Rev 19 to VEGP-00350-C, Work Request Program. Supporting Documentation Encl
ML20092G943
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 12/27/1989
From: Kitchens W
GEORGIA POWER CO.
To:
Shared Package
ML20092F288 List: ... further results
References
CON-IIT05-094-90, CON-IIT05-095-001-90, CON-IIT05-095-002-90, CON-IIT05-096-90, CON-IIT5-94-90, CON-IIT5-95-1-90, CON-IIT5-95-2-90, CON-IIT5-96-90, RTR-NUREG-1410 VEGP-00350-C, VEGP-350-C, NUDOCS 9202200404
Download: ML20092G943 (78)


Text

.

o 05-4'{-4O Appf 0v.I y,y,h Vogtl] Electric Conorating Plant Ef0C$Ow'S NO 00350-C NUCLEAR OPERATIONS p,,,,,,,,

o.i.

19 n/o/st una com0N Georgia Power e.v. ~o-I L of >..>

-.#- e gghdI'N

. WORK REQUEST PROGRAM

,,bb n

~

s/$

1.0 PURPOSE This procedure establishes administrative controls for maintenance activities at Vogtle Electric Generating Plant (VEGP).

It provides for identification, control, and documentation of maintenance activities.

Procedure 29402-C, "WPG Work Request Processing" will be used in conjunction with this procedure to complete define the-processing of a work order, 1

2.0 DEFINITIONS 2.1 WORK PLANNING GROUP (WPG) t A group of assigned individuals in the Planning, Scheduling and Work Control section of the Outages and Planning Department that plan, develop, prioritize, schedule, review, evaluate, and maintain history of repairs for Maintenance Work Orders (MWO).

2.2 PREVENTIVE MAINTENANCE (PM)

-Work tasks performed on a predetermined schedule, in accordance with Procedure 20015-C,-" Preventive Maintenance", to maintain equipment reliability.

2.3 PREDICTIVE MAINTENANCE (MP)

Work tasks performed on equipment or components to predetermine failures by obtaining and trending historical data through preventive maintenance, oil analysis, MOVATS, vibration monitoring corrective work orders, etc.

9202200404 920116

-PDR ADOCK 05000424 S

PDR I

  1. AoCEDURE No REvl56oN PAGE No

~*

VECP 00350-C 19 2 of 35 2.4 PLANNED MAINTENANCE Preventive maintenance, predictive maintenance and other work tasks performed on equipment componenes to prevent unexpected failure.

2.5 CORRECTIVE MAINTENANCE Work tasks performed on systems or components to resolve items identified through preventive or predictive maintenance. surveillance, inspections and/or other methods.

2.6

_ WORK REQUEST TAG (WRT)

A three part tag used to identify deficiencies or work required on plant equipment or components, to properly flag equipment in the field and to allow Shift Supervisor (SS)/On-Shif t Operations Supervisor (OSOE) notification of equipment problems.

2.7 WORK ORDER (WO)

When referenced in this procedure the step applies to an MWO and/or SWO.

2.8 MAINTENANCE WORK ORDER (MWO)

A site document used to perform and document raaintenance on plant equipment or components, to ensure specific work controls are identified and the work history is maintained.

2.9 SUPPORT WORK ORDER ~(SWO)

A site document used to request support activities other than those activities encompassed in the maintenance work order program.

Some examples of support activities are-identified in Section 4.1.11, 2.10

_SPECIAL INDICATORS Indicators identified in NPMIS equipment file to flag special requirements for applicable com>onents.

Some examples are critical components (RXTRI?), Technical-

-Specification (TSPEC), Local Leak Rate Test (LLRT),

etc.

l

-.as L

F.-OCEDU AE 8 0 4

  1. Evi5 TON PAGENo VEGP 003$0-C 19 3 of 35 2.11 WALKDOVN SHEET A computer generated form, attached to each MWO or SWO initiated, to identify certain reautrements for MVO or SWO packa manuals, ging.

A planning tool to identify drawings, special requirements, etc.

2.12 EMERGENCY MAINTENANCE Any immediate mandatory maintenance or repair activity that is necessary to enintain safe operation or shutdown capabilities.

2.13 URGENT MAINTENANCE Maintenance that is not as crit.

1 as emergency maintenance but in the opinion of the On-Shift Operations Supervisor is critical to schedule or safety and should be performed during the next 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period.

2.14 CALIBRATION Work tasks performed to compare and adjust equipment and/or instruments to a predetermined reference value, within tolerances.

2.15 SURVEILLANCE Testing performed on a periodic basis to verify and document that structures, systems, and components are functioning proper 1v and should remain in a readiness state capable of fulfilling the intended safety-* elated function.

2.16 FUNCTIONAL TESTS Performance of those steps necessary to determine structures, systems and components function in accordance with predetermined specifications.

Functional tests nay include:

Surveillance tests. ISI tests, ASME Section XI requirenants and inspections in accordance with Procedure 29401-C, " Maintenance Work Order Functional Test".

.o e

=w

'paoccovat No at visios eaos no VEGP 00350-C 19 4 of 35

(

f 2.17 INSPECTIONS Examination, observation or measurement to determine the conformance of materials, supplies, components, i

parts, appurtenances systems, personnel performance, procedures, processes, or structures te predetermined requirements.

2.18 MAINTENANCE HISTORY A written chronological record of work tasks performed on a component from initial turnover to present.

2.19 SUPERVISOR A member of Georgia Power Supervision, foreman and above including a cognizant individual as defined in Procedure 00801-C, " Control of Onsite Contractors".

2.20 CONTPACTOR MAINTENANCE-L Maintenance performed on the plant by personnel selected according to Procedure 00801-C.

s 2.21 AUTHORIZED INSPECTOR An employee of an Authorized Inspection Agency who has qualifications for, and has been properly qualified for e

ASME-Section III Division 1 and ASME Section XI Preservice/ Inservice Inspection.

2.22 SPECIAL REVIEW A review by one of the following:

Plant Review Board

-Fire-Protection Engineer Equipment Qualification Group Technical Suppert Authorized Inspector (AI)

I l-L l'

hh

....,_.,.r-,

-_..,.,_....,-,.m_,,,,

. _ -,. _,, ~. -,.,.,,

._ - - - _ ~. _

e MOCEDURE No R4A$ ion PAGL '4o VECP 00350-C 19 5 of 35 2.21 FIRE PROTECTION PROGRAM COMPONENT Those plant components required by VEGP FSAR 9.5.1 to i

be operational in order to maintain the viability of the Fire Protection Program.

2.22 CRITICAL COMP 0HERTS i

r Components which have been identified by reactor trip (RXTRIP) special indicator in NPMIS to trip the. unit unless special care is taken.

A system, control protection scheme, or component which will c*use,a unit i

trip if it-itself is inadvertently bumped, grounded, shorcad, or misoperated, or if it fails in service.

r 3.0 RESPONSIBILITIES 3.1 MANAGER MAINTENANCE The Manager Maintenance ensures that the Maintenance Program is effectively implemented as follows:

3.1.1 Policies. procedures. and administrative controls are established ar.d updated as necessary.

3.1.2 Work caska are documented and performed in accordance with approved procedures and safe work practicer.

-3.1.3 Iastallation of temporary jumpers and lifting wires in accordance with Procedures 00306-C. " Tem>orary Jumper And Lifted Wire Control" and 20429-C. "Short Term Documentation Of Temporary Jumpers And Lifted Wires".

3.1.4:

Implementation of temporary modifications and hanging tags in accordance with Procedure 00307-C, " Temporary

~

Modifications".

13.1.5 Disposition-of parts / equipment removed-from the plant 1

is performed and documented.

3.1.6 Cleanliness requirements-are established in accordance with Procedures'00254-C. " Plant Housekeeping / Material t

Condition Program" and 20427-C, " Maintenance-Cleanliness And-Housekeeping Control".-

e

".s..-

n-

,-.n,

,-,,.r-.

n....n...

,,..,_,._._._-.-.,n..n,,,,.n,6,.,,n.,,,-~,,-,,,,,,c,

,-nr-

.-,-.--,n-,

,, v, -,, _,,,.,-

i Gractovne no arv+on nos no VEGP 00350-C 19 6 of 35 3.1.7

,An On-the-Job Training (0JT) Program is developed and coordinated with the Training Department.

3.1.8 Mockups, when needed, are set up to_ hold work task I

exposures ALARA.

Mockups are coordinated with Health Physics.

+

3.1.9 Ensure ASME Fection XI Repair and Replacement Program is implemented in accordance with Procedure 20100-C, "ASME Section XI Repair / Replacement Program".

3.1.10 Ensure that a preventive maintenance program is 1

established and implemented in accordance with Procedure 20015-C, " Preventive Maintenance".

3.1.11 Ensure that a predictive maintenance program is

- established and imp"lemented in accordance with Procedure 20016-C, Predictive Maintenance Program".

3.1.12 Nuclear Plant Management Information System (NPMIS) is operational to support all scheduled outage plans and the corrective, planned and surveillance maintenance programs.

i 3.2 MANAGER OPERATIONS A

The Manager Operations ensures that the Maintenance Program is supported as follows:

3.2.1 Operations and maintenance activities are' coordinated I

effectively in accordance with existing plant conditions through the operations representative in the Work Planning Group (WPG).

3.2.2 WRTs are processed during off-normal working hours for emergency maintenance.

3.2.3

. System status is recorded during work tasks when required.

L3.2.4 Clearances are performed for work tasks.

3.2.5-Fire Protection (FP)-Limiting Conditions for Operation (LCO) action statements are impicmented prior to existence of the Limiting Condition to prevent i

violation of FP. operability requirements.

3.2.6 Numbers are assigned for temporary j'ugers and lif ted wires in accordance with Procedure 00306-C, "Temocrary Jumper And Lifted Wire Control".

i v

-.~

MoCEDukENo AEvi$loN PAGE No VEGP 00350-c 19 7 of 35 3.2.7 Functional test requirements may be assigned and/or changed by a qualified SS or OSOS.

3.2.8 All security-related work request are coordinated with the Security Department.

3.2.9 Assigns a VIGP licensed certified Operations Department Representative to authorize work that does not affect plant operations.

3.2.10 Ensures that Unit Shift Supervisor is cognizant of ongoing work on critical components.

3.2.11 Ensures Operations Engineering maintains the critical component List and an updated list is provided to Maintenance Engineering when any changes are made to the List for inclusion into NPMIS.

3.2.12 Transient combustible permits or ignition source permits are issued, as required and that the need for a fire watch has been evaluated.

3.3 MANAGER ENGINEERING SUPPORT (MES)

The MES ensures that the Maintenance Program is supported as follows:

3.3.1 WRTs are initiated for Plant Modification Packages.

3.3.2 Designated work cask procedures are provided for Plant Modification Packages.

3.3.3 Fire Protection post-work reviews, if applicable, are compitted.

3.3.4 Shield plug and blockwall removal evaluation is completed if applicable.

3.3.5 Scaffolding pre-installation reviews, if applicabla, are completed per approved plant procedures for scaffolding control.

3.3.6 Numbers are assigned for Temporary Modifications in accordance with Procedure 00307-C, " Temporary Modifications".

w

,,~

.... _ =.. -..

.., _.. ~..

.. ~..,.. - ~ ~ - - - -, - -,

PAccEDum2No REVIStoN PAGE No VEGP-00350-C 19 8 of 35 i

3.3.7 Engineering Support performs reviews required to-support and improvement work.

Specifically, the HVAC-Supervisor / Duty Engineer completen reviews and grants 4pproval of work activities such as welding and painting in areas.that-can effect exhaust and filtration charcoal beds.

'3.4 WO.PK PLANNING AND CONTROLS SUPERINTENDENT Tius Work Planning and Controls. Superintendent of the Outages and Planning Department ensures that the Maintenance Program is supported as follows:

3.4.1 Work orders receive all requirnd reviews prior to issuing to maintenance.

3.4.2 RWP requests are submitted to Health Physics for work in Radiation Control Areas (RCA) usually 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to' starting work in accordance with Procedure 00930-C,

" Radiation And Contamination Control','..

3.4.3 MWO packages are assembled-f! rom WRT'S.

3.4.4 MWO packages are reviewed upon completion.

'3.4.5 Equipment history records.are maintained, 3.4.6'

-Meintenance activities arn-tracked.

i 3.4.7 Maintenance activities are-accurately reported.

3.4.8 Maintenance work tasks are adequately defined and correctly resolved.

o 3.4.9 MWOLpackages are evaluated to ensure that acceptance criteria is atl.-

. 3. 4.10 -

. Maintenance t ark schedules are established.

~

3. 4.1 t Clearances-are initiated for MWO packages.-

3.4.12 Fire-protect!.on work evaluation ~is-work orders-by qualified personnel. performed on all 3,4.13-Identify MWO.asLcritical component from the reactor trip-possible special indicator-in NPMIS.

3.4.14 Operations Work Planner assigns appropriate-functional 7

test requirements.

t r

.i -.

lPRoCEDURENC AEvtStoN PiGE No VEGP 00350-C 19 9 of 35 3.5 MANAGER PLANT TRAINING AND EMERGENCY PREPAREDNESS The Manager Plant Training And Emergency Preparedness ensures that the Maintenance Program is supported as follows:

3.5.1 The OJT Program is coordinated with the Maintenance Department.

3.5.2 Adequate / training is provided to keep exposures ALARA as required.

3.5.3 Develop Training Programs to meet job qualification recuirements established by the Maintenance Department anc. Outages and Planning P?partment.

3.5.4 Training records are ma'nrer.ed.

3.6 MANAGER HEALTH FHYSICS AND CHEMISTRY The Manager Health Physics /Chemistr? ensures that the Maintenance Program is supported as follows:

3.6.1 ALARA reviews are performed on all Radiation' Work Permit (RWP) requests per Procedure 00930-C, " Radiation And Contamination Control", and Procedure 00910-C, "VEGP ALARA Progran".

3.6.2 HP surveys are performed in a timely manner.

3.6.3 RWPs ars issued per Procedure 43007-C, " Issuance, Use And Control Of Radiation Work Permits" and that proper radiological controls are instituted per 00910-C.

3.6.4 When contacted regarding draining of systems (Section 4.1.23) Chemistry is responsible for:

a.

Evaluating the effect the draining will have on permitted effluent pathways, b.

Inspecting the system to evaluate the effectiveness of the corrosion control program, if time permits.

