Responds to NRC 900518 Ltr Re Violations Noted in Insp Repts 50-206/90-10,50-361/90-10 & 50-362/90-10.Corrective Action: computer-based Mgt Sys Will Be Developed to Permit Incoming Revised Info to Be Matched W/Documents Requiring Review
ML18041A222
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 07/31/1990
From: Ray H
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
GL-90-03, GL-90-3, NUDOCS 9008070030
Download: ML18041A222 (6)


Text

Docket Nos.: 50-220 50-410 Niagara Mohawk Power Corporation ATTN: Mr. Lawrence Burkhardt, III Executive Vice President Nuclear 301 Plainfield Road Syracuse, New York 13212 Gentlemen:

Subject:

NRC Region I Combined Inspection Report Nos. 50-220/90-06 and 50-410/90-06 This letter transmits the results of the routine inspection conducted by Messrs. W. Cook, R. Laura, and R. Temps of this office on May 31 through July 12, 1990, at Nine Mile Point Units 1 and 2, Scriba, New York. A summary of the findings was presented to Mr. J. Firlit and other members of your staff at the conclusion of the inspection.

One violation with two examples was identified during this period concerning improper control of equipment status through your Blue Markup control process, and a Notice of Violation (Appendix A) is attached. This violation has been categorized as Severity Level IV according to 10 CFR Part 2, Appendix C (Enforcement Policy). This violation concerns failures of your, staff to main-tain positive contr~1 of system status. It also identifies an incomplete root cause analysis following the May 21, 1990 feedwater pump suction valve event, in that the correction actions did not identify additional Blue Markup con-trolled components which were out of position and were subsequently discovered by the inspectors. We are concerned that the root cause analysis focused on personnel performance and did not evaluate the effectiveness of the tagging process.

We appreciate your cooperation.

Sincerely, ORIGINA'. S!Cf<<:0 6Y:

CURTIS J. COV~'"-'~l!.

I Curtis J. Cowgill, Acting Chief Reactor Projects Branch No. 1 Division of Reactor 'Projects OFFICIAL RECORD COPY CIR 9 MILE 90-06 07/31/90

- 0001.0.0 ~(gl

'~ 0 V8 07 Vt.l'(,

PDii'j <)gi,'.I @i',,c f.i(.> ( ).g ~~t')

'Pl..

Niagara Mohawk Power Corporation J()P 3~ )gag

Enclosures:

1. Appendix A, Notice of Violatio'n
2. NRC Region I Combined Inspection Report Nos. 50-220/90-06 and 50-410/90-06 cc w/encls:

R. Sylvia, Senior Vice President W. Hansen, Manager, Corporate (}'uality Assurance M. Colomb, Unit 2 Superintendent, Operations C. Beckham, Manager, Nuclear equality Assurance Operations R. Abbott, Unit 2 Station Superintendent J. Perry, Vice President, equality Assurance K. Dahlberg, Unit 1 Station Superintendent R. Randall, Unit 1 Superintendent, Operations J. Firlit, Vice President and General Superintendent C. Terry, Vice President Nuclear Engineering and Licensing J. Warden, New York Consumer Protection Branch M. Wetterhahn, Esquire G. Wilson, Senior Attorney Director, Power Division, Department of Public Works, State of New York State of New York, Department of Law Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector State of New York, SLO Designee bcc w/encls:

Region I Docket Room (with concurrenres)

Management Assistant, DRMA (w/o encls)

W. Hehl, DRP J. Wiggins, DRP J. Linville, DRP D. Vito, 'DRP R. Summers, DRP G. Meyer, DRP M. Miller, DRP RE Bellamy, DRSS K. Abraham, PAO (2)

M. Miller, SLO J. Caldwell, EDO R. Capra, NRR R. Martin, NRR OFFICIAL RECORD COPY CIR 9 MILE 90-06 - 0002.0.0 07/25/90

0 Niagara Mohawk Power Corporation JUL 8 ) lggg bcc w/Letter, Violation, and Executive Summary Only:

T. Martin, RA W. Kane, DRA H. Knapp, DRSS W. Hodges, DRS J. Durr, DRS R. Gallo, DRS RI: DRP RI: DRP RI:DRP WCook/meed GMeyer g'Cowgill 7/PS/90 7/W/90 7/gI/90 OFFICIAL RECORD COPY CIR 9 NILE 90-06 - 0003.0.0 07/25/90