Company 23 PAMKER STREET q 4HVINE. CALIFOf INIA 92718 July 24,:1990-KR.NANDY TELEPHONE McWJeH, NUCLEAR UCENSING (714) 887 6400 e

i I

t L

U. S. Nuclear Regulatory Commission :

Attention: Document Control Desk; Washington,-D. C. 20555 Gentlemen:

Subject:

Docket No. 50-362 Instrument Air System Modifications.

l San.Onofre Nuclear Generating Station.

Unit 3 (NRC Tac No. 71715) l

References:

1) N'lC Generic Letter 88-14. " Instrument' Air-System Problems Affecting Safety-Related Equipment" 2)

F. R. Nandy (SCE) to Document Control. Desk (NRC) letter 1

dated October 30,--1989-r 3)

L. E. Kokajko (NRC) to Harold B. Ray'(SCE) letter dated November 17, 1989-This. letter provides notification of completion of installation of backup q

nitrogen system-isolation check valves and test connections at San Onofre.

Unit-3.

Reference 1 requested Licensees to perform a design and operations l

verification of their instrument air systems. Southern California Edison (SCE) conducted this review and provided our report to'the.NRC by Reference 2.-

In that report, SCE noted that isolation valves and test connections must be

added to the safety-related nitrogen backup system for the atmospheric dump-valves (ADVs). This modification is required to allow for et,mparison-of the ADV backup nitrogen system check valve leakage with the applicable limit.

SCE committed to complete these modifications for Units 2 and 3 during each unit's -

cycle five refueling outage.

By Reference 3, the NRC concurred with this assessment and requested. notification subsequent to completion of the modifications.

9007270012 900724 PDR ADOCK 05000362 P

PDC flool Il$

' I f

Document Control Desk !

As stated in SCE's letter dated January 17, 1990, the Unit 2 modifications 3

were completed during the cycle five refueling outage which ended on December 8, 1989. This same modification for 'Jnit 3 was completed prior to 1

the end of the recent cycle five refueling outage.

If you have any questions or comments, please let me know.

Very truly yours,

/

cc:

J. B. Martin, Regional Administrator, NRC Region V C. Caldwell, NRC Senior Resident Inspector, San Onofra Units 1, 2 and 3 i