3.6.5 Provide for initial reviews of MWO's and SWO's.

4 PRoCEDUQE Mo.

RCVISloN PoGE 60 VEGP 00350-C 19 10 of 35 3.7 MAINTENANCE ENGINEERING SUPERVISOR The Maintenance Engineering Supervisor ensures that the Maintenance Program is supported as follows:

3.7.1 Predictive maintenanc4 program work tasks are scheduled, tracked, trended, and evaluated.

3.7.2 Preventive maintenance program is maintained.

Preventive or Predictive MWO's generated are evaluated to ensure train separation for equipnent has been achieved prior to MWO generation.

3.7.3 A welding program is maintained in accordance with Procedure 20110-C, " Weld Control Program".

3.7.4 NPMIS equipment data base is maintained and periodic coordination with the VPG is conducted to determine need for additional fields for outage support activities.

3.7.5 Ensure ASME Section XI Repair and Replacement Program is implemented in accordance with Procedure 20100-C, "ASME Section XI Repair / Replacement Program".

3.8 QUALITY CONTROL SUPERINTENDENT The Quality Control Superintendent ensures that the Maintenance Program is verified as follows:

3.8.1 Inspections, examinations and tests are performed in accordance with Procedure 00201-C, " Quality Control Inspection Program".

t t

3.8.2 MW0s are reviewed for quality requirements.

3.8.3 Monitoring of work tasks is performed.

3.9 MANAGER OUTAGES AND PLANNING The. Manager Outages and Planning ensures planned outage, forced outage, and refueling activities effectively implement planning, scheduling, and maintenance program requirements as follows:

i

PQocEDURE No REVIStoN PAGE No VEGP 00350-0 19 11 of 35 3.9.1 Provides and approves for use all outage planning sequer:e of events prior to schedule distribution and implem:ntation.

3.9.2 Work will be administratively governed by the Plant Administrative. Work Planning, and Outages and Planning procedures.

3.9.3 Work plans, procedures and practices shall be under the Nuclear Operations QA Program.

3.9.4 Work Orders assigned are packaged, planned, and scheduled by the Modifications and Outage Support Group (MOSG) and reviewed and approved by Work Planning Group.

3.10 MODIFICATIONS AND OUTAGE SUPPORT GROUP (MOSG)

SUPERINTENDENT The POSG Superintendent is responsible for certain maintenance support activities and implementing work package, on request.

4.0 INSTRUCTIONS 4.1 WORK REQUEST TAG INSTRUCTIONS 4.1.1 When conditions requiring maintenance are identified all plant personnel are responsible for completing a Work Request Tag (WRT).

(See Figure i for Example) 4.1.2 A WRT may be submitted by any individual requesting maintenance support by completing the applicable portions of the WRT and delivering the WRT to the Support Shif t Supervisor.

l l-w

4 i

~

PROCEDURE No AEVISioN PAGE No VEGP 00350-C 19 12 of 35 4.1.3 When completing the WRT the initiator should give an accurate, concise and complete description of the problem, indications for investigative maintenance, failure description for corrective maintenance, or a summary of the modification / installation for design changes in the problem block.

This narrative should provide a clear description without the need to resort to reference documents, i.e., RER's, FCR's, etc.

4.1.4 If the WRT is to correct an item identified by a DC, NRC or QA Audit Finding or to address a commitment (regulatory or other) the initiator will indicate so by entering the identifying number in the problem block in addition to the problem description and attach a copy of the commitment, DC, etc.

If the WRT was identified during the perfrrmance of a surveillance or an MWO, that document number will be referenced.

4.1.5 If the WRT is to implement a capital budget item, the general work order (GWO) number should be included in the problem block.

4.1.6 The initiator will complete the WRT through the

" originator" line, attach the fielc' copy to the component and deliver the WRT to th.s appropriate shift supervisor or WPG, as appropriate.

I Non-corrective maintenance WRT's may be approved and processed by the WPG.

(Examples are WRT's for DCP implementation, WRTs to perform planned activities to support outage preparation, etc).

If processed by the WPG, the 03erations Work Planning reviewer will complete the reviews and sign the OSOS/SS review block, in lieu of the actions required in section 4.1.7.

NOTES i

WRT's will be hung for items a.

i identified as needing corrective maintenance in the field.

Items that are not physicall missing, y broken, leaking, etc... do NOT require the field cooy WRT to be hung.

Example of this type may be a WRT for a-DCP.

b.

WRT's will NOT be hung on equipment inside the containment.

w

,n-

-,,.a

.-.,-..-c

. - -.. _.. _ ~..

... ~.. _.

.. ~...

.. ~..

PAoCEDUAE No AEvaSloN PAGE No VEGP 00350-C 19 13 of 35 4.1.7 The Shift Supervisor will perform the following:

Evaluate the WRT for op' rational deficiencies which--

~

4.1.7.1 e

require reportabilitv.

(The On-Shift Operations Supervisor (OSOS) will make immediate notification to regulatory agencies and ensure a Deficiency Card is initiated in accordance with Procedure-00150-C.)

4.1.7.2 Evaluate the affect on plant operation and initiate compensatory action as required.

4.1.7.3 Evaluate the WRT for completeness.

If any portion is determined inadequate or. lacking in information, he will contact the initiator and/or return the WRT for clarification.

4.1.7.4 Assign the appropriate priority as defined below:

X - Emergency (Sec. 2.11)

U - Urgent (Sec. 2.12) 1-Safety

-Personnel, Plant Equipment, Public LCO or equipment problem which could require a power reduction within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

Items with a significant impact on plant operation / efficiency.

2-Other LCO's with 7 day or less shutdown requirements.

Items which impact continued plant operation / efficiency or that support surveillances.

3-Other LCO's, other items affecting plant operations / efficiency.

Security, Fire Protection, License Commitments.

4. -

Items affecting plant material enndition.

.5-Items which may be repaired at any time.

4.1.7.6 Indicate associated LCO, Infornation LCO or Fire Protection LCO numbers in spaces provided.

4.1.7.6 Indicate the appropriate mode restraint.

'C3seg

, -. ~

e.,0CEQUxE No.

HEVIStoN PAGE NO VEGP-00350-C.

19 14 of 35 NOTE The mode restraint' evaluation omust be made conservatively.

If a WRT is tiritten for a problem which would not render a component inoperable, it should still be coded as a restraint to the lowest mode for which that component could be required operable.

This ensures a proper evaluation is performed on each WRT immediately prior to a mode change.

(In-progress maintenance activities could render a component temporarily inoperable or completed activities could require performance of a functional test prior to a mode change.)

4.1.7.7 Indicate if the work may be performed at power or t

during a unit outage.

If outage, the highest mode in which the work may be performed should be indicated

-(i.e., I would indicate it is outage but may be performed-in Mode 1 such as a M7WP outage WRT.)

4.1.7.8 Indicat e special conditions - required to ' perform-maintenance by circling the appropriate-2 digit number on the back of the original tag.

4.1.7.9 Approve the WRT by signing and dating the WRT forwarding the original WRT to the Work Planning Group and a copy of the WRT to'the'Enginaering Support Department for information.

4.1.8 The Work Planning Group (WPG) will process the WRT in

-accordance with 29402-C.

e e

t PAOCEDUAE No.

AEVISioN PAGE NO

]

VEGP 00350-C 19 15 of 35 4.1.9 The WPG will determine if the WRT should be processae as a Maintenance Work Order (MWO) or a Support Work Order (SWO).

NOTE Support Work Orders (SWO's) are generally work items that require less planning and/or administrative controls.

4.1.10 The following maintenance activities may be addressed without initiation of a Work Request Tag.

If a VRT is initiated, it will be processed as a Support Work Order requiring minimal review prior to issuance.

4.1.10.1 Replacement of light bulbs, both indication and illumination bulbs.

4.1.10.2 Emergency and exit lighting, plant lighting fixtures and field run non EE580 related cabling.

I 4.1.10.3 Maintenance work on non-plant operational equipment by contractors under a maintenance agreement contract given out in accordance with Procedure 70106-C, Contract Administration".

4.1.10.4 Labor items (pumping out ditches or manhcles, spill cleanup, transporting barrels, shoring, cribbing, etc.)

4.1.10.1 Inking systems on plant chart recorders.

4.1.10.6 Security System Camera adjustments and cleaning as requested by the SNS.

CAUTION Prior to performing any of the following (4.1.10.7 throvnh 4.1.10.24),. notify the Unit Shift Supervisor.

Notification is also required at the start of each shifc, unless the USS indicates otherwise.

4.1.10.7 Installing and/or changing identification" tags except for ASME Code plates and vendor name plates.

m i

.. - _ ~ -., - - --

-,. ~ ~, _ -, -.

PRoCEDUAE Ro-PEVIStoN PAGE NO

~~

VEGP 00350-C 19 16 of'35

_.q-4.1.10.8 Replacement of passive accessories, such as knobs, handles, latches (for non-seismic equipment), lens, covers (except for those reautred for Equipment Qualification), thumb screws, etc.

4.1.10.9 Tightening of pccking on manually operated valves (Motor-and air-operated valve packing adjusreents and repacking a valve require-a WRT and MWO.)

4,1,10.10 Tightening of flanged leaks, fitting leaks, etc. on non-safety +related piping and/or tubing.

4.1.10.11 Instrument calibrations when required by approved plant proendures for instrument calibrations and/or adjustments when performed using approved plant procedures that require SS notification prior to and or completion of the work.

When. performed during maintenance activities other than surveillances, all pertinent documentation shall be transmitted to Document Control _and filed by procedure number.

4.1.10.12 Investigative-type work that assists in the determination of problem identification or description.

Investigative work may include-use of instruments (Fluke meters,-VOM, etc.) but does not include component disassembly, liftad leads or other corrective-type maintenance.

4.1.10.13 Maintenance activities performed'during the performance of approved plant surveillance procedures-providing all the. requirements of this procedure for the maintenance

=

-activity,-such as QC review, Equipment Qualification, parts traceability, etc. are-met.

4.1.10.14 Removal and-reinstallation of threaded pipe caps or hose fittings downstream of drains,-vents, etc.

4.1.10.15 Removal.and reinstallation of blind flanges, gaskets, studs, and nuts on pipe downstream of drains and vents.

(NON-Q SYSTEMS ONLY) 4.1.10.16 Performance of routine lubrication in accordance"with Procedure 20411-C, " Control Of Lubricants".

l 4.1.10.17 Installation and removal of scaffolding in accordance with Procedures 20003-C, " Scaffold Construction And l

Control".

L l

l i

essen

I PAoCEDURE No.-

REvtsto*f PAGE No.

VEGP

'00350-C 19 17 of 35 4.1.10.18 Removal and reinstallation'of insulation in accordance with Procedure 20002-C, " Control Of Insulation-Removal And Installation".

4.1.10.19 Repairs on telecommunications equipment other than Security. Communications equipment.

4.1.10.20 Adjustments of pump packing by qualified maintenance personnel (replacement of' packing will require a WRT and MWO.)

4.1.10.21 Application of sealant to secondary e and piping to stop identifie:' in-leakage.quipment 4.1.10.22 Repairs to doors. (except' fire doors) 4.1.10.23 Repair rework and adjustment of tooling that does not have a permanent plant tag number 4.1.10.24 Work on ancillary buildings such as the Service Building, Administration Building, etc.

4.1.11 Support _ Work Orders (SWO's) are required for the

-following:

i i

4.1.11.1 Facility work such as painting, labeling, work on handrails, lighting systems, etc.

3 4.1.11.2 Spare parts rebuild.

4.1.11.3 Repairs-to fire doors.

'4.1.12 MW0s generated per 4.1.11 will be reviewed as required in accordance with 29402-C.

NOTE Support: Work Orders (SWO's) may or-may not require all reviewfsignneures.

.The Work Planner may~obtain or;N/A-any review as determined appropriate.

ws

PROCEDURE No-REvlSloN P A G E-N O VEGP 00350-C 19 18 of 35 4.1.13 Maintenance will be scheduled and planned so as not to compromise the safety of the plant.

Planning vill consider the possible safety and ALARA consequences of concurrent or sequential maintenance, testing or operating activities.

Equipment required to be operable for the prevailing mode will be available, and maintenance will be performed in a manner such that license limits are not vinlated.

Planning for maintenance will include evaluation of the use of special processes, equipment, and materials in performance of the task, including assessment of potential hazards to personnel and equipment.

4.1.14 Work orders which modify the plant configuration will be processed under the controls of procedure 00400-C

" Plant Design Control".

4.1.15 The WPG will assign the MWO package to the Superviscr/ Foreman of the responsible group for implementation of the work package.

The MWO will be i

packaged in accordance with Procedure 29402-C, "WPG 1

Work Request Processing".

I 4.1.16 When personnel are ready to start work, the individual wili go to the Control Room and obtain authorization to begin work from the applicable Shift Supervisor (SS),

with the following exceptions:

NOTE When investigative type WO work, not under a clearance, is continued beyond one shift the Unit Shift Supervisor shall be notified at the start of the new shift prior to continuing work, unless the USS indicates otherwise.

4.1.16.1 If a WO is security-related and DOES NOT require a clearance, the individual will go to the Supervisor-Nuclear Security - Captain (SNS-CPT) to obtain authorization to begin work.

The SNS-CPT or designee, will sign the WO to authorize work to begin.

4.1.16.2 If a WO is security-related and DOES require a clearance, the individual will go to the Shift Supervisor (SS) who will initial and date the WO and authorire work to begin, in accordance with step 4.1.16.

.m

==-

_ ~ - _

PROCEoVRE No A EvlSloN PAGE No VEGP 00350-C 19 19 of 35 4.1.16,3 If a VO is related to the demin water plant but does not affect the water-making capability of the plant, the 1 (vidual will go to the Chemistry Foreman to

obtaf, thorization to begin work, c;

4.1.16,4' If thei rk Order does not affect plant operation or the loa ' carrying capability of the plant, then the Operations Work Planning representative may approve the WO, These WO's may include but are not limited to fire protection, coatings, structural, heat tracing, work performed in shops, and~other general facility work.

4.1.17

. Authorized Operations personnel will verify that the equipment or system can be released and determine what length of time it may be out of service.

4.1.18 Equipment clearance will be obtained, as necessary, from the SS Clearance And Tagging"per Procedure 00304-C, " Equipment i

prior to beginning work.

