ML13304A455

From kanterella
Jump to navigation Jump to search
Forwards Rev 6 to Spent Fuel Pool Reracking Licensing Rept. Encl 1 Lists Summary of Rev 6 Changes & Encl 2 Lists Changes (Insert Pages) to Rev 5 Reracking Licensing Rept
ML13304A455
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 02/16/1990
From: Nandy F
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML13304A456 List:
References
TAC-68308, TAC-68309, NUDOCS 9002270066
Download: ML13304A455 (3)


Text

ACCELERATED D] S BUW11N DEMONSTR&1ON SYSTEM REGULATOR INFORMATION DISTRIBUTION 9TEM (RIDS)

ACCESSION NBR:9002270066 DOC.DATE: 90/02/16 NOTARIZED: NO DOCKET #

FACIL:50-361 San Onofre Nuclear Station, Unit 2, Southern Californ 05000361 50-362 San Onofre Nuclear Station, Unit 3, Southern Californ 05000362 AUTH.NAME AUTHOR AFFILIATION NANDY,F.R. Southern California Edison Co.

RECIP.NAME RECIPIENT AFFILIATION .

Document Control Branch (Document Control Desk)

SUBJECT:

Forwards Rev 6 to "Spent Fuel Pool Reracking Licensing R Rept."

DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: OR Submittal: General Distribution EE NOTES: S RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 LA 1 1 PD5.PD 1 1 KOKAJKO,L. 5 5 INTERNAL: ACRS 6 6 NRR/DET/ECMB 9H 1 1 NRR/DOEA/OTSBll 1 1 NRR/DST 8E2 1 1 D NRR/DST/SELB 8D 1 1 NRR/DST/SICB 7E NRR/DST/SRXB 8E 1 1 NUDOCS-ABSTRACT 1

1 1

1 S

OC/LF-MB=---% 1 0 OGC/HDS2 1 0 01 1 1 RES/DSIR/EIB 1 1 EXTERNAL: LPDR 1 1 NRC PDR 1 1 NSIC 1 1 R

D A

S A

D D

NOTE IO ALL "RIDS" RECIPIENTS:

S PLEASE HELP US TO RE=WASTE! CDNTACT THE DOCUMENTr 0DNTROL DESK, t1 P EXT. 20079) TO ELIMT OUR NAME PRC DISTRFXI N LISTS FOR DOCUMENTS YOU DCN'T NEEDI TOTAL NUMBER OF COPIES REQUIRED: LTTR 27 ENCL 25

Southern California Edison Company 23 PARKER STREET IRVINE, CALIFORNIA 92718 F.R. NANDY February 16, 1990 TELEPHONE MANAGER OF NUCLEAR LICENSING (714) 587-5400 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 Gentlemen:

Subject:

Docket Nos. 50-361 and 50-362 Spent Fuel Pool Reracking (TAC Nos. 68308/9)

Amendment Application Nos. 78 and 64 (PCN-287)

San Onofre Nuclear Generating Station Units 2 and 3

References:

January 18, 1990 letter from Harold B. Ray (SCE) to Document Control Desk (NRC);

Subject:

Same as above This letter provides Revision 6 to the San Onofre Unit 2 and 3 Reracking License Amendment Requests (LAR). Revision 6 includes responses to five NRC questions received during a December 20, 1989 telephone call on the spent fuel pool rack row deletion reanalysis, as well as corrections to several heavy load weights and the addition of four heavy load lifts.

The initial request for this License Amendment was submitted on March 10, 1989. Revision 5, submitted by the above reference, was a stand alone document which incorporated the original LAR, as well as Revisions 1 through 4.

This submittal (Revision 6) includes the following:

1. Enclosure 1: Summary of Revision 6 changes.
2. Enclosure 2: Changes (insert pages) to the Revision 5 Reracking Licensing Report including:

a) Responses to five NRC questions on the rack row deletion analysis.

b) Corrections to several heavy load weights identified during a review of the latest vendor drawings of the single failure proof Temporary Gantry Crane (TGC). The weight increases, which were identified after submittal of Rev. 5 to the Reracking LAR, are the result of finalizing the design of the TGC.

, 900O70066 9216 PDR ADOCK 0.50003 PNU

Document Control Desk February 16, 1990 All load drop calculations affected by the above weight changes have been recalculated and all stresses are within allowables.

c) Four additional potential heavy load lifts over concrete have been evaluated and included in the report to increase flexibility in performance of reracking activities. Load drop calculations have been performed for these potential lifts, and all stresses are within allowables.

With the submittal of the enclosed information, SCE has responded to all NRC requests for information on the Reracking LAR. NRC approval of the Reracking LAR is requested by April 1, 1990 in order for SCE to maintain the current reracking construction schedule and ensure that all reracking activities are completed during Cycle 5 operation for each Unit.

If you have any questions or need additional information concerning the Reracking License Amendment Requests, please let me know.

Very truly yours Enclosures cc: J. B. Martin, Regional Administrator, NRC Region V C. Caldwell, NRC Senior Resident Inspector, San Onofre Units 1, 2 and 3