ML20206C515
| ML20206C515 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 04/29/1999 |
| From: | Scherer A SOUTHERN CALIFORNIA EDISON CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML13326A230 | List: |
| References | |
| NUDOCS 9905030064 | |
| Download: ML20206C515 (1) | |
Text
.
SOUlHI RN CAtlFORNI A A. Edward Scherer EDISON L2 L m
s-An iDISO%' l%TLIWAllON.4L* Company April 29,1999 U.S. Nuclear Regulatory Commission Att'sntion: Document Control Desk L
Washington, D.C. 20555 Gentlemen:
)
Subject:
Docket Nos. 50-206,50-361 and 50-362 1998 Annual Radiological Environmental Operating Report San Onofre Nuclear Generating Station Units 1,2 and 3 As required by Technical Specification (TS) Section D6.9.1.3 of Unit 1 Facility Operating License DPR-13, and TS Section 5.7.1.2 of Facility Operating Licenses NPF-10 and NPF-15 for Units 2 and 3, respectively, this letter transmits the 1998 Annual Radiological Environmental Operating Report (AREOR) for San Onofre Unit 1 and Units 2 and 3.
1 The AREOR covers the operation of San Onofre Units 1, and 2 and 3 during the calendar year 1998 and includes summaries, interpretations, and analysis of trends of the results of the Radiological Environmental Monitoring Program.
If you require any additional information, please let me know.
i Very truly yours,
/
Enclosure Cou I cc:
E. W. Merschoff, Regional Administrator, NRC Region IV
/
R. A. Burrows, NRC Project Manager, San Onofre Unit 1 L. Raghaven, NRC Project Manager, San Onofre Units 2 and 3 D. B. Spitzberg, Regional Project inspector, San Onofre Unit 1 J. A. Sloan, NRC Senior Resident inspector, San Onofre Units 2 & 3 L. Brown, California Department of Health Services 99o5030064 990429 A
PDR ADOCK 0500o206
~
R PDR P. 0, lk)x 128
[;'j : 3 '.. h b San Cicmente. CA 92674-0128 949-368-7501 Fax 949-368-7575