4.1.19 If the work task is-in a closed tank, vessel, space, electrical manhole, or room with no ventilation, the individual doing the work, prior to beginning the work task, will contact appropriate personnel per Procedure 00258-C, " Safe Work Procedure For Closed Vessels, Confined Spaces, Wet Locations And Systems",

4.1.20 If the work task impacts a Fire Protection Program component such that a FP LCO will be entered, the SS will ensure that the required LCO actions are implemented prior to the existence of the limiting condition.

4,1.21 The individual foreman / supervisor will designate the appropriate Housekeeping. Zone and/or cleanliness controls in accordance with Procedure 20427-C,

" Maintenance Cleanliness And Housekeeping Control" and

-indicate the requirements-on the WO Form.

4.1.22 Authorization to begin work will be documented on the MWO/SWO by the applicable Shift Supervisor, SNS-CPT Chemistry Foreman, or OPS WPG Rep (See 4.1.16) signing the WO'and the Unit SS issuing a subclearance, as t

required, to the foreman / supervisor responsible for the

work, w,

kg PAoCEDUAE No A EVl$loN.

PAGE No, 3

VEGP

-00350-C.

-19

-20 of-35

~

4.li23 If the work cask requiresidraining of water in Secondary _ systems or subsystems, contact Chemistry Section personnel prior to draining.

For Primary systems / subsystems contact Radweste Section Personnel prior-to draining.

4.'1.24 The: assigned' work crew will:

4,1.24.1 Obtain working copies of procedures as required for P

data-sheets and/or procedures listed or referenced in WO package.

4.1.24.2 Verify clearance boundo.ies.

Notify Control Room when valves are repositioned during maintenance activities.

4.1.24.3 Review the RWP, receive a pre-job or post-job radiological briefing (if required), sign in and out on the RWP, and notify HP.if the-work is suspended _or terminated.

4.1.24.'4

-Notify QC l

.possible,_personne, four hours in advance, if to witness the predetermined step (s).

Work is not to-proceed beyond a QC inspection wi tnes s or-Hold Point unless a waiver has been appro,ved by QC personnel.--Contractor maintenance-activities shall.be worked to their specific QC/QA: procedure where fapplicable.

4'.1.24.5 Observe safe, efficient, and professional work.

practices.

4.1.24 6 Prior to working cnt equipment, chechequipment ID

number to-be;sure the correct equipment is being.

worked.. System draining will be coordinated by Operations.with the HP/ Chemistry Department.

4.1.24.7 --Investigate and; document theLcause of the: malfunction.

Investigations,-inspections, examinations and observations pertinent to= evaluating the causelof the malfunction and/or corrective 1 action will be documented on the Wo.

~

4.'l.24.8 Attach all applicable documents.to-the WO gackage._

-4.1.24.9 Document, on:the--Work Order,Lall work performed during the work activity.

Should additional spWho be required to -properly-document - complex work-performed.. a - Work Order Continuation Sheet (Figure!2) will be used.

If more than one. Continuation-Sheet is used, each-will be sequentially numberedE(in upper-right-corner).

PCh 49, '

i%oCEOunE No.

REVISloN PAGE NO-VEGP 00350-C 19 21 of 35 NOTE If the maintenance required for a particular work order involves more than.one crew, each foreman /

supervisor will sign and date the WO, that their work is complete or as completo as possible (including specific steps of procedure completed) and has been. reviewed and approved prior to the transfer of the WO to the next responsible crew.

4.1.24.10 Document the disposition of replaced equipment / parts and list both the old and new part numbers / serial numbers on the MWO.

4.1.24.11 If warehouse material was required to comalete the work, a check mark will be placed in Block 28.

Material /Equiantent Request (MER) numbers will be recorded in t2e block.

A copy of the MER will be attached-to the Work Order (WO).

Lot, reel,-spool, heat, grade, part, serial numbers, etc.

will be recorded on the WO or the attached MER.

All material removed shall be documented on the work order'with as much information on the item removed, as available.-

4.1.24.12 The.use of bulk materials, such as, thermal overloads, lugs, fittings, packing, etc., shall be controlled in accordance with Procedure 00352-C, " Control of In-Process Materials", unless the quality and traceability of the material can be established bv other means.- The~part number and MIR/MER number 'from the bulk material identification tag.will be written on the Wo.

4.1.25 If all the work required cannot be performed, the vork foreman / supervisor will document, on the WO. why the work could not be completed and sign and date at the end of the description.

P.eturn the WO package to WPG for further evaluation and/or instructions.

The WPG will determine if the WO is to be revised a.

due to a scope and/or intent change or if a new MWO is required.

3_ mus

f',

PsoCEOUM No AEVISloN PAGE No VEGP 00350-C 10 22 of 35 b.

When a revision is required, a revision sheet will be initiated and routed for review in accordance with the instructions for WO revision sheet and Procedure 29402-C, "WPG Work Request Processing".

The WO will then be returned to the field for work c.

to be completed as required.

4.1.26 During maintenance activities on non-safety related critical components or safety-related components, if it is necessary to change the scope or intent of the work, a new WO will be generated or the original will be returned to the WPG for revision to encompass the changed scope or intent.

WPG will determine if a new WO is to be generated or the original WO amended.

The new or revised original WO will be processed in accordance with all previous steps of this procedure.

If a new WO is issued, it will reference the old WO number.

4.1.27 During maintenance activities on non-safety related non critical components, the MWO may be revised by the foreman, as required, to accomplish the required maintenance.

If this is required, the foreman should contact the SS, NSSS, or Chemistry Foreman (as outlined in Step 4.1.16) to inform him that additional work is recuired.

The foreman will clearly document all adc.itional work on the WO.

4.1.28 The job foreman, upon completion of werk, will:

4.1.28.1 Review the applicable documentation for completeness and verify that acceptance criteria for the identified problem has been met if known.

4.1.28.2 Ensure that any unsatisfactory work results or conditions noted during the performance of the work have been documented on the Wo.

4.1.28.3 Ensure that.ne WO is completed, as applicable per 29402-C.

4 1.28.4 Inspect and ensure the work area is returned to the i

level of cleanliness required for the area.

4.1.28.5 Ensure the " Work Request Tag" has been removed from the equipment, and attach the WRT to the Work Order (WO)

'03445

e PROCEDURE Ro AEVISloM PAGE No

~

VEGP 00350-C 19 23 of.5 4

4.1,28.6 Sign and date the appropriate block of the WO after insuring that all blocks that are not applicable are nurked N/A.

4.1.28.7 Ensure that inspections of work are performed, as

required, Inspections are performed during and/or after the a.

work to ensure the quality of the work and compliance with design.

Inspections may be identified and per. formed by qualified individuals as appropriate.

b.

The results of all inspections performed will be documented.

Further action based on results and the documentation will be part of the WO package.

Such documentation may include:

(1)

Quality Control Inspection Reports, (2)

Maintenance Procedure Technical Results, (3)

Instrument Control Calibrations, etc.

4.1.29 QC personnel will perform required insaections and verifications and document on the WO where uppropriate.

NOTE If work was performed and inspection under a contractor's GPC % proved QA/QC Program, the contractor's QA representative will sign and date the WO where appropriate.

4.1.30 When thc review is complete, the WO package will be returned to the WPG where a functional or s requirement will be assigned, if required, pecial test using Procedure 29401-C, " Maintenance Work Order Functional Tests" as a guideline.

After the Functional test is-assigned the WO will be forwarded to the appropriate department to perform the Functional test.

4.1.30.1 If the WO is sent to any department, other than Operations, for the completion of the functional test requirements, that department will complete the functional test in coordination with the SS, or Chemistry, as necessary.

wn

f.

PC2oCEDU AE No REVISloN PAGE No VEGP 00350-C 19 24 of 35 4.1.30.2 If the functional test is acceptable, the person who performed the functional test will sign and date the WO and check the WO SAT and return the WO to WPG.

4.1.30.3 If not acceptable, indicate "UNSAT" on the WO and sign and date.

State the reason for the UNSAT condition in the work performed section of the Wo.

Return the WO to the WPG for revision or generation of a new WRT and WO closure.

NOTES a.

The work can continue en an UNSAT WO by use of a revision.

A WO is not closed until accepted by the SS, SSS, or SNS-CPT (as appropriate).

b.

Special tests on security systems will be performed by a Security Supervisor, or designea, to ensure regulatory requirements are maintained.

4.1.31 When the work task is complete, the WO package will be returned to the SS, SSS or SNS-CPT (as appropriate, see Step 4.1.16) for closecut as follows:

4.1.31.1 If a clearance was required, the equipment clearance, obtained per Procedure 00304-C, " Equipment Clearance And Tagging", will be closed out, if all sub-clearance holders are signed off.

4.1. 31.2 The system / equipment should be restored to normal per the applicable operating procedure as determined by the SS or SSS.

4.1.31.3 Verifying that surveillance, functional, acceptance, inspections and/or special tests are completed, as required, and the Wo is completed as applicable.

'G344$

f, hoCEDunE No PEvlSloN PAGE No VEGP 00350-C 19 25 of 35 NOTE Shield plugs and blockwalls, where required, shall be reinstalled after completion of the functional test or after verification that the functional test does not require access to the component.

4.1.31.4 The WO will be signed by the SS, SSS, or SNS-CPT (as appropriate - see Step 4.1.16), if acceptable.

If not acceptable, the SS, SSS or SNS-CPT will sign, date, and write UNSAT on the WO.

4.1.31.5 The Fire Protection LC0 action may be released provided the condition causing the LCO no longer exists.

4.1.31.6 All of the WO package will be returned to the WPG except Safeguard W0s, which will be returned to Document Control.

4.1.31.7 If related to a security system, ensure that the Security Supervisor has been notified.

L..l.32 WO's with partial work complete 'aay be closed if remaining work to be completed is on equipment / items not requiring an WO or on open PM's verified not to have commitments.

This only voids remaining work and the WO shall document the reason for not compleking remaining tasks, t

4.2 CALIBRATION PROGPAM The preventive maintenance program will determine scope and schedule calibration of instrumentation not covered by Technical Specifications in accordance with Procedure 20015-C, " Prevent Maintenance".

4.2.1 Calibration frequencies will be maintained as part of the program.

4.2.2 Calibration schedule and frequencies may be altered as operating experience is gained and as equipment history is developed.

mus

i f.,

PROCEDURE No.

REvlSloN PAGE No

'VEGP 00350-C 19 26 of 35 4.3 VOIDING WO's 4.3.1 All WO's to be voided will be returned to WPG, with proper documentation on the VO, for evaluation and voiding pe,r Procedure 29402-C, "WPG Work P.equest Processing 4.3.2 Open PM's verifted not to have commitments may be voided with a seitement on the WO noting no commitments identified.

4.4 EMERGENCY MAINTENANCE l

4.4.1 Emergency maintenance may be performed without the issuance or approval of an WO or procedure.

4.4.2 Emergency maintenance will be documented and reviewed promptly af ter comaletion of the work, or as plant conditions permic by use of the WO.

4.4.3 Emergency maintenance will only be authorized by the General Manager - Nuclear Plant, Assistant General Manager - Plant. Operations, OSOS, or their respective designee.

4.4.4 If-time permits, an Emergency WO should be processed per Subsection 4.5.

4.5 EMERGENCY WORK ORDER PROCESSING Under' emergency operating conditions, as determined by

.the On-Shirt Operations Supervisor, (OSOS), where immediate actions are required to protect the health and safety of the public and plant personnel, to protect equipment or prevent deterioration of plant conditions to an unsafe level, maintenance activities may be accomplished without the use of written procedures.

After accomplishing the maintenance work, it shall be documented and given the same degree of review as though preplanned and performed according to written procedure.

Emergency work will be-performed-as outlined.

4.5.1 If the need for an emergency WO arises, as determined by the OSOS or designee, the OSOS or designee will:

4.5.1.1-Notify'on-shift maintenance supervision of the declaration of an energency Wo.

e d

OT-rf pj-9 0 -

NP1111MG-NUCLEAR PLANT MANAGEMENT INFORMATION. SYSTEM ~

03/31/2 NP'000Dra' NAINTENANCE WORK ORDER N N '

$ 0 : 2 4 ',

.pt.nn w epnon r"T PRINTER ID-NEXT PAGE 1 iB8077h00CNTLt*4000AG REP TAS.,4 PRI 3464t G ONC T "U0t DATE 10/30/88 l int.

UNIT 1 SYSTEM STATUS F WORK TYPE C SUB TYPE REF TASKt STATUS' INIT XMIT NUMBER

DATE LOADED 10/30/88 TIME LOADED'16-17+40 JOB NUMBER'X EQ (Y/tO TYPE MAINT-(P/F) P t1UO SAFETY CL ASS '.5-SAFETY /N-t.*0N-SAFETY ) N MPL/ TAG LIST

.TR IND DESC NUC CLS SYSTEri DESC NPRD VEND / MFG DATE CODE

' TECH SPECS LOC:

'P&ID MECH ELEM

['F f

),

bg' MCKET WATER TEMP.

rF e y eCONN.

, e PROBLEM / WORK REQUESTED DESC DURING DIESEL GEN. RUN RECTEV 4

w a 1

MALFUNCTION".

LOCAL INDICATION SHOWED J.W.

TEMPTS. NORMAL.

  • SHOULD WORK UHEN 18807710 IS'UORKED*(SEE PAGE 2 COMMENTS. SMP 9/13/e?)

CONT INITIATOR. CHUCK LADD SUPERVISOR CHUCK LADD DATE REQD UCC: RECEIVED DATE ii/21/89 TEMP MODS.-

EQP-MODE REQD (0/F/N)

REPAIR TAGS UNIT: MODE:REQD (1-6/0/N)

NCR/DR 4 (Y/N) Y NCR/DR ? 1883453 FIRE PROTECT RELATED (Y/N) N SIGNATURE MATL AVAIL (Y/N) Y REJECT-CD/NAME/DT_ _

DCR ? (Y/N) N DCR ?

P2: START-END OUTAGE (Y/N) Y FORCED REFUEL i2-REFERENCE-0 COMPLETE TRANSACTION 7-BK 8-FUD ii-TXT-14-ST HIST / LIST 15-EXIT 17-EOP DTL 18-QUIT 19-REPDT!.

s P

i NPiii2MG NUCLEAR PLANT MANAGEMENT INFORMATI0tl Sv"' "

03/ 31 /'

y.e",-O ^,, S u n MAINTENANCE WORK ORDER (2 0F 8)

NEXT PAGE 2 10:24:(

(FUNC I MWO: i UtD7746100 Ct4 TL; * '. w0AG kEP TASK?

