ML20086Q723
| ML20086Q723 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 12/04/1991 |
| From: | GEORGIA POWER CO. |
| To: | |
| References | |
| 91202-C, NUDOCS 9112300302 | |
| Download: ML20086Q723 (15) | |
Text
._
i z.,. no.
n... ion h, proc.w. no.
VEGP 71002-C 2
6 of 10 b[
TRANSMITTAL NO:
MANUAt. Ar CONTROLLED NO:
TRANSMITTAL S.D. EUN ETERMEllD) SilEID Agi ytA voGTLE/ SITE
~,f ig CONTROL 1 CU TO:
Document Number Rev Oty naserintion Q/aoa-c-
'7
/
Mp/acp
.g.
INSTRUCTIONS Verify documents received agree with above description.
1.
Incorporate tho transmitted documents into your files.
2.
Documents or portions thereof presently in your possession j
3.
which are superseded by the documents hereby transmitted v>
MUST be clearly stamped or marked " VOID" or "FOR INFORMATION ONLY", or destroyed.
4.
Sign and date the attached Transmittal Receipt
,i Acknowledgement Card and return it to Document Control,
~b l
l NUCLEAR PLANT VOGTLE' l
GEORGIA POWER COMPANY l
P.O. BOX 1600 WAYNESBORD, GA.'
30830 f
DOCUMENT CONTROL SUPERVISOE Attn:
l v
Ob
/[
11 _ 11 _
FIGURE 1 (Example)
/-
K yj{4 ADOCK
{DR
\\t
Proegdure No.
^ " " " '
Vogtl] Electric G:nerating Plant 91202-C 74g W
NUCLEAR OPERATIONS nevision No.
MM N Georgia Power A
e oe no-(]
/ 2/y/9/
Unit 1
01_ 14 jARUlY, SET 0.__.f-ACTIVATION AND OPERATION OF THE OPERATIONS SUPPORT CENTER 1.0 PURPOSE The purpose of.his procedure is to provide instructions for the activation and operation of the Operations Support Center (OSC).
2.0 RESPONSIBILITIES 2.1 The first knowledgeable person from the Emergency I
Response Organization (ERO) arriving at the OSC shall I
be responsible for initiating preparations to physically activate the OSC.
2.2 The OSC
. nager shall be responsible for declaring the OSC e <
.tional and coordinating Radiological Emergency
~
(3)
Team AET) formation and dispatch.
[
2.3 The OSC Status Loop Communicator shall be responsible for supporting the OSC Manager with communications between the OSC and other Emergency Resnonse Facilities and RET's.
2.4 I&C Technicians, Electricians, Mechanics, Chemistry Technicians, Health Physics Technicians, oncoming shift personne) and off-shift operators shall be responsible for assisting in determining repair / damage control alternatives, corrective actions and serving as members of RET's.
2.5 The TSC Manacer shall be responsible for ordering i
evacuation of the OSC based upon recommendations from the OSC Manager and Health Physics Supervisor.
3.0 PREREQUISITES 3.1 An Alert, Site Area Emergency or General Emergency has been declared or the Emergency Director (ED) has ordered activation of the OSC.
~
3.2 For a Notification of Unusual Event, the ED may order
/~]
partial activation of the OSC to provide manpower
(_)
resources for assignment to RET's.
m m um
-. = -
- M EDURE No.
l REVISloN PAGE No.
VEGP 91202-C 7
2 of 14 4.0 PRECAUTIONS If the OSC habitability criteria described in Figure 2 of this procedure are exceeded, the TSC Manager should consider evacuation of the OSC and to reassamble at the TSC.
5.0 PROCEDURE 5.1 ACTIVATION 5.1.1 The ED shall order activation of the OSC, which is located on the second floor of the Maintenance Building, and notifications of appro riate OSC staff will be made p'er Procedure 91002-C, p' Emergency Notifications. The OSC will be operational (capable of being activated) within about an hour of initial notification.
