ML20132C471
| ML20132C471 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 12/12/1996 |
| From: | GEORGIA POWER CO. |
| To: | |
| Shared Package | |
| ML20132C460 | List: |
| References | |
| NUDOCS 9612180371 | |
| Download: ML20132C471 (5) | |
Text
.... - _. _.
_ _.. ~.
ATTACHMENT
)
Replacement page 6 of marked-up Unit 1 Operating License (NPF-68)
Replacement page (INSERT) of marked-up Unit 1 Operating License (NPF-68)
Replacement page 4 of marked-up Unit 2 Operating License (NPF-81)
Replacement page (INSERT) of marked-up Unit 2 Operating License (NPF-81) l 7
i a
1 9612180371 961212 PDR ADOCK 05000424 P
PDR v
v r
w"=
)
s, j
1 i
\\
i l
t d
1(
i i.
(c) a schedular easeption from 10 CFR 50.34(b)(2)(1) as it pertains j
to GCC 2, 61, and 62 of Appendts A to 10 CFR 50 for the spent fuel j
pool racks for the time period before the racks contain irradtated fuel. The special circumstances regarding eneestions b and c are k
identified in Sections 6.2.6 and 9.1.2 of $$ER 5, respectively.
i i
An exemption was previously granted pursuant to 10 CFR 70.24. The i
exemption was granted with NRC materials license No. Slet-1967, issued
)
August 21, 1986, and reiteved GPC from the requirement of having a i
erit 1cality alars system. GPC hereby esempted from the er1t1cality alors systes provision of 10 CF 0.24 so far as this section appites i
\\
Itcen to the storage of fuel assemblies oldunJd Lh1 h ern E. k e u.
a These exemptions are authertred by law, will not present a.. undue risk to the pubite health and safety, and are consistent with the commen i
defense and security. The exemptions in itees b and c above are granted
)
l pursuant to 10 CFR 50.12. With these eseeptions, the fact 11ty will j
crerate, to the extent authorized herein, in conformity with the j
application, as amended, the provisions of the Act, and the rules i
i and regulations of the Commission.
Sout!herf) Nue/enty-E.
C:- ;': *:-:- E a, shall fully toplement and maintain in effect all provisions of the Compitssion-approved physical, security -guard train.
s and qualification, and sa eguargis _ contingency' plans including nts made pursuant to proiitt ns of the Miscellaneous Amendments a search
-Jtequirement's/ revisions o 10 CFR 73.55 ($1 FR 27817 and 27822) and to they a'uthority of 10 CFR 50.90 and 10 CFR 50.54(p). Th: ;;hr.:, d.tch ::..:n ' f l3 S' ;=-de-Informattea-protected-under-10-CFR-73,23r-ere-**titied: "Alvin#,
ME Ye:tle Mies-81 eat 8kysical Security 94an,"--with-rev4stoks-subu4tted [5
-[ (tt
, -throwth-January 4rl"S"; "Alvia-Wr-Vottle-hcisar41 ant-Guard-Trehug M
.Quellfication plan,"-with revisions-subettted through-June-2,--1986;-and>
/
W &4 l
. Alvin W. Vogtle Nuclear Plant-Safeguards Contingency Plan," witWu A?
aavisions-subatttM thW Jeauar 5.1**! t' Ch es saide in. accords e Swity)O CF01h55 fha 11 IMf'1ep"temehed..ta accord @ance with the schedule
~
sit forth'therein.
F.
GPC sha11 comply with the antitrust conditions delineated in p
a t
iteense.
G.
4pe shall toplement and maintain in effect all provisions of the approved fire protection progree as described in the Final Safety Analysts Report for the factitty, and subetstals dated July 2.
August 4 and 13, October 10 and 24 November 5, and December 19, 1986, and January 2,1987, as approved in the SER (NUREG-1137) ou up e 5 subject to the fo11 ewing provtsion:
4p6 may make changes to the approved fire protection progree without prior approval of the Commission, only if these changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
~
i e
1
Insert 1 Revised i
The plans are entitled: "Vogtle Electric Generating Plant Unit I and Unit 2 Physical Security and Contingency Plan,"(which contains Safeguards Information protected under 10 CFR 73.21) with revisions submitted through September 12,1996, and "Vogtle Electric Generating Plant Guard Training and Qualification Plan," with revisions submitted through March 13,1996.
I I
i j
2 4
l i
1 i
4 4
~
3
.4 I
~
4 D.
The facility requires exesptions from certain requirements of 10 CFR j
Part 50 and 10 CFR Part 70. These include (a) an exesiption from the requirements of 10 CFR 70.24 for two criticality monitors around the fuel storage area (b)(ii) of Appendix J of 10 CFR Part 50, the testing (b) an enesption from the requirements of l
Paragraph III.D.2 of containment air locks at times when containsent integrity is not
?
required, and (c) an exeeption from the schedule requirements of 10 CFR 50.33(k)(1) related to availability of funds for decossissioning i
the f acility. The special circumstances regarding exemptions b and c
(
are identified in Sections 6.2.6 and 22.5 of $5ER 8, respectively.
I i
An exesstion was previously granted pursuant to 10 CFR 70.24. The exesstion was granted with NRC mater 1&ls license No. $104-1981 l
1ssued July 13, 1988, and relieved GPC from the requireaant of i
having a criticality alarm systes. GPC hereby exempted f rom the criticality alarm systes provision of 10 R 70.24 so far as this i
section applies to the storage of fuel asse lies held under this l
ud Se.1% Naclav an
" c' "" '
These exemptions are authorized by law, will not present an undue i
risk to the public health and safety, and are consistant with the j
cosmon defense and security. The exenstions in items b and c above are gYanted pursuant to 10 CFR 50.12. With these exeeptio,ns,.
the facility will operate, to the extent authorized herein, in 4
conformity with the application, as amended, the provisions of the ang rules and regulations of the Commission.
]