PRI 3464:

DATE 10/30/08 11ME -

UNIT 1 SYSTEM STATUS F WORK TYPE C SUB TYPE SCAFFOLDING IND REQUEST i INSUL ATION IND REQUEST t OP X HP CH SE EL ME IC EN QC 01 SCHD DT END LEAD DISC MAIN RESP FORE MWO CLEAR RE0'D(Y/N) Y t 18900756

_DPT RESP MAINT ICOP RESP SUPV EST WORK DURATH 12.0 FCT COMPLETE WELD PERMIT REQD(Y/N) i RWP REOD':Y/N) N0 FUNC T." r i. Y/ N )

MATL REQ'D (Y/N) Y COMMF.NTS GP25-902346 PO !7000105 MER 016194 (KIT RESERVE i OC HOLD PTS (Y/N) Y OC REVIEW R L HEATER DATE 10/31/

-CRAF1/ COMPLETE MECH N

ELEC N

I&C Y

HP N

CONT N

OTHER N TOTALS RESP FOREMAN DATE SCHED START DATE SCHED END EST CREWSIZE 2

2 EST MANHOURS-0

.0 24.0

.0 0

0 24.0 ESl EXPOSURE ACT CREWSIZE 2

2 ACT MANHOURS

.0

.0 20.0

.0

.0

.0 20.0 AC T EXPOSURE PROC i 22332-C 20429-C LCO (Y/N) N WORK INSTRUCT PEWORK/ REPLACE ANY OF THE SWITCHES AS REQUIRED TO CORRECT MALFUNCTION.

MAINTAIN ZONE IV HOUSEKEEPING CONT COMPLETE TRANSACTION PF7-BACK PF8-FWD PF11-CONT TEXT PFi4-RESERVE LIST PF15-EXIT PFie-0UIT

s NPi150hG

NUCLEAR PLANT MANAGEMENT INFORMATION SYSTEM

' 03/31/*'

NP1.000DM MAINTENANCE. WORK ORDER 10: 24 :( l CORP I:lU-TION bGn TYr'r TN11RUCT PAGE O i

-REV. 1 5/4/89 J S hJ.ILHLH;-

BLK 23:

ADD CALIBRATION OF TEMP SWITCHES PER ATTACHEMNT 41.

NEXT PAGE 01 ENTER NEXT PAGE-OR PFiB PF15-EXIT-PF18-RETURN TO MWO FILE MAINT PF7-BACK PF8-PAGE I:

NPiii3MC NUCLEAR PLor:T M A N AG E r*EN T INFORMATION SYSTEM 03/31/*

NPiOOODM MAINTENANCE WORN ORDER (3 "

7 10 24-(

NEXT PAGE 3 UNC-I MW0t 1890??46 20 CNTLt +iOOOAG REP

.# TKi PRI 3464!

. DA TE 10/.30/ uw lint UNIT 1 SYSTEM Sl A TLIS F UCRK TYPE C SUB r Y+ E REF 1ASKi INITIATION REVIEu OPS JCP DATE 10/31/88 MNT TR DATE 10/31/98 HP MtiU DATE 10/30/88 ENG tiWP DATE $0/31/08 Stil/ tier ? 090!4200 89014163 39014162 SPECIAL REVIEU REQD(Y/N) N SIGNATURE SPC hEV REOD COr*fi DATE RELE ASED FOR WORK 11/03/08 SIGNATURE W RYAN DATE-ACTUAL PEGIN 11/03/t?8 DATE ACTUAL END ii '20/09 DUE DATE EARLY START DATE LATEST END DATE ACT WORK APrLIED 40-60 PSI TO i-TSP-19110.1-TSH-19112 THRU ORFFICE AND HAD rJO PERF'MED EAKS. DIDN'T USE *ROCEDURES 20429-C/22332-C USED VP-2346 DUE i-24-89 riAINT AINED 20t4E IV HOUSEKEEPING ZUNE IV HOUSEKEEPING WAS fiAINTAINED OBTAINED PERMISSION FROM SS (rye ^N) TO BEGIN WORK. REMOVED i TSH19110 6 iTSH191)i FROM SERVICE PROCEDED TU I 6 C SHOP TO CALIBRATE ON BENCH SE 1-UP. OBTAINED AS-FOUND READINGS ON SWIlCHES, BOTH 19110 & 19111 WERE OUT OF AS LEFT TOLERANCEF. BEFORE CALIbRATIONV COULD BE MADE OPERATION S REQUESTED SUITCHS DE RE-INSTALLED. INSTALLED 1TSHi9110 & iTSHi91ii 0 N JACKET WATER HEADER OF DG i A -. USED PROC 22332-C TO TAKE AS FOUNDS, C0r4 T FOREMEN HIS"

SUMMARY

PERSON PERFORMING WORK TIti NEAL DATE COMPLETED 1i/20/89 riAINT FOREMAN SCOTT HAMMOND REVIEW DATE ii/20/89 CORRECTIVE ACTION CODES COMPLETE TRANSACTION PF7-BACK PF8-FWD PF11-CONT TEXT PF15-EXIT PF18-0UIT

c

NPi150MG, NUCLE AR PLAf1T MAMAGEMCflT-INFORt1AT I0tl' SYSTEM 03/31/?

NP1000DM M A I N TD 2M" "T

ORDER 10:24^(

muNT It4U A1 ION COMMENT TYPE FERFORMED W4uE Oi USED THE FOLLOWING TEST EQUIP VP2447-60tGAGE 24-89, VP3081

-FLUKE 2i?0A-1/26/89.VP2444-601 GAGE -i-9-89.

DOTH SWI'K ES REFLECT CURRENT PLANT CONDITIONS. MAINTAINED ZONE IV HOUSEKE.

EPING 110389 WTC PARTS 110388 PGL WROTE DC ti-88-3453 OBTAINED AN ORFICE'UNDER MER 199-6323, DRIL. LED OUT ORFICE WITH A t70 DRILL (VERIFIED WITH A MICROMETER TO EE.028).

VERIFIED THAT THE.028 DRILL WAS LIGHT Irl THE HDLE. OBTAINED THREE NEW CALCON TEMP. SWITCHES FROM N 0. WHSE UNDER MER*G9-6307. ATTEMPTED TO CALIBRA1E SWITCHES USING ATTACHMENT l1.

TWO SWITCHES ARE DEFECTIVE. ONE SWITCH l'AS 2 STRIPPED SCREWS ON THE COVER AND THE OTHER LEAKS AIR AROUND THE COVER AND ARCUND !HE INPUT AIR THREADN. THE THIRD SWITCH IS OUT OF TOLERANCE (AS-FOUND OF 207 PSI). HOWEVER NO ADJUSTMENT 5 WERE

- MADE YET. THE OUT-OF-TOLERANCE SWI TCH IS IN

GEORGE TECHENTINE 5/10/89 NEXT PAGE 01 ENTER NEXT PAGE OR PFi8 PFi5-EXIT PFi8-RETURN TO MWO FILE MAINT PF7-BACK PF8-PAGE l-l l

NPiii4MG NUCLEAR PLANT MANAGEMENr INFCRMATION SYSTEM 03/31/+

NPiOOODM~

MAINTENAf1CE WORK ORDER ( 4 r '~

10:24-(

f xT PAGE 4 M MW0i 18807746 00 CNTLt wiOOOAG REP t i ; ~. ;

PRI 3464!

DAll 10/,$w uu i n t.

U fC. T i S YST Eri PATUS F WORK TYPE L SUP TYPE REF TASKt TYPE OF FAILURE UNIT STATUS AT TIME OF FAILURE CAUSE OF FAILURE hE1 HOD OF DE1ECTION MODE OF FAILURE CAUSE DESCRIPTION CODES EFFECT DN PLANT EFFECT ON SYSTEM INSPECTION PERFORfiED BY DATE

- POST MAINT FUNC TEST CODES METHOD FUNC "EST t40NE REGUIRED PERFORt1ED IN BLOCK 27 DATE FUNCTIONAL TEST ASSIGNED DPT RESP FNTST FUNC TEST PERFORMED BY DATE PROCEDURE:

PR0tES OPERABILITY (Y/N)

METHOD USED 10 t'90VE OPERABILITY SATISFACTORY (Y/N) Y IF UtJSAT CORRECTIVE ACTION NEW MWOl OPERATIONS ACCEPTANCE PY W P DIEHL DATE 11/21/89 OSOS APPROVAL DATE PERFORMANCE TRACKING SCHD BEGIN DATE REPORTED DEGIN DATE SCHD END DATE REPORTED END DATE INITIALS RCN SPECIAL REVIEW COMPLETE (Y/N)

PERFORMED DATE MEETINGt SIGNATURE COMMENTS CLOSE QUT REVIEW BY OC J C HARVEY QC CLOSE DATE 11/21/89 1RANStiITTAL NUMBER 107661 TRANSMITTAL DATE: 11/27/89 COMPLETE-TRANSACTION FF7-PACK PF8-FWD PFi4-LIST PriS-EXIT PF18-0UIT l

l l

L I

-~

NPii15M; NUCLEAR PLANT MANAGEMENT INFORMATION SYSTEM 03/34/o NPiOOODM-hAINTENANCE WORK ORDER 10-24 C u

J EXT PACE FUNC '

MUOi 16807746 00 CNTLt *1000AG REP,,., sh l*r 14646 DaTE 10/30/08 l i n e.

UNIT 1 SYSTEM STATUS F UORK TYPE C SUB [YPE REF TASt*,

MPL/ TAG TR SYS DESCRIPTION LOCATION EOP CL

-ii61905ALB035 16to-ANNUNCIATCR LIGHT PC7 ALB iCP163 e2-1TSH10110-A 2403 DGi JACK UTR HDR OUT 1DP1 61 J -

iTSH191ii

.A 2403 DGi JACK WTR MAIN HDR DUT iDDi 61J iTSH19112 A 2403 DSL GEN 1 JACK UTR MAIN HD iDbi cis t

CURRENT MPL/ TAG PAGE i OF i

NEXT MPL/ TAG PAGE i

COMPLETE TRANSACTION PF7-BACK PFe-FWD PF10-MNTHIST PFi4-LIST PF45-EXIT PF17-EQP DTL PF)S-QUI

NPi i 19eiG NUCLEAR PLANT MANAGEMENT INFORMATION SYSTEM 03/31,c f1PiOOODN f1AINTEff 9tJCE IJORK ORDER ( D

("'

~~

10 c.3 N

NEXT k PAGE 8 Jf4C I fiU0i iG807?46 003 NTLe *'000AG REP En: 3464:

^TE Iwawu6 ilmt Uf4IT 1 SYSTEM STATUS F WORK TYPE C SUB TYPE

- REF T ASi fr 1 ------ ACCOUNT NUMBER---- - --- I.

ANALYSIS PAC

'PE LOCN FERC'SUB WO CODE RC f1 CODE l

01 1

COMPLETE TRANSACTION PF7-BACK MWO PFe-FWD f*WO PF$4-LIST PFi5-EXIT PFIG-QUll I

w.

8

o f-C/ s5;t-fd r

e NP9111MG NUCLEAR ot*"t un"^ r my in goeTFIN SYSTEM 43/31/c NPiOOODM g 1HTr4ANCE UORI' ORDER (1 0F GD lo 20

PRINT UM e nnim pr T PRINTER ID

.Nili'PAGE 3 FLf1L 1 MW0i 1900133D00CriTL4 G

REP YASEt PRI

~4 DATE 3/12/90 TIME -

UNIT i SYSTEM STATUS if WORK TYPE C SUB iYPE REF TASK?

STATUS ~ INIT XM[T NUMBER DATE LOADED 3/15/90 TIhE LDADED 9 25:00 JOB NUNDER EQ tY/N)

- TYPE nAltJ~ (P/F) P nWO SAFETY CLASS / S-SAFETY /N-NON-SAFETY) (J MPL/ TAG LIST TR IND DESC N'iC CLS SYSTEM DESC NPRD VEND / MFG DATE CODE TECH SPECS LOC PI,I D MECH ELEM ELEC CONN PROPLEM/WERP. REQUESTED DESC D/G 1A HIGH PRESSURE STARLING AIR ALARM IS LIT WITH RECEIVER O 239/

ICCA Ut D/G iA. OMCB ALARM g

URT 6154 CCNT

- INITIATOR SN DYER SUPERVISOR GARY MOORE DATE REQD WCC RECEIVED DATE 3/25/90 TEMP MODS EQP MODE REQD (0/F/N)

REPAIR TAGS 06i54 UNIT NODE REOD (1-6/0/N!

NCR/DR t (Y/N) N tlCR/DR - t FIRE PROT ECT-RELATED (Y/N) N SIGNAlVRE MATL AVAILLY/Ni REJECT CD/NAME/DT DER ? (Y/N) N DCR t P2: START END OUTAGE (Y/N) Y FORCED REFUEL 12 REFERENCE D COMPLETE TRANSACTION

'7-PK 9-FWD 11-fX' 14-ST HIST / LIST iS-EXIT 17-EOP DTL 18-DUIT 19-REPDTL i

l s.

6 fJPi i i 2MG NUf{E Ab' PI Atl T Mh". '* f

  • ta t'
  • f ? 'l'f'nfg g )td Tv' f L -- --

Q 3 / t j.e( )

jfJPi o OM ___

If1AINT ENANCE tJORK norm r-t> Or up 6f rT PAGE p 10:20,

Crit 4C I MUO! 1000i?IDv0CHILf, l.,

REP T ASt; t l-R 1 34 Dri1 E 3/12/YO IIMt UN11 i SYSTEM STATUS it' WORK l '/ P E t SUB THE SCAFFOLDING It4D REQUEST INSULATION IND REQUEST ;

OP HP CH SE EL ME JC EN E

0' SCHD D1 3/23/90 END 3 / ? 4.9 LEAD DISC MAIN f'SP FORE OPS CLEM REO' D( Y /N3 N i 1

DPT RESP MAINI I(,0 P RESP SUPV EST WORK DURATN 3.0 PCT CDP'PL E T E IJELD PERMIT REOD(Y/N) N ;

hWP REODt'Y/Ni N :

FUtiC TEST <. f / N )

)

Mall REQ'D <Y/N)

COMMENTS 1

RESERVE !