5.1.1.1 To declare the facility activated (as a minimum) the OSC staff must be present'to perform the following functions:
o OSC Management (OSC Manager)
Radiation protection /First Aid (HP Technicians - 2) o O
o Offsite surveys (Chemistry Technicians /Radwaste l
Operators - 8) o Electrical Maintenance (Electricians - 2) o Mechanical Maintenance (Mechanics - 2) t o
Instrument & Control maintenance (I&C Technicians
--2) 5.1.2 The following personnel who are members of the RET's, shall report to the OSC, obtain dosimetry and emergency identification badges, sign in on the " Emergency Response Facility Roster ', Data Sheet-1, or similar form, set up work stations inclusive of status boards, and follow the directions of'the 0SC Manager:
5.1. 2.1-Maintenance Supervisor not assigned to the TSC.
5.1.?,2 Electrical Foreman 5.1.2.3 Mechanical' Foreman 5.1.2.4 I&C Foreman 5.1.2.5 Engineers 5.1.2.6 I&C Technicians
()
5.1.2.7 Mechanics 5.1.2.8 Electricians 5.1.2.9 Chemistry and Health Physics Technicians not assigned to TSC or control point.
PROCEDURE No.
REVISloN PAGE No-VEGP 91202-C 7
3 of 14-y
(
5.1,2.10 Other Operators 5.1.2.11 Other Personnel 5.1.2.12 OSC Status Loop Communicator (s) 5.1.3 Alternates reporting to the OSC shall:
5.1.3.1 Obtain dosimetry and emergency identification badges.
5.1.3.2 Sign in on the Personnel Roster.
5.1.3.3 Assume their emergency position if the designated primary has not yet arrived.
5.1.3.4 Standby for second shift duty or other assignment in accordance with directions from the OSC Manager.
5.1.4 The OSC Manager shall report OSC readiness per the OSC Manager Checklist, Procedure 91'.04-C, " Duties Of The OSC Manager".
5.2 FUNCTIONS AND OPERATIONS l
5.2.1 After activation, the following functions shall be l
performed at the OSC according to the organization shown in Figure 1:
i 5.2.1.1 Serve as the assembly and staging area for personnel pooled for emergency response.
5.2.1.2 Respond to requests from the ED and TSC concerning deployment of RET's.
5.2.1.3 Management of emergency equipment and supplies.
5.2.1.4 Coordination of movement of personnel in the plant and onsite, except for those assigned to the TSC and Control Room.
5.2.2 The OSC Manager shall coordinate the activities of the Search and Rescue, First Aid, Damage Assessment, Damage Control, and Repair and Modification Teams.
This shall l
include ensuring that teams are properly briefed and equipped prior to dispatch and-debriefed upon return to the OSC.
He shall maintain a communications log. book and ensure-that important information obtained by_these teams is disseminated to the TSC and Control Room, as appropriate.
5.2.3 The OSC Manager shall issue vehicle and fuel pump-keys I
to the offsite survey teams.
5.2.4 The OSC Status Loop Communicator (s) shall report directly to the OSC Manager and maintain communications logs an'd status boards.
,.-.,,,--m,,
,-m v
v
PROCEDURE No.
REVISloN PAGE No.
VEGP-91202-C 7-4 of 14 5.2.5 The OSC support staff personnel shall conduct personnel accountability of OSC Staff, under the direction of the OSC Manager, per Procedure 91401-C, " Assembly And Accountability".
5.2.6 Technicians, Off-shift Operators and oncoming shift personnel shall assist the OSC Manager and serve as members of emergency teams.
Team members shall be qualified as RET members.
Each team shall include at least one health physics technician if radiological conditions warrant.
The_ composition of teams, reporting requirementa and appropriate procedures / checklists are as follows:
5.2.6.1 Search and Rescue Team a.
Designees and Qualifications:
At least two members that are First Aid-treined, ONE being a Health Physics Technician if radiological conditions exist.
