ML20195H156
| ML20195H156 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 06/10/1999 |
| From: | Scherer A SOUTHERN CALIFORNIA EDISON CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20195H160 | List: |
| References | |
| NUDOCS 9906160286 | |
| Download: ML20195H156 (2) | |
Text
-
. ' be SOUllliRN CALIF ORNIA A. Edward Scherer
[
EDISON 2"%
m.
{
An iDISON l%TE RNATION.AL" Company June 10,1999 l
l l
U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 l
Subject:
Docket Nos. 50-361 and 50-362 Monthly Operating Reports for May 1999 San Onofre Nuclear Generating Station, Units 2 and 3 Gentlemen:
Technical Specification 5.7.1.4 of Facility Operating Licenses NPF-10 and NPF-15 for the San Onofre Nuclear Generating Station, Units 2 and 3, respectively, requires Southern California Edison to provide a Monthly Operating Report (MOR) of operating statistics and shutdown experience, including documentation of all challenges to pressurizer safety valves, for each unit. Attachments 1 and 2 provide the subject j
l Monthly Operating Reports for Units 2 and 3, respectively. There were no challenges
)
l to pressurizer safety valves for either Unit 2 or 3.
1 If you have any questions, please contact Mr. Clay E. Williams at (949) 368-6707.
Sincerely, O
.s
,Y
/\\
Attachments I & 2
/
cc:
E. W. Merschoff, Regional Administrator, NRC Region IV L. Raghavan, NRC Project Manager, San Onofre Units 2 & 3 J. A. Sloan, NRC Senior Rosiriant inspector, San Onofre Unit 2 & 3 9906160286 990610 PDR ADOCK 05000361 R
PDR P. O. Ilox 128 San Clemente, CA 92674-0128 949-368-7501 Fux 949-368-7575
f
(
I t
l r
l l
l t
i j
NRC Monthly Operating Report, May 1999 l
l San Onofre Nuclear Generating Station, Unit 2 l
\\
I l
I i
J