OC HOL D t?

'Y/N) 4 QC REVIL U TW F FLE MAN DATE 3 / $ 'i ^ !

CRAFT /COPPLETT MECH N

ELEC N

lhC Y

tlP CONT t4 O T!!E R N 10 ? nL S hLl;P FOREMAN TGG DATE SCt"ED START DATE SEHED END

"$1 CREWSilE 2

EST MfNHOURS 0

.0 6.0

,0

.0

.0

_0 EST EXPOSURE ACY CREWN.tZE ACT MANHOURS

.0

.0 3.0

.0

.0

.0

.0 AC1 EXPOSURE PROC ! 22721-C 20429-C LCO (Y/N) N J

WORK

  • CRI REPORTAltLE INSTRUCT INVErrIGATE/RECAL OR REPLACE PRESS. SWITCHES AS REQUIRED TO CLEAR ALAfri CONDITION, RBROSE 3/15/90 ACCURACY PER: AX4AK01-564 MAINTAIN ZONE IV HOUI" KEEPING SE1 POINT PER: iX4AK01-52 RESET FIXED Pr-CX5DTiO1-40 6 30 CONT COMPLETE TRANSACTION PF7-E:ACK PF8-FWD Pri1-CONT TEXT PFi4-RESERVE LIST PFiS-EXIl PF1E-0UIT

r4Pi i

  • 2t1G NUCLEAR N W VNAGENENT I NF r'kra A r I ON S "" -

03/31/(

PAGED 40 ?9 ;

NPiOOODM 4 W ENANCE WORv UkN k

<? nF ii3 NEXT tput I nWut 1900 ' l .9 00 C N I L :

i r,

PEP TASK; FRI 34 DAIL 3/12/YO TIME UNIT i SYSTEM STATUS 1F WORK 1YPE C Sub 1YFE '

SCAFFOLDING IND REQUEST t

!tClOLAT10N IND hEQUES1 1 OP HP CH SE EL ME IC EN CC DT SCHD D1 3/23/90 END 3/24b LEAD DISC MAIN RESI FORE OPS CLEAR h 0 D(Y/N) tl DPT RESP MAINT ICOI RESP SUPV EST WORF DURA 1N 3.0 PCT COMPLETE s

WELD PERMIT REOD(Y/N) k RuP REQD('r/N) Ni FUNC TEST (Y/N) tiATL REQ'D (Y/N)

COMMENTS RESERVE i QC HOLD PTS (Y/Ni N OC rEV.EW 1W FhEEf10t1 Do1E 3 /15 /

  • t CRAF1/ COMPLETE MECH N

ELEC N

16C f

HP r4 CON 1 V

OTHER t1 TOTALS RESP FORCMAN TGG DATE SCHED START DATE SCHED CND EST CREWSIZE 2

EST fiANHOURS

.0 0

6.0

.0

.0

.0 O

EST EXPOSURE ACT CREWSIZE 2

ACT MANHOURS

.0

.0 3.0

.0

.0

.0

.0 ACT EXPOSURE PROC i 22721 C 20429-C LCO (Y/N) N WORK

  • CRI REPORTABLE INSTRUCT INVESTI(, ATE /RECAL OR r % At. PRESS. SWITCHES AS REQUIRED TO CLEAR ALARM CONDITION. RBROSE a i3/90 ACCURACY FER-AX4AK01-564 MAINTAIN ZONE IV HCUSEKEEPING SETPOINT-PERI iX4AK01 RESET FIXED PER: CX5DT101-40 6 CON 1

- COriPLETE TRANSACTION PF7-EACK PFf:-FWD PFii-CONT TEXT PFi4-RESERVE LIST PFiS-EXIT F r i t!-QUl f C

7 NP1i13MG NUCI Ne N ant dM!g r er u t !!a opr4r TON SYST Eri 03/31/t NP'000DM G 'AINTENANCE WORK ORDER (3rm !D 40 78

c TiAI'PAGE 3)

@C. J/12/40 TJnE UNIT i SYS1EM STATUS if WUfG 1YPE C SUb TYiE l I

MWOf i400 TO CNTLi **

G REP 174SK; fR1 34 i.m i t REF T ASW t INITIATION REVIEU l

-UPS JCP DATE 3/16/90

.NNT RDR DATE 3/10/90 HP NMB DATI 3/iS/90 i

ENG KEH DATE 3/15/90 Shl/MER i i

SPECIAL REVIEW REQD(Y/N) N SIGNATURE i

SFC REV REOD COMM l

DATE RELEASED FOR WORK 3/22/90 SIGNA 1URE WD DIEHL DATE ACTUAL PEGIN 3/22/00 DATE ACTUAL END 3/24/90 DUE DA1E EARLY S1AR1 DALE LATEST END DATE ACT WORK OBTA.TNED SS PEkniSSION TO CALIFRATE HIGH AIR PRESSURE ALARM SWITCHES PERF'MED FOUND BOTH SWITCHES OUT OF CAL.

CALIBRATED SWITCHES PER PROCEDURE 2; l 21-C USING VP2585 C/D 6-20-90.

ADJUSTED TO UITHIN LIMITS.

PL ACED SUI i

TCHES PACK IN SERVICE.

PROCEDURE 20429-C NOT USED ZONE IV HOUSEKEEPIN i

G MAINTAINED.

CONI FOREMEN HIST SUr1 MARY-PERSON PERFORMING WORK MICHAEL JOHNSON DATE C0h>8.ETED 3/23/90 MAINT' FOREMAN P LINEBARGER REVIEW DATE 3/24/90

' CORRECTIVE ACTION CODES


...-----.<..-----.------.----------------------------..-l COMPLETE TRANSACTION PF7-PACK FF8-FWD PFii-CONT TEXT f'Fi5-EXIT PF10-QUIT l

5 n

C A

l.

i l

-.. a.....

NPlii4MG NUCLE AR PL ANT MANIMMrHT 9-!"0D" " '

rir ' Al SYSTEM 03/31/5 f4Pi OOODN g f7TENANCE (JORK ORIFe c4 10::b' C Nrx1 PAGE 4) egn e < onn,2-00 CtJTLt **

6 RLP 1Na; PRI 34 g%.

t BATE 3/12/5'O TIME UNIT i SYS1EM STATUS iF WORF. T1PE C SUB IYPE-REF TATKi TYPE OF FAILURE UNIT S14105 AT l!hE OF Fall,URE CAUSE OF FAILURE NETHOD OF DE~EC110N MODE OF FAILURE CAUSE DESCRIPTION CODES EFFECT ON PLANT EFFCCT GU SYSTEri ANSPECTION PERFORMED BY PA1E POST MAINT-Fur 4C 1Eyr CODES METHOD FUNC TEST DATE FUNCTIONAL 1EST ASSIGNED DF T RESP FrJ f S T FUNC 1EST-PERFORMED DV DATE PROCEDUREt PROVES OPERON 1LI!Y (Y/N)

MET HOD USED T O PROVE 01'CRAD1 LIT Y SATISFACTORY (Y/N)

IF UNCAT.CORPECTIVE ACTION NEW MW0i OPERATIONS ACCEPTANCE liY DATE OSOS= APPROVAL DATE PERFORMANCE TRACKING SCHD DEGIN DATE REPORTED DEG1N DATE SCHD END DATE REPORTED END DATE IN111ALS RCN SPECIAL REVIEW COMPLETE (Y/N)

PERFORMED DATE MEETING?

SIGNA 1URE COMMENTS CLO!E OUT REVIEW ltY-QC QC CLOSE DATE TRANSti1TTAL NUMBER TRANSMITTAL DATE:

COMPLETE TRANSACTION PF7-DACK PFO-FWD PFi4-LIST PF15-EXIl PF10-QUIT

r o

~4 NP1915ML NUCLEAR PLA 47 MANAGEMENT INr0Rr4ATION SYST EM OJ/3i/t NP1000DH M41NTENANCE U3RK ORDER (5 0F 0) t o ?! ';

\\

f*EU PAGE 5 F'JNC I MWO? 19001339 00 CNTL: **

G REP TASK!

t'R I 34 1 ATE.3/12/90 TIME UNIT i SYSTEM ST ATUS iF WORK TYPE C Sub fYPE REF 1A!Ki tiPL /T AG TR SYS DESCRIP110N LOCATION C0P Cl 1PSH9052 A 2403 S1ARTING AIR PRESS TRN A

' D (< 1 A'J iPSH9056 A 2403 START.'.NG AIR fRESS TRN A iDbi et)

CURRENT MPL/ TAG PAGE i 0F 1

NEXT MPL/ TAG PAGE i

COMPLETE TRANSACTION FF7-PACK PFB-FWD' ' PFio-MNTHIST PFi4-LIST PFiS-EXIT PFi?-EQP DTL PF18-QUI

~:

....;-a..

.-.~.;__.1-

4 NP111onG rn rt : At< r1aut ManArrerm rnentsm von gygigq 03,e33fo f4N 0000f1 MAINTCt4ANCE UCRK ORDER <n er A to an -

CiJE V1

' AGE r)

~

(Ut4C 1 MW0i 1900i m h./ CNTL G

REP M n r --

"R1 34 LTMt ~ /i uYO 11ME UNIT i SYSTEM STATUS ir WORK TYPE C SUB TYPE a

REF TASKC 1 --- - ---- AC C OUN T N U MI<E R------

ANALYSIS PAC FE LOCN FERC'SUD WO CODE REN COPE 0000 009251 531 00027 000000 0100 000242 ConPLE1E 1RAHSACTION Pr ? - P A C '(

nWO FFB-FWD MWG FF'4-LIST PFiS-EXII IFt8-OUIl I

a l

r I

l i

i t

i.

I..

_..._.._._..~. _ _... _ _.. _ _,. _.,,. _.,,

Of 'id-QD 4

SECTION 6.0 ADMINISTRATIVE CONTROLS s

i b

l-V0GTLE UNITS I & 2

ADMINISTRATIVE CONTROLS 6.1 RESPONSIBILITY 6.1.1 The General Manager - Nuclear Plant shall be responsible for overall plant operation and shall delegate in writing the succession to this responsibility during his absence.

6.1. 2 The General Manager-Nuclear Plant vill annually reissue a directive that emphasizes the primary management responsibility of th onshif t Operations Supervisor (or during his absence from the control room, the individual desig-nated to assume the coramand functions) for safe operation of the plant under all conditions on his shif t and that clearly establishes his command duties.

6.2 ORGANIZATION ONSITE AND OFFSITE ORGANIZATIONS 6.2.1 Onsite and offsite organizations shall be established for plant operation and corporate management, respectively.

The onsite and offsite 1

ceganizations shall include the positions for activities affecting the safety of the nucelar power plant.

a.

Lines of authority, responsibility, and communication shall be

-established and defined for the highest management levels through intermediate levels to and including all operating organization positions.

These relationships shall be documented and updated, as approoriate, in the form of org.:nization charts, functional descrip-tions of departmental responsibilities and relationships, and job descriptions for key personnel positions. 3r in equivalent forms of i

documentation.

These requirements shall be documented in the FSAR.

b.

The General Manager - Nuclear Plant shall be responsible for overall plant safe operation and shall have control over those onsite activities necessary for safe operation and maintenance of the plant.

c.

The Vice President - Nuclear shall have corporate responsibility for overall plant nuclear safety and shall take any measures needed to ensure acceptable performance of the staff in operating, maintaining, and providing technical support to the plant to ensure nuclear safety.

d.

The individuals wbo train the operating staff and those who carry out health physics and quality assurance functions may report to the appropriate o.1 site manager; however, they shall have sufficient i

organizational freedom to ensure their independence from operating pressurest PLANT STAFF

6. 2. 2 The plant organization shall be subject to the following:

Each on-duty shift shall be composed of at least the minimum shift a.

crew composition shown in Table 6.2-1; V0GTLE UNITS - 1 & 2 6-1

ADMIN!51RATIVE CONTROLS PLANT STAFF (Continued) b.

When fuel is in either reactor at laart ene operator licensed on the applicable unit shall be in the control room.

In addition, while either ugit is in MODE 1, 2, 3 ;r i at least one Senior Operator licensed on the applicable unit (s) bhali-De in the control room, c.

An individual

  • who has successfully completed the Initial Technician Training portion of the Health Physics Training Program or its equivalent shall be on site when fuel is in either reactor; d.

All CORE ALTERATION $ shall be observed and directly supervised by either a licensed Senior Operator or licensed Senior Operator limited to fuel Handling who has no other concurrent responsibilities during this ope ~ation; Administrative procedures shall be developed and implemented to limit e.

the working hours of plant staf f in performance of safety-related functions (e.g., licensed Senior Operators, licensed Operators, key Health Physics Technicians, key non-licensed operators, and key maintenance personnel).

Adequateshiftcoverageshallbemainthinedwithoutroutineheavy use of overtime.

The objective shall be to have operating personnel work a nominal 40-hour week while the plant is operating.

(This work week may consist of 12* hour shift schedules.) However, in the event that unforeseen problems require substantial amounts of overtime tu be used, or during extended periods of shutdown for refueling, major maintenance, or major plant modification, on a temporary basis the following guidelines shall be followed:

1.

An individual should not be permitted to work more than 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> straight, extiuding shift turnover time.

2.

An individual should not be permitted to work more than 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> in any ?4-hour period, nor more than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in any 48-hour period, nor more than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in any 7-day period, all excluding shift turnover time.

3.

A break of at least 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> should be allowed between work periods, including shift turnover time.

4.

Extept during extendad shutdown periods, the use of overtime should be considered on an individual basis and not for the entire staff on a shift.

  1. If a single Senior Operator does not hold a Senior Operator's license on both units, two or moro Senior Operators who in combination are licensed as Senior Operators on both units may fulfill this requirement.
  • This individual may be absent for a period of time not to exceed 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, in order to accommodate unexpected absence, provided immediate cction is taken to fill the required position.

V0GTLE UNITS - 1 & 2 6-2 i

r ADMINISTRATIVE CONTROLS PtANT STAFF (Continued)

Any deviation from the above guidelines shall be authorized by the applicable department e merintendent, or higher levels of manage-ment, in accordance with established procedures and with documenta-tion of the basis for granting the deviation.

Controls shall be included in the procedures such that individual excess overtime shall be reviewed monthly by the General Manager - Nuclear Plant or his designee to assure that excessive hours were authorized and that they do not become rcetine.