Team formed by OSC
- Manager, b.
Reporting Requirements:
l Team Leader (designated by OSC Manager) reports to the OSC Manager directly, or via OSC Foreman / Supervisor at least every one-half hour by hand-held radio, plant telephone, or'page, c.
Procedure / Checklist:
Procedure 91402-C, " Search and Rescue".
Procedure 92206-C, " Contamination Monitoring And Decontamination" i
l 5.?.6.2 First Aid Team c.
Desir' noes and Qualifications :
At l east twc merbers, who are First Aid-trained, ONE being. bealth Physics Technician if the injured person is potentially contaminated, b.
Reportine I>cuiremente:
Team Leader (designated by OSC Managsr) reports to the OSC Manacer directiv or via OSC Foreman / Supervisor at l' east every one-half hour by hard-held radio, plant telephone or page.
~
v
~.
PROCEDURE No.
REVISION.
PAGE No.
VEGP.
-91202-C 7
5 of 14 T
c.
Procedures / Checklists:
Procedure 91306-C, " Contamination Monitoring and Decontamination".
Procedure 91307-C,
" Contaminated Injury".
5.2.6.3 Damage Assessment / Control Team a.
Designees and Qualifications:
At least two appropriately qualified OSC personnel.
Formed by OSC Manager, b.
Reporting Requireme'nts :
Team Leader (designated by OSC Manager) reports to OSC Manager directly or via OSC Foreman / Supervisor at.least every one-half hour by hand-held radio, plant telephone or page, c.
Procedure / Checklist:
Procedure 91308-C, "Re-Entry", if recovery phase of a radiological emergency is initiated.
Procedure 191306-C, " Contamination Monitoring and Decontamination", if health Physics Technician accompanies teor.
L.2.6.4 Repair and Modification Team a.
Designees and Qualifications:
At-least two appropriately cualified OSC personnel.
Formed by OSC Manager.-
.b.
Reporting' Requirements:
Tean Leader (derienated b" OSC Manager) reports to OSC Mannter directiv or via OSC Foraman/5upervisor at lenct everv one-half hour by
~
hand-held radio, plant telephone"or page, c.
Procedures /Checklints:
Procedure M308-C, "Re-Entry", if recovery phase of a-radiological emergency is initiated, Procedures C 306-C, " Contamination Monitoring and Decontaminaricn", if Health-Physics Technician aCCCmDandeS t e ar..
)
i-t h '
- - -. ~ -
9 PROCEDURE No.
REVISION PAGE No.
VEGP 91202-C 7
6 of 14 5.2,6.5 In-Plant Monitoring Team a.
Designees and Qualifications:
At least two members, with at'least one being a Health Physics Technician. Formed by OSC Manager, b.
Reporting Reauirements:
Team Leader (designated by OSC Manager) reports at 1 east every one-half hour to Health Physics Supervisor or-via Survey Team Communicator in the TSC by hand-held radio, plant telephone or page, c.
Procedure / Checklist:
Procedure 91302-C, "In-Plant Sampling and Surveys".
Procedure 91308-C, "Re-Entry", if recovery phase of a radiological emergency is initiated.
5.2.6,6 Back-Up Fire Brigade a.
Designees and Qualifications:
p L/
Assigned Fire Brigade personnel.
Formed by OSC
- Managor, b.
Peporting Requirements:
Team i.eader (desicnatec' by OSC Manager) reports to Fire Brigade Captain and-OSC tianager when assigned task in con.pleted, c.
P-ocedure/ Checklist:
Procedure 9 2 0- 0 0 - C, " Fire Protection Prograr:"
5.2.6,7 Field Monitoring Team a.
Desicnee-nad Gualificerions:
Ansirned F' id ':onitoring Team (FMT) personnel.
At least one r'en.ber who a Field Monitor Temt trained.
