Forwards MORs for Apr 1999 for Songs,Units 2 & 3.There Were No Challenges to Pressurizer Safety Valves for Either Unit 2 or 3
ML20206S716
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 05/17/1999
From: Scherer A
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20206S722 List:
References
NUDOCS 9905210203
Download: ML20206S716 (2)


Text

m j

-[pq wummurom A. Med Saun

.' J EDISON =b om, xn unsown,sysriosst- cc.nv.nr May 17,1999.

U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555

Subject:

Docket Nos. 50-361 and 50-362 Monthly Operating Reports for April 1999 San Onofre Nuclear Generating Station, Units 2 and 3 Gentlemen:

Technical Specification 5.7.1.4 of Facility Operating Licenses NPF-10 and NPF-15 for the San Onofre Nuclear Generating Station, Units 2 and 3, respectively, requires Southem California Edison to provide a Monthly Operating Report (MOR) of operating statistics and shutdown experience, including documentation of all challenges to pressurizer safety valves, for each unit. Attachments 1 and 2 provide the subject Monthly Operating Reports for Units 2 and 3, respectively. There were no challenges to pressurizer safety valves for either Unit 2 or 3.

If you have any questions, please contact Mr. Clay E. Williams at (949) 368-6707.

Sincerely,

\ ,

Attachments I & 2 l'

cc: E. W. Merschoff, Regional Administrator, NRC Region IV L. Raghavan, NRC Project Manager, San Onofre Units 2 & 3

-( w&

/

J. A. Sloan, NRC Senior Resident inspector, San Onofre Units 2 & 3 9905210203 990517 ~ 4 PDR ADOCK 05000361 l R

PDR_

P. O. Ilox 128 San Clemente. CA 92674 0128 i 949-368-7501 Fax 949-368-7575

r Attachment 1 NRC Monthly Operating Report, April 1999 San Onofre Nuclear Generating Station, Unit 2 i