4 h

1 i

V0GTLE UNITS - 1 & 2 6-2a

, _, ~, _ _.,.

r

. i 1

b r

b t

i, I

r t

t I

r t

i I

FIGURE 6.2 (DELETED)

I r

)

Y h

k

- V0GTLE UNITS - 1 & 2-6-3

I T

4 i

t 4

f t

FIGURE 6.2 (DELETED) t

=

k l

l

~

1-V0GTLE UNITS - 1 & 2-6-4 1+

l

TABLE 6.2-1 HIN1 HUM SHIFT CREW COMPOSITION TWO UNITS WITH A COMMON CON 1ROL ROOH POSITION NUMBER OF INDIVIOUALS REQUIRED TO FILL POSITION BOTH UNITS IN BOTH UNITS IN ONE UNIT IN H0DE 1, 2, MODE 1, 2, 3 H0DE 5 or 6 3, or 4 AND ONE UNIT IN or 4 OR DEFUELED H00E 5 or 6 or DEFUELED 05 1

1 1

SRO 1

none**

1 R0 3*

2*

3*

NLO 3*

3*

3*

STA 1***

none 1***

05 - Operations Supervisor with a Senior Operator license SRO - Individual with a Senior Operator license RO - Individual with an Operator license NLO - Non-Licensed Operator STA - Shift Technical Advisor The shift crew composition may be ons -ss than the minimum requirements of Table 6.2-1 for a period of time not exceed 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> in order to accommodate unexpected absence of on-duty shift crew members provided immediate action i; taken to restore the shift crew composition to within the minimum requirements of Table 6.2-1.

This provision does not permit any shif t crew position to be f

unmanned upon shift change due to an oncoming shift crewman being lat: ur absent.

During any absence of the Operations Supervisor from the control room while either unit is in H0DE 1, 2, 3, or 4, an individual with a valid Senior Operator license shall be designated to assume the control room command function.

During any absence of the Operations Supervisor from the control room while tither unit is in MODE 5 or 6, an individual with a valid Senior Operator license or Operator license shall be designated to assume the control room command function.

  • At least one of the required individuals must be assigned to the designated position for each unit.
    • At least one licensed Senior Operator or Licensed Senior Operator Limited to Fuel Handling who has no other concurrent responsibilities must be present during CORE ALTERATIONS on either unit.
      • The STA position shall be manned in MODES 1, 2, 3, and 4 unless the Operations Supervisor or the individual with a Senior Operator license meets the qualifications for the STA as stated in the Policy Statement on Engineering Expertise on Shift, dated October 28, 1985.

V0GTLE UNITS - 1 & 2 6-5

ADMINISTRATIVE CON. 0LS 6.2.3 INDEPENDENT SAFETY ENGINEERING GROUP (ISEG)

FUNCTION 6.2.3.1 The ISEG shall function to examine plant operating characteristics.

NRC issuances, industry advisories, Licensee Event Reports, and other sources of plant design and operating experience information, which may indicate areas for improving plant safety.

The ISEG shall make detailed recommendations for revised procedures, equipment r.odifications, maintenance activities, operations activities, or other means of improving plant safety to the Vice President-Nuclear.

COMr>SITION 6.2.3.2 The ISEG shall be composed of at least five, dedicated, full-time engineers.

Each shall have a bachelor's degree in engineering or related science and at least 2 years professional level experience in his field, at letst 1 year of which experience shall be in the nuclear field.

RESPONSIBILITIES 6.2.3.3 The ISEG shall be responsible for maintaining surveillance of plant activities to provide independent verification' that these activities are performed correctly and that human errors are reduced as much as practical.

RECORDS 6.2.3.4 Records of activities performed by the ISEG shall be prepared, main-tained, and forwarded each calendar month to the Vice President - Nuclear.

6.2.4 SHIFT TECHNICAL ADVISOR 6.2.4.1 The Shift Technical Advisor shall provide advisory technical support to the Shift Supervisor in the areas of thermal hydraulics, reactor engineering, and plant analysis with regard to the safe operation of the plant.

The Shift Technical Advisor shall have I bachelor's degree or equivalent in a scientific or engineering discipline and shall have received specific training in the respor,.s and analysis of the plant for transients and accidents, and in plant design and layout, including the capabilities of instrumentation and cor;trols in the control room.

  • Not responsible for sign-off function.

V0GTLE UNITS - 1 & 2 6-6

m. _ _. - __

ADMINISTRATIVE CONTROLS 6.3 TRAINING 6.3.1 A retraining and replacemerit training program for the plant staf f shall i

be maintained under the direction of the Plant Training and Emergency Prepared-ness Manager.

Personnel will meet the minimum education and experience recom-mendations of Regulatory Guide 1.8, Revision 2 and, for licensed staff, 10 CFR 55.59 before they are considerad qualified to perform all duties independently.

Prior to meeting the recommendations of Regulatory Guide 1.8, Revision 2, personnel may be trained to perform specific tasks and will be qualified to perform those tasks independently.

Personnel who complete an accredited program which has been endorsed by the NRC 'shall mee, the requirements of the accredited program in lieu of the above.

6.4 REVIEW AND AUDIT 6.4.1 PLANT REVIEW BOARD (PRB)

FUNCTION 6.4.1.1 The PRB shall function to advise the General Manager-Nuclear Plant on all matttrs related to nuclear safety.

COMPOSITION 6.4.1.2 The PRB shall be composed of Department Superintendents or Managers, or supervisory personrel reporting directly to Department Superintendents or Managers from the departments listed below:

Operations Mainteaance Quality Control Health Physics Nuclear Safety and Compliance Engineering Support A senior health physicist is acceptable for the Health Physics Department PRB representative.

The chairman, his alternate and other members and their alternates of the PRB shall be designated by the General Manager-Nuclear Plant.

ALTERNATES 6.4.1.3 No n. ore than two alternates shall participate as voting members in PRB activities at any one time.

MEETING FREQUENCY 6.4.1.4 The PRB shall meet at least once per calendar month and as convened by the PRB Chairman or his designated alternate.

V0GTLE UNITS - 1 & 2 6-7

i ADMINISTRATIVE CONTROLS 4

kESPONSIBILITIES (Continued)

QUORUM 6.4.1.5 The quorum of the PRB necessary for the performance of the PRB responsibility and authority provisions of these Technical Specifications shall consist of the Chairman or his designated alternate and four members including alternates.

AESPONSIBILITIES 6.4.1.6 The PRB shall be responsible for:

a.

Review of 1) procedures which est:blish plant-wide administrative controls to implement the QA pr; gram o, Technical Specifications surveillance program, 2) procedures for changing plant operating modes, 3) emergency and abnormal operating procedures, 4) procedures for effluent releases of radiological consequences, and 5) fuel handling procedures.

b.

Review of 1) programs required by Specification 6.7.4 and changes thereto, and 2) proposed procedures and changes to procedures which involve an unreviewed safety question as per 10 CFR 50.59.

c.

Review of all proposed tests and experiments that affect nuclear safety; d.

Review of all proposed changes to the Technical Specifications; e.

Review of all proposed changes or modifications to plant systems or equipment that affect nuclear safety, including proposed changes to Chapter 16.3 of the Vogtle Final Safety Analysis Report (FSAR);

Investigation of all violations of the Technical Specifications, t

including the preparation and forwarding of reports covering evalua-tion and recommendations to prevent recurrence, to the Vice President-Nuclear and to the Safety Review Board; g.

Review of all REPORTABLE EVENTS; t

h.

Review of plant operations to detect potential hazards to nuclear safety; i.

Performance of special reviews, investigations, or analyses and reports thereon as requested by the General Manager-Nuclear Plant or the Safety Review Board; j.

Review of the Security Plan and implementing procedures and submittal of recommended changes to the General Manager-Nuclear Plant and the Safety Review Board; V0GTLE UNITS - 1 & 2 6-8

ADMINISTRATIVE CONTROLS RESPONSIBILITIES (Continued) k.

Review of the Emergency Plan and implementing procedures and submittal of recommended changes to the General Manager-Nuclear Plant and the Safety Review Board; 1.

Review of any accidental, unplanned, or uncontrolled radioactive release including the preparation of reports covering evaluation, recommendations, and disposition of the corrective action to prevent recurrence and the forwarding of these reports to the Vice President-Nuclear and to the Safety Review Board; m.

Review of changes to the PROCESS CONTROL PROGRAM, the OFFSITE DOSE CALCULATION MANUAL, and the Radwaste Treatment Systems; and n.

Review of the Fire Protection Program and Implementing procedures and submittal of recommended changes to the General Manager-Nuclear Plant.

6.4.1.7 The PRB shall:

a.-

Recommend in writing to the General Manager-Nuclear Plant-approvel or disapproval of items considered under Specification 6.4.1.6a.

through e. prior to their implementation; b.

Render dete vinations in writing with regard to whether or not cach

. item consicoJed under Specification 6.4.1.6a. through f. constitutes an unreviewed safety question; and c.

Provide written notification within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to the Vice President-Nuclear and the Safety Review Board of disagreement between the PRB and the General Manager-Nuclear Plant; however, the General Manager-Nuclear Plant shall have responsibility for resolution of such disagreements pursuant to Specification 6.1.1.

RECORDS 6.4.1.8 The PRB shall maintain written minutes of each PRB meeting that, at a minimum, document the results of all PRB activities performed under the respon-sibility provisions of those Technical Specifications.

Copies shall be provided to the Vice President-Nuclear and the Safety Review Board.

6.4.2 SAFETY REVIEW BOARD (SRB)

FUNCTION 6.4.2.1 The SRB shall function to provide independent review and audit of designated activities in the areas of:

a.

Nuclear power plant operations, b.

N'uclear engineering, V0GTLE UNITS - 1 & 2 6-9

ADMINISTRATIVE CONTR0t$

FUNCTION (Continued)-

[

c.

Chemi:try and radiochemistry, d.

Metallurgy, e.

Instrumentation and control, f.

Radiological safety, g.

Mechanical and electrical engineering, and h.

Quality assurance practices.

The SRB shall report to and advise the Vice President Nuclear on those areas of responsibliity specified in Specifications 6,4.2.7 and 6.4.2.8.

COMPOSITION 6.4.2.2 The SRB shall be composed of a minimum of five persons who, as a group, provide the expertise to review and audit the operation of a nuclear power plant.

The chairman and other members shall be appointed by the Vice President-Nuclear or other such person as he may designate, The composition of the SRB shall meet _the requirements of ANSI N18.7-1976.

ALTERNATES 6>.4.2.3 All alternate members shall be appointed in writing by the SRB Chair-man to serve on a temporary basist however no more than a minority of alter-natesshallparticipateasvotingmembersInSRBactivitiesat-anyonetime.

CONSULTANTS 6.4.2.4 Consultants shall be utilized as Jetermined by the SRB chairman to provide expert advice to the SRB.

MEETING FREQUENCY 6.4.2.5 The SRB shall meet at least once per calendar quart 6r during the initial year of plant operation following fuel loading and at least once per 6 months thereafter.-

QUORUM 6.4.2.6 The quorum of the SRB necessary for the performance of the SRB review and audit functions of these Technical Specifications shall consist of the Chairman or his designated' alternate and at least a majority of the SRB members including alternates. No more than a minority of the quorum shall have line responsibility for operation of the_ plant.

V0GTLE UNITS - 1 & 2 6-10 Amendment No. 20 (Unit 1)

Amendment No.

1-(Unit 2)

.. 7 ADMINISTRATIVE CONTROLS REVIEW

-6.4.2.7 The SRB shall be responsible for the review of:

a.

The safety evaluations for:

(1) changes to procedures, equipment, or systems; and (2) tests or experiments completed under the provision of 10 CFR 50.59, to verify that such actions did not constitute an unreviewed safety question; b.

Proposed changes to procedures, equipment, or systems which involve an unreviewed safety question as defined in 10 CFR 50.59; c.

Proposed tests or experiments which involve an unreviewed safety question as defined in 10 CFR 50.59; d.

Proposed changes to Technical Specifications or these Operating Licenses; Violations of Codes, regulations, orders, Technical Specifications, e.

license requirements, or of internal procedures or instructions having nuclear safety significance; f.

Signif.icant operating abnormalities or deviations from normal and expected performance of plant equipment that affect nuclear safety; g.

All REPORTABLE EVENTS; h.

All recognized indications of an unanticipated deficiency in some aspect of design or operation of structures, systems, or components that could affect nuclear safety; and i.

Reports and meeting minutes of the PRB.

AUDITS 6.4.2.8 Audits of plant activities shall be performed under the cognizance of the SRB.

Each inspection or audit shall be performed within the specified time interval with:

1.

A maximum allowable extension not to exceed 25% of the inspection audit interval.

2.

A total maximum combined interval time for anj 3 consecutive inspection or audit intervals not to exceed 3.25 times the specified inspection or audit interval.

These. audits shall encompass:

a.

The conformance of plant operation to provisions contained within the Technical Specifications and applicable license conditions at least once per 12 months; V0GTLE UNITS - 1 & 2 6-11

A 4

ADMINISTRATIVE CONTROL $

AUDITS (continued) j b.

The performance, training, and qualifications of the entire plant l

staf f at least once per 12 months; c.

The results of actions taken to correct deficiencies occurring in plant equipment, structures, systems, or method of operation that affect nuclear safety, at least once por 6 months; i

d.

The performance of activities required by the Operational Quality Assurance Program to meet the criteria of Appendix B, 10 CFR Part 50, at least once per 24 months; e.

The fire protection programmatic controls including the implementing procedures at least once per 24 months by qualified licensee QA personnel; f.

The fire protection equipment and program implementation at least once per 12 months utilizing either a qualified offsite licensee-fire protection engineer or an outside independent fire protection consultant.

An outside independent fire protection consultant shall be used as:least every third year; g.

The Radiological Environmental Monitoring Program and the results thereof at least once per 12 months; h.

The OFFSITE DOSE CALCULATION MANUAL and implementing procedures at

-least once per 24 months; l

1.

The PROCESS CONTROL PROGRAM and-implementing procedures for processing

.and packaging of radioactive wastes at least once per 24 months; j.

The performance of activities required by the Quality Assurance i

. Program for effluent and environmental monitoring at least once per 12 r nths; k.

The Emergency Plan and implementing procedures (at leat,t once per 12 months);

1.

The Security Plan and implementing procedures (at least once per 12 months).