(Tht driver does not need to be Ft:T trained, however, it is preferred that two F:IT trained nernnnnel be ascinned).
h' e
,.-r,.,
w
_nr-m e,
PROCEDURE No.
REVISloN PAGE No.
VEGP 91202-C 7
7 of 14
(
b.
Reporting Requirements:
Team Leader (designated by OSC Manager) reports at least every one-half hour to the Dose Assessment Manager (or HP Supervisor if the EOF is not activa'.ed) via the Field Monitoring Team Communicator in TSC or EOF by mobile and/or hand held radio, c.
Procedures / Checklist Procedure 91303-C, " Field Sampling and' Surveys".
Procedure 91306-C, " Contamination Monitoring and Decontamination".
5.2.7 Prior to activation of the OSC, the ED may dispatch Emergency Teams from assigned shift personnel.
In this case, teams will be formed by and report to the ED, or his designee.
NOTES a.
Communications links available in the OSC are described in O
Procedure 91204-C, "Emer Response Communications"gency b.
Emergency equipment and-supplies stored at or near the OSC are.
detailed in Procedure 91702-C,
" Emergency Equipment and Supplies".
5.2.8 The OSC Manager will make provisions for a shift change within 12 to 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> of the initiation of the current shift.
5.3 OSC EVACUATIOM 5.3.1 The TSC Manager in consultation with the ED may order-evacuation of the OSC if the' habitability criteria (See i Figure 2) 'luus been exceeded.
He shall instruct the OSC l Manager to relocate staff, equipment and supplies'to the TSC or EOF, as appropriate.
5.3.2 The OSC Manager shall determine the reassembly points for the OSC staff and direct the evacuation.
Pe sonnel who may be called on for immediate support'will be relocated to the TSC.
l 5.3.3 The 0SC Manager shall contact all RETs performing in-plant activities and inform them of OSC evacuation, interim communications methods and reassembly locations.
,n r-y.,
P.90c[ DURE No H[Vit,loN PAGE No VEGP 91202-C 7
8 of 14 1.3.4 nllphasesofershallkeeptheTSCManagerapprisedof T.
SSC Mann
{
the evacuation and shall report compler. ion of relocation.
6.0 REFERENCES
6.1 VEGP Emergency Plan 6.2 PROCEDURES 6.2.1 91002-C, " Emergency Notifications" 6.2.2 91104-C, " Duties Of The OSC Manager" 6.2.3 91204-C, "Etnergency Response Communications" 6.2.4 91302-C, "In-Plant Satapling And Surveys" 6.2.5 91303-C, " Field Satnpling And Surveys" 6.2.6 91306-C, " Contamination Monitoring And_ Decontamination" 6.2.7 41307-C, "Ontatninated Injury" 6.2.8 91308-C. "Re-Entry" 6.2.9 91401oc, " Assembly And Accountability" 6.2.30 91402-C, "Scarch And Reticue" 6.2.11 91702-C
" Emergency Equipment And Supplies" 6.2.12 92000-C, " Fire Protection Program" 6.3 NUREG-0654, FEMA-REP-1, Rev 1, " Criteria for a
Preparation and Evaluation of Radiological Etnergency Response Plano.and Preparedness in Support of Nuclear
= Power Plcnts" I
6.4 NUREG-0696. " Functional Criteria for Emergency Response Facilities" END 0F PROCEDURE TEXT O
a a
w
.h l
l 5
'i L.
a 4
1 51 f
o 3,
]
J_
mm q3 J_
- e 9
~.
t T
aI u
r t
C o
tE s
a,a c
r, f
~ eS a=-
a m
_ m T
s Y"a aw cps s
mA#
s o.,~
s "y'_
eaa w
e eN"1
_ m _
t t g
w11a a
m n
J n
tT
_" "m"_
"T r
a T
t eT A1 o
5 s o
tT 9
7 n
T t
g m
r
_ u.
r 3
c t c e
f a
A p L f L mn D
C w
a
~
a 6g o
%C w
a e 5
s n
t c
s o
o.
i t
r s
w a
$ e g
7 e 4
p
?
S r
a es ts J*
ec e
t rC ug O
r y
s c.
r g m r
a y
- o t
e u o 4
aT P
WT r
t %
Cf E
sr 3
8 a
C v
( C t (a w
Q(
f 4
l t
f u
a D
t'.
m s
F arC l
TRAH 9
t C
8 a
C C t W
& (g l
l N
W 1
f e t
O T
y t
1 IT 7
A E
pi Z
RU I
t N
G A
f I
Ce G
- o F
t.
R
- M 3
a4 T
rA Ns e
t "h
O
- t
'*1 s fg a
g l
2w
- W C
w
!O C 71 M
S-J_
f S V
=
r Os f
f 0
a a
=
i p
sa s
i t
m
- v _
s t
s
- n_
e t
s l
T h
N8 riL s
t W
- c ag ea 9T op t
0a I
t g r
T t<
if N
T 5
e.
t n t
2 -
a
- w_
ne t
a 8
f Y$o
(
d C
e t
S W
e t
r.
9")
ii me T*
w 0
i g
2 s
g I
e 9
1 g
o I
4 I
9 C
(
S I
1 O
PG E
V O
d I
?
i N"V C
Y O
N L
j' li
-.___m..
.M.
' fit ViblON PAGE NO i
M
{f"40Cf Oulti f@
VEGP 91202aC 7
10 of 14 t
OSC 1!ABITABILITY CRITERIA r
The following limits should be considered upper limit habitability criteria.
t i
1.
Whole Body Dose Rate - 100 mrem /hr 2.
Iodine Activity
- 2.7E-7juCi/cc j
t i
j I
i i
i i
4
{
s i
TIGURE 2
.o,
.5...,-,,..-....,,.
.j PHOCLDUHE NO.
H L "'t.lO N l' AGE tvo VEGP 91202-0 7
11 of 14 Sheet I of 1 i
i i
DATA SilEET 1 1
EMERGENCY RESPONSE FACILITY ROSTER I
Manager Facility
)
bate (FOR RECALLED t
PERSONNEL ONLY)
I Titoc I
Itaoge (Eastern) llave you consumed f: umber Name any n'icohol in the (NO,SD,SG)
IN OUT past 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />?
l NO YES 1
I i
r 0
i I
l l
1 l
l i
l i
t i
j i
(
i i
i i
c i
i j-f
(
PAGE of x
.,ve+,..-<...~~-,w..,,
...-,,m,.,-_,-,-,e..,~,-.--.--y,..-,_,.,,..,,,v,..-,-,,.-
~y--,,,,v.m,-,.,
--.._.- _ -.~.--
.- ___._-_...-.-.__.-.~..-- -.-- -
J PHoC(T"HI No.
AfVi$loN PAOL No -
l l
VEGP 91202-C 7
12 of 14 i
Sheet 1 of 1 OSC ACTIVATION CllECKLIST
]
^
RESPONSIBILITY:
Prepare the OSC physically for use by the VEGP Emergency i
Response Organization.
I!JITIAL ACTIO!iS i
1.
Badge in on the OSC ACAT.
f i
2.
Review the OSC Floor Plan per layout posted in OSC.
3.
Sign in on the Personnel Roster and answer Fitness For Duty (FFD) question.
(FFD question for recalled personnel only).
l 4.
Retnove emergency response tnatorials and equipment frotn storage areas and arrange physical facilities per layout 3
t posted in OSC.
5.
Remove telephones, emergency identification badges, status boards, copies of procedures checklists, maps and other j
equipment / supplies from the OSC Emergency Kit and prepare the OSC for activation.
6.
Check operability of telephones by lifting receiver and listening for a dial tone, j
7 Perform radio check of hand held radios (Channels 1, 2, 3, 4 l
and b).
i i
8.