RECORDS' 16.4.2.9 Records'of SRB activitics shall be prepared, approved, and distributed as indicated below:

a, Hinutes of each SRB meeting shall be prepared, approved, and forwarded to the Vice President-Nuclear within 14 days following each meeting; i

  1. V0GTLE UNI 15 - 1_& 2 6-12

ADMINISTRATIVE CONTROLS RECORDS (Continued) b.

Reports of reviews encompassed by Specification 6.4.2.7 shall be pre-pared, approved, and forwarded to the Vice President-Nuclear within 14 days following completion of the review; and c.

Audit reports encompassed by Specification 6.4.2.8 shall be forwarded to the Vice President-Nuclear and to the management positions respon-cible for the areas audited within 30 days after completion of the audit by the auditing organization.

6.5 REPORTABLE EVENT ACTION 6.5.1 The following actions shall be taken sor REPORTABLE EVENTS:

+

a.

The Commission shall be notified and/or a report submitted pursuant to the requirements of Section 50.72 and Section 50.13 to 10 CFR Part 50, and b.

Each REPORTABLE EVENT shall be reviewed by the PRB, and the results of this review shall be submitted to the SRB and the Vice President-Nuclear.

6.6 SAFETY LIMIT VIOLATION 6.6.1 The following actions shall be taken in the event a Safety limit is violated:

a.

In accordance with 10 CFR 50.72, the NRC Operations Center shall be notified by telephone as soon as practical and in all cases within one hour ifter the violation has been determined.

The Vice President-Nuclear, the SRB, PRB, and the General Manager-Nuclear Plant shall be notified within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

t b.

A Licensee Event Report shall be prepared in accordance with 10 CFR 50.73.

c.

The Licensee Event Report shall be submitted to the Commission in accordance with 10 CFR 50.73, and to the PRB, SRB, the General Manager-Nuclear Plant and the Vice President-Nuclear within 30 days after discovery of the event and the covery of the event.

d.

Critical operation of the affected unit shall not be resumed until authorized by the Nuclear Regulatory Commission.

6.7 PROCEDURES AND PROGRAMS 6.7.1 Written procedures shall be established, implemented, and maintained covering the activities referenced below:

a.

The applicable procedures recommended in Appendix A of Regulatory Guide 1.33, Revision 2 February 1978; i.

V0G1LE UNITS - 1 & 2 6-13

r A(,,JISTRATIVECONTROLS

6. 7 PROCEDURES AND PROGRAMS (Continued) b.

The emergency operating procedures required to implement the require-1 ments of NUREG-0737 and Supplement 1 to NUREG-0737 as stated in Generic Letter No. 82-33; c.

Security Plan implementation; d.

Emergency Plan implementation; e.

PROCESS CONTROL PROGRAM implementation; f.

OFFSITE DOSE CALCULATION HANUAL implementation; g.

Quality Assurance for effluent and environmental monitoring; h.

Fire Protection Program implementation; and i.

Technical Specifications Improvement Program implementation.

(FSAR Chapter 16.3) 6.7.2 Each procedure of 6.7.1 above, and changes thereto, shall be reviewed as set forth in administrative procedures and approvpd by either the General Manager-Nuclear Plant or the department head of the responsible department prior to implementation with the exception of the following which shall be approved by the General Manager-Nuclear Plant:

1) procedures which establish plant-wide administrative controls (which implement the quality assurance program and the Technical Specifica-tions surveillance program),

2) unit operating procedures (UOPs) 3)

emergency operating procedures (EOPs) 4)

abnormal operating procedures (AOPs) 5)

procedures for implementing the security plan, emergency plan, and the fire protection program, and 6) fuel handling procedures.

PRB responsibilities for procedures are delineated in 6.4.1, 6.7.3 Temporary changes to procedures of Specification 6.7.1 may be made provided:

a.

The intent of the original procedure is not altered; b.

The change is approver by two members of the plant management staff, at least one of whom holds a Senior Operator license; and V0GTLE UN!TS - 1 & 2 6-14

ADMINISTRATIVE (.

.ROLS PROCEDURES AND PROGRAMS _(Continued) c.

The change is documented, reviewed in accordance with Specification 6.7.2 and approved by the General Manager-Nuclear Plant or department head of the responsible department within 14 days of implementation.

6.7.4 The following programs shall be established, implemented, and maintained:

a.

Primary Coolant Sources Outside Containment A program to reduce leakage from those portions of systems outside containment that could contain highly radioactive fluids during a serious transient or accident to as low as practical levels.

The systems include the following:

1)

Residual Heat Removal System 2)

Containment Spray System (excluding NaOH Subsystem) 3)

Safety Injection (excluding Boron Injection & Accumulators) 4)

Chemical and Volume Control System (Letdown, Boron Recycle, and Cnarging Pumps) 5)

Post Accident Processing System 6)

Gaseous Waste Processing System 7)

Nuclear Sampling System (Pressurizer steam and liquid sample lines, Reactor Coolant sample lines, RHR sample lines CVCS Demineralizer and Letdown Heat Exchanger sample lines only)

The program shall include the following:

1)

Preventive maintenance and periodic visual inspection requirements, and 2)

Leak test requirements for each system at refueling cycle intervals or less.

b.

In-Plant Radiation Monitoring A program which will ensure the capability to accurately determine the airborne iodine concentration in vital areas under accident conditions.

This program shall include the following:

1)-

Training of personnel, 2)

Procedures for monitoring, and-3)

Provisions for maintenance of sampling and analysis equipment.

c.

Secondary Water Chemistry A program for monitoring of secondary water chemistry to inhibit steam generator tube degradation.

This program shall include:

f V0GTLE UNITS - 1 & 2 6-15

..~.

~ _

i l

ADMINISTRATIVE CONTROLS f

PROCEDURES AND PROGRAMS (Continued) i i

1)

Identification of a sampling schedule for the critical variables and control points for these variables, 2)

Identification of the procedures used to measure the values of the critical variables, i

3)

Identification of process sampling points, 4)

Procedures for the recording and management of data, 5)

Procedures defining corrective actions for all ofd-control point chemistry conditions, and j

6)

A procedure identifying:

(a) the authority responsible for the interpretation of the data, and (b) the sequence end timing of i

administrative events required to initiate corrective action.

d.

Post-Accident Samplina.

A program which will ensure the capability to obtain and analyze reactor coolant, radioactive iodines and particulates in plant gaseous effluents, and containment atmosphere samples under accident r

conditions.

The program shall include the following:

1)

Training of personnel, t

2)

Procedures for sampling and analysis, and 3)

Provisions for maintenance of sampling and analysis equipment, i

e.

A program which will ensure the capability to monitor plant variables and systems operating status during and following an accident._ This program shall include those instruments provided to indicate system operating status and furnish Gnformation regarding_the release of radioactive materials (Category 2 and 3 instrumentation as defined in Regulatory Guide 1.97 Revision 2) and provide the following:

1) prevotive maintenance and periodic surveillance of instrumentation.

2) pre planned operating procedures ~and back-up instrumentation to be used if one or more monitoring instruments become inoperable.

3) administrative procedures for returning inoperable instruments to OPERABLE status as soon as_ practicable.

V0GTLE UNITS - 1 & ?

6-16 a..-.-

z =.

ADMINISTRATIVE CONTROLS 6.8 REPORTING REQUIREMENTS ROUTINE REPORTS 6.8.1 In addition to the applicable reporting requirements of Title 10, Code of Federal Regulations, the following reports shall be submitted to the Regional Administrator of the Regional Office of the NRC unless otherwise noted.

STARTUP REPORT 6.8.1.1 A summary report of plant startup and power escalation testing shall be submitted following:

(1) receipt of an Operating License, (2) amendment to the license involving a planned increase in power level, (3) installation of fuel that has a different design or has been manufactured by a different fuel supplier, and (4) modifications that may have significantly altered the nuclear, thermal, or hydraulic performance of either unit.

The initial Startup Report shall address each of the startup tests iden-tified in the Final Safety Analysis Report and shall include a description of the measured values of the operating conditions or characteristics obtained during the test program and a comparison of these values with design predictions and specifications.

Any corrective actions that were required to obtain satis-factory operation shall also be described.

Any additional specific details required in license conditions based on other commitments shall be included in this report.

Subsequent Startup Reports shall address startup tests that are necessary to demonstrate the acceptability of changes and/or modifications.

Startup Reports shall be submitted within:

(1) 90 days following comple-tion of the Startup Test Program, (2) 90 days following resumption or commence-ment of commercial power operation, or (3) 9 months following initial criticality, whichever is earliest.

If the Startup Report does not cover all three events (i.e., initial criticality, completion of Startup Test Program, and resumption or conaencement of commercial operation), supplementary reports shall be submitted at least every 3 months until all three events have been completed.

ANNUAL REPORTS **

6. 8.1. 2 Annual Reports covering the activities of the plant as described below for the previous calendar year shall be submitted prior to March 1 nf each year.

The initial report shall be submitted prior to March 1 of the year following initial criticality.

Reports required on an annual basis shall include:

a.

A tabulation on an annual basis of the number of plant, utility, and other personnel (including contractors) receiving exposures greater than 100 mrea/yr and their associated man-rem exposure according to work and job functions" (e.g., reactor operations and

  • This tabulation supplements the requirements of $20.407 of 10 CFR Part 20.

l

    • A single submittal may be made for Units 1 and 2.

The submittal should combine those sections that are common to both units at the plant.

i V0GTLE UNITS - 1 & 2 6-17 i

,=

I ADMINISTRATIVE CONTROLS ANNU_AL REPORTS (Continued) surveillance, inservice inspection, routine maintenance, special maintenance [ describe maintenance), waste processing, and refueling).

The dose assignments to various duty functions may be estimated based on pocket dosimeter, thermoluminescent dosimeter (TLD), or film badge measurements.

Small expesures totalling less than 20% of the indiridual t

total dose need not be accounted for.

In the aggregate, at least 80%

of the t0101 whole-body dose received from external sources should be assigned to specific major work functions; b.

The results of specific activity analyses in which the primary coolant exceeded the limits of Specification 3.4.8.

The following information shall be _ included:

(1) Reactor power history starting 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> prior to the first sample in which the limit was exceeded (in graphic and tabular format); (2) Results of the last isotopic analysis for radio-iodine performed prior to exceeJing the limit, results of analysis while limit was exceeded and results of one analysis after the radioiodine activity was reduced to less than limit.

Each result should include date and time of sampling and the radiotodine concentrations; (3) Clean-up flow history starting 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> prior to the first sample in which the limit was exceeded; (4) Graph of the I-131 concentration (pCi/gm) and one other radioldine isotope concentration (pCi/gm) as a function of time for the duration of the specific activity above the steady-state level; and (5) The time duration when the specific activity of the primary 'aolant exceeded the radiciodine limit, A report shall be prepared and submitted to the commission on an annual c.

basis if sealed source or fission detector leakage tests reveal the presence of greater than or equal to 0.005 microcuries of removable contamination.

ANNUAL RADIOLOGICAL ENVIRONMENTAL SURVEILLANCE REPORT ***

6. 8.1. 3 Routine Annual Radiological Environmental Surveillance Reports covering activities of the Radiological Environmental Monitoring program during the previous calendar year shall be Lubmitted prior to May 1 of each year.

The initial report shall be submitted prior to May 1 of the year followir; initial criticality and shall include copies of reports of the preoperational Radiological Environmental Monitoring Program of the plant for at least two years prior to initial criticality.

The Annual Radiological Environmental Surveillance Report shall include summaries, interpretations, and an analysis of trends of the results of the radiological environmental surveillance activities for the report period, in-cluding, as appropriate, a comparison with preoperational studies, with opera-tional controls, and with previous environmental surveillance reports, and an assessment of any observed impacts of plant operations on the environment.

The report shall also include the results of the Land Use Census required by Specification 3.12.2.

      • A single submittal may be made for Units 1 and 2.

V0GTLE UNITS - 1 & 2 6-18

. - ~ -. -

ADMINISTRATIVE CONTROLS ANNUAL RADIOLOGICAL ENVIRONMENTAL SURVEILLANCE REPORT (Continued)

The Annual Radiological Environmental Surveillance Report shall include the results of analysis of all radiological environmental samples and of all i

environmental radiation measurements taken during the period pursuant to the locations specified in the table and figures in the Offsite Dose Calculation Manual, as well as summarized and tabulated results of these analyses and measurements in the format of the table in the Radiological Assessment Branch Technical Position, Revision 1, November 1979.

The radiological level of radionuclides which are naturally occurring not included in the plant effluents need not be reported.

In the event that some individual results are not avail-able for inclusion with the report, the report shall be submitted noting and explaining the reasons for the missing results.

The missing data shall be submitted as soon as practicable in a supplementary report.

The report shall also include the following:

a summary description of the Radiological Environmental Monitoring Program; at least two legible maps covering all sampling locations keyed to a table giving distances and directions from a point midway between the two reactors; the results of licensee partici-pation in the Interlaboratory Comparison Program and the corrective action taken if the specified program is not being performed as required by Specification 3.12.3; reasons for not conducting ~the Radiological Environmental Monitoring Program as required by specification 3.12.1, and discussion of all deviations from the sampling schedule of Table 3.12-1; discussion of environ-mental sample measurements that exceed the-reporting levels of Table 3.12-2 but are not the result of plant effluents, pursuant to ACTION b. of Specifica-tion 3.12.1; and discussion of all analyses in which the LLO required by Table 4.12-1 was not achieved.

SEMIANNUAL RADIOACTIVE EFFLUENT RELEASE REPORT 6.3.1.4 Routine Semiannual Radioactive Effluent Release Reports covering the operation of the unit during the previous 6 months of operation shall be submitted within 60 days after January 1 and July 1 of each year.

The period of the first report shall begin with the date of initial criticality.

The Semiannual Radioactive Effluent Release Reports shall include a summary of the quantities of radioactive liquid and gaseous effluents and solid waste released from the unit as outlined in Regulatory Guide 1.21, " Measuring, Evalua-ting, and Reporting Radioactivity in Solid Wastes and Releases of Radioactive Materials in Liquid and Gaseous Ef fluents f rom Light-Water-Cooled Nuclear Power flants," Revision 1, June 1974, with data summarized on a quarterly basis fol-icwing the format of Appendix B thereof.