Report readiness to the OSC Manager.
9.
If the OSC 11anager has not arrived, begin completing OSC.
Manager Checklist in Procedure 91104-C, '_' Duties of The OSC Manager".
10 Establish.your work ntation and await instructions from the OSC Manager or TSC Manager, f
b
=
4 P
O
+
.J P.
._,_.,,6.-m_y,4-_,,4-m.,
--,...,_r_.,,
.m._
,... +, _.. _
._..r--...,,,,,
,_..,ry,,.,,.,_.,,,,..m.,.,_
..,,_,,,,,emm.,.
I t
PHoCCDURENo HLVIStoN PAGL No VEGP 91202-C 7
13 of 14 Sheet 1 of 2 LAB FOREMAN CllECKLIST
[
I POSITION FILLED BY: llP Fortman i
INITIAL ACTIONS J
l I.
Report to the OSC.
2.
Sign-in on Personnel Roster and badge in on OSC ACAT.
3.
Obtain work packets.
4 Obtein briefings from OSC Manazer, senior on-shift lleat.h Physics Technician and :lP Supervisor (from TSC) on status of plant and any releases.
5.
. Advise OSC Manager when ready for operation and begin maintaining appropriate logs and-checklists.
l 6.
Establish an unmanned personnel monitoring station at the entrance to the OSC.
7.
Periodically monitor conditions in accordance with the i
O liabitability Checklist on the following sheet.
i r
_ SUBSEQUENT ACT, IONS 3.
Assign llealth Physics Technicfans to Radiological Emergency Teams (RET's) if radiological conditions l
warran* or are unknown in areas where teams will be l
working.
(i.e., Plant Entry Security Building,-Secondary Alarm Station, Supervisor Nucicar Security office).
NOTE Do not use a designated emergency renponse field monitoring veliicle for transportation to the relocation center.
2.
Assign llealth Physics personnel to report with the 1
- i Evacuation Leader (Security Officer) to the offaite relocation center at an ALERT to set up for decontamination.
abould-a Site Evacuation be ordered.
O 1
---..,.-,.y.
-,,,c
...f,m
,,,-w
,-c,-.,,,_..,..,c,,_y-,,,,,.,,,,.--,-m-v~,.,,,,,,,m,y,,-,,-
i EoCLDURE No=
' HE vt$loN PAGt No VEGP 91202-C 7
14 of 14 Sheet 2 of 2 f
LAB FOREMAN CHECKLIST r
SJ3 SEQUENT ACTIONS CONTINUED _
0FFSITE PERSONNEL MONITORING AND DECONTAMINATION (SITE EVACUATION)
I 1.
Upon instruction from the HP Supervisor, dispatch available l
HP Foreman or Health Physics personnel to the Plant Entry l
and Security Building Exit to monitor personnel as-they evacuate the protected area.
Exiting personnel should be frisked for contamination if they alarm the high sensitivity i
2.
If exiting personnel are found to be contaminated, have any contaminated clothing removed and provide-temporary coveralls and shoe covers.
Direct individu'als to the offsite relocation center for i
decontamination.
3.
When required, request permission from the TSC to dispatch additional monitoring teams to the assigned relocation area.
4 Remain in contact with the offatte relocation center to review the progress of offsite monitoring and t
decontamination activities, OSC RADIOLOGICAL HABITABILITY CHECKLIST 1.
- Periodically monitor radiologi::a1 conditions in the area.
2.
- Log the time, dose rate (if appropriate), air sample results, iodine concentration and swipe survey results.
I 3.
Report findings to the llP Supervisor and OSC Manager.
^~
- Continuing Activity l
l l
[
V I
n:
.~,-,n-,v.~,n,,,nn,,,,,,-,
-,-an,,
-n,,nn-,,,v,-
,--m,,-,,,vm--
.,,w-n.,c, r,,,-m.,n-
,,en ---,, n
-