For solid wastes, the format for

= Table 3 in Appendix B shall be supplemented with three additional categories:

ciass of solid wastes (as defined by 10 CFR Part 61), type of container (e.g., LSA, Type A, Type B, large Quantity) and SOLIDir! CATION agent or absor-bent (e.g., cement, urea formaldehyde).

The Semiannual Radioactive Effluent Release Report to be submitted witnin 60 days after January 1 of each year shall include an annual summary of hourly V0GTLE UNITS - 1 & 2 6-19

ADMINISTRATIVE CONTROLS SEM1 ANNUAL RADIDACTIVE EFFLUENT RELEASE REPORT (Continued) meteorological data collected over the previous year.

This annual summary may be either in the form of an hour-by-hour listing on magnetic tape of wind speed, wind direction, atmospheric stability, and precipitation (if measured), or in the form of joint frequency distributions of wind speed, wind direction, and atmospheric stability.* This same report shall include an assessment of the radiation doses due to t5e radioactive liquid and gaseous effluents released from each unit during the previous calendar year.

This same report shall also include an assessment of the radiation doses.from radioactive liquid and gaseous effluents to MEMBERS OF THE PUBLIC due to their activities inside the SITE BOUNDARY (Figure 5.1-1) during the report period.

All assumptions used fn making these assessments, i.e., specific activity, exposure time, and location, shall be included in these reports.

Historical annual average.teteorological condi-tions or the meteorological conditions concurrent with the time of release of radioactive materials in gaseous effluents, as determined by sampling frequency and measurement, shall be used for determining the gaseous pathway doses.

The assessment of radiation doses shall be performed in accordance with the methodology and parameters in the OFFSITE DOSE CALCULATION MANUAL (00CM).

The Semiannual Radioactha Effluent Release Report to be submitted within 60 days after January 1 of each year shall also include an assessment of radiation doses to the likely most exposed MEMBER OF THE PUBLIC from reactor releases and other uranium fuel cycle sources within 8 km, including doses f rom primary effluent pathways and direct radiation, for the previous calendar year to show confnrmance with 40 CFR Part 190, " Environmental Radiation Protection Standards for Nuclear Power Operation." Acceptable methods for calculating the dose contribation from liquid and gaseous effluents are given in Regulatory Guide 1.109, Rev. 1, October 1977.

The Semiannual Radioactive Effluent Relcase Reports shall include a list and description of unplanned releases from the site to UNRESTRICTED AREAS of radioactive materials in gaseous and liquid effluents made during the reporting period.

The Semiannual Radioactive Effluent Release Reports shall include any changes made during the reporting pericd to the PROCESS CONTROL PROGRAM (FCP) and to the 0FFSITE DOSE CALCULATION MANUAL (ODCM), pursuant to Specifica-

- tions 6.12 and 6.13, respectively, as well as any major change to Liquid, Gaseous, or Solid Radwaste Treatment Systems pursuant to Specification 6.14.

It shall also include a listing of new locations for dose calculations and/or environmental monitoring identified by the Land Use Census pursuant to Speci-fication 3.12.2.

  • In lieu of submission with the Semiannual Radioactive Effluent Release Report, the licensee has the option of retaining this summary of required meteorolo-gical data on site in a file that shall be provided to the NRC upon request.

i l

V0GTLE UNITS - 1 & 2 6-20

ADMINISTRATIVE CONTROLS SEMI AMD.

RADIOACTIVE EFFLUENT RELEASE REPORT (Continued) l da The Semiannual Radioactive Effluent Release Reports shall also include v

Howing:

an explanation as to why the inoperability of liquid or gaseous 4

efeit rit monitoring instrumentation was not corrected within the time specified in :,p w ification 3.3.3.9 or 3.3.3.10, respectively; and description of the t'

events leading to liquid holdup tanks or gas storage tanks exceeding the

" 8 tr *f. Speci fication 3.11.1.4 or 3.11.2.6, respectively.

UPATING REPORTS ine reports of operating statistics and shutdown experience, c

_i s :umentation of al' challenges to the PORVs or safety valves, J

emitted on a monthly basis to the Director, Office of Resource

1an

, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555, with a cc;.

7 Regional Administrator of the Regional Office of the NRC, no luter

'than

't ih of each month following the calendar month covered by the repnrt.

Radial PEAslNG TACTOR LIMIT REPORT

b. s. l. 6 The F limits for RATED THERMAL POWER (F

) shall be established xy xy for at least each reload core and shall be maintained available in the Control Room.

The limits shall be established and implemented on a time scale consistent with normal procedural changes.

The analytical methoos used to generate the F limits shall be those xy previously reviewed and smroved-by the NRC*,

If changes to these methods are deemed necessary they n be evaluated _in accordance with 10 CFR 50.59 and submitted to the NRC for review and appraal prior to their use if the change is determir.ed to involve an unreviewed s'.fety question or if such a change would require amendnient of previously submitted documentation.

A report containing the F limits for all core planes containing Bank "D" xy control rods and all unrodded core planes along with the plot of predicted ThP vs axial core height (with the limit envelope for comparison) shall be rel prcvided to the NRC Document Control desk with copies to the Regional Adminis-tu tor.and the Resident Inspector within 30 days of their implementation.

dC,lALREPORTS 6.8,2 Special reports shall be submitted to the Regional Administrator of the Regional Office of the NRC within the time period specified for each report,

.i

%3? 03Esb " Power Distribution Control and Load Following Procedures" and WCAP

'J272. ' "Westi :ghouse Reload Safety Evaluation Methodology. "

i

..V0GTLE utnTS 1 & 2 6-21 1

ADMINISTRATIVE CONTROLS 6.9 RECORD RETENTION 6.9.1 In additica to the applicable record retention requirements of Title 10, Code of Federal Regulations, the following records shall be retained for at least the minimum period indicated.

6.9.2 The following records shall be retained for at least 5 years:

a.

Records and logs of plant operation covering time interval at each power level; b.

Records and logs of principal maintenance activities, inspections, repair, and replacement of principal items of equipment related to nuclear safety; c.

All REPORTABLE EVENTS; d.

Records of surveillance activities, inspections, and calibrations required by these Technical Specifications; e.

Records of changes made to the procedures required by Specification 6.7.1; f.

Records of radioactive shipments; g.

Records of sealed source and fission detector leak tests and results; and h.

Records of annual physical invGntory of all sealed source material of record.

6.9.3 The following records shall be retained for the duration of the plant Operating License:

a.

Records and drawing changes reflecting plant design modifications made to systems and equipment described in the Final Safety Analysis Report; b.

Records of new and irradiated fuel inventory, fuel transfers, and assembly burnup histories; c.

Records of radiation exposure for all individuals entering radiation control areas; d.

Records of gasecus and liquid radioactive material released to the environs; e.

Records of transient or operational cycles for those plant components identified in Table 5.7-1; f.

Records of reactor tests and experiments; g.

Records of training and qdalification for current members of the plant staff; V0GTLE UNITS - 1 & 2 6-22

e-.-

l

.4INISTRATIVE CONTROLS RECORD RETENTION (Continued) h.

Records of inservice inspections performed pursuant to the.e Technical Specifications; i.

Records of quality assurance activities required by the Final Safety Analysis Report; j

Records of reviews performed for changes made to procedures or equirxnt or reviews of tests and experiments pursuant to 10 CFR 50.59; k.

Records of meetings of the PRB ar.d the SRB; 1.

Records of the service lives of all hydraulic and mechanical snubbers required by Specification 3.7.8 including the date at wrich the service life commences and associated installation and maintenance records; m.

Records of secondary water sampling and water quality; and Records of anal ses required by the Rsdiological Environmental n.

i Monitoring Program that would permit evaluation of the accuracy of the analysis at a later date.

This should include procedures effective at specified times and QA records showing that these precedures were followed.

6.10 RADIATIONPROTECTIONPROG{&j 6.10.1 Procedures for personnel radiation protection shall be prepared consistent with the requirements of 10 CFR Part 20 and shall be approved, maintained, and adhered to for all operations involving personnel radiation exposure.

6.11 HIGH RADIATION AREA 6.11.1 Pursuant to paragr ph 20.203(c)(5) of 10 CFR Part 20, in lieu of the

" control device" or " alarm signal" requirad by paragraph 20.203(c),each high radiation-area, as defined in 10 CFR Part 20, in which the intensity of radia-tion is greater than 100 mrem /hr but less than 1000 mR/h at 45 cm (18 in.)

fram the radiation source or from any surface which the radiation penetrates shall be barricaded and conspicuously' posted as a high radiation area and entrance thereto shall be controlled by requiring issuance of a Radiation Work Permit (RWP).

Individuals qualified in radiation protection procedures (e.g.,

Health Physics Technician) or personnel continuously escorted by such individLT s may be exempt from the RWP issuance requirement during the performance of thei assigned duties in_high radiation areas with exposure rates greater than 100 mrem /hr but less than 1000 mR/h, provided they are otherwise following plant radiation protection proc?dures for entry into such high radiation areas.

Any individual.or. group of individuals permitted to enter such areas shall be peovided with or accompanied by one or more of the following:

a.

A radiation monitoring device which continuously indicates the radiation dose rate in the area; or "tCGTLE UNITS - 1 & 2 6-23 u

m

ADMINISTRATIVE JNTROLS 6.11 HIGH RADIATION AREA (Continued]

b.

A radiation monitoring device which continuously integrates the radiation dose rate in the area and alarms when a preset integrated dose is received.

Entry into such areas with this monitoring device may be made after the dose rate levels in the area have been established and personnel have been made knowledgeable of them; or An individual qualified in radiation protection procedurts with.a c.

radiation dose rate monitoring device, who is responsible for providing positive control over the activitiet within the area and shall perform periodic radiation surveillance at the frequency specified by the Health Physics Superintendent in the RWP.

6.11.2 In addition to the requirements of Specification 6.11.1, areas accessible to personnel with radiation levels greater than 1000 mR/h at 45 cm (16 in.)

from the radiation source or from any surface which the radiation penetrates shall be provided with locked doors to prevent unauthorized entry, and the keys shall be maintained under the administrative control of the shift Foreman on duty and/or health physics supervision.

Doors shall remain locked except during periods of access by personnel under an approved RWP which shall specify the dose rate levels in the immediate work areas and the maximum allowable stay time for individoals in that area.

In lieu of the stay time specification of the RWP, direct or remote (such as closed circuit TV cameras) continuous surveillance may be made by personnel qualified in radiation protection procedures to provide positive exposure control over the activities being

-performed within the area.

For individual high radiation areas accessible to personnel with radiation

(

levels of greater than 1000 mR/h that are located within large areas, such as PWR containment, where no enclosure exists for purposes of locking, and where no enclosure can be reasonably constructed around ti.e individual area, that

. individual area shall be barricaded, conspicuously pobted, and a flashing light shall be activated as a warning device.

6.12 PRDi.ESS CONTROL PROGRAM (PCP) 6.12.1 The PCP shall be approved by the Commission prior to implementation.

6.12.2 Licensee-initiated changes to the PCP:

s Shall be submitted to the Commission in the Semiannual Radioactive a.

Effluent Release Report for the period in which the change (s) was made.

This submittal shall contain:

1)

Sufficiently detailed information to totally support the rationale for the change without benefit of additional or supplemental information; 2)

A determination that the change did not reduce the overall conformance of the solidified waste product to existing criteria for solid wastes; and V0GTLE UNITS - 1 & 2 6-24

~-

W ADMINISTRATIVE CONTROLS 6.12 PROCESS CONTROL PROGRAM (PCP) (Continued) 3)

Documentation of the fact that the change has been reviewed and found acceptable by the PRB.

b.

Shall become effective upon approval by the General Manager-Nuclear Plant.

6.13 0FFSITE DOSE CALCULATION MANUAL (0DCM) 6.13.1_ The ODCM shall be approved by the Commission prior to implementation.

6.13.2 Licensee-initiated changes to the ODCM:

a.

Shall be submitted to the Commission in the Semiannual Radioactise Effluent Release Report for the period in which the change (s) was made effective.

This submittal shall contain:

1)

Sufficiently detailed information to totally support the rationale for the change without benefit of additional or supplemental information.

Information submitted should consist of a package of those pages of the ODCM to be changed with each page numbered, dated and containing the revinion number, together with appropriate analyses or evaluations justifying the change (s)-;

2)

A determination tnat the change will not reduce the accuracy or reliability of dose calculations or Setpoint determinatiens; and 3)

Documentation of the fact that the change has been reviewed and found acceptable by the PRB.

b.

Shall become effective upon approval by the General Manager-Nuclear Plant.

6.14 MAJOR CHANGES TO LIQUID, GASEOUS, AND SOLID RADWASTE TREATMENT SYSTFMS*

6.14.1 Licensee-initiated major changes to the Radwaste Treatment Systems

-(iiquid, gaseous, and solid):

a.

Shall be reported to the Commission in the Semiannual Radioactive Effluent Release Report for the period in which the evaluation was reviewed by the PRB.

The discussion of each change shall contain:

1)

A summary of the evaluation that led to the determination that the change could be made in accordance with 10 CFR 50.59; 2)

Sufficient detailed information to totally support the reason for the change without benefit of additional or supplemental information; l

" Licensees may cnoose to submit the information called for in this Specification as part of the annual FSAR update.

V0GTLE UNITS - I & 2 6-25

- -.. -. -.. ~ - - _ - -.

ADMINISTRATIVE CONTROLS 6.14 MAJOR CHANGES T0 t!0VID, GASEOUS, AND SOLIO RADWASTE TREATMENT SYSTEMS (Continued) 3)

A' detailed description of the equipment, components, and processes involved and the interfaces with other plant systems; 4)

An evaluation of the change, which shows the predicted releases of radioactive materials in liquid and gaseou; effiuents and/or quantity of solid waste that differ from those previously predicted in the License application and amendments thereto; 5)

An evaluation of the change, which shows the expected maximum exposures to a MEMBER OF THE PUBLIC in the UNRESTRICTED AREA and to the general population that differ from those previously estimated in the License application and amendments thereto; 6)

A comparison of the predicted releases of radioactive materials, i

in liquid and gaseous effluents and in solid waste, to the actual releases for the period prior to when the change is to be made; 7)

An estimate of,the exposure to plant operating personnel ~as a result of the change; and 8)

Documentation of the fact that the change was reviewed and found acceptable by the PRB.

b.

Shall become effective upon approval by the General Manager-Nuclear Plant.

l e

i k

lV0GTLE UNITS - 1.& 2 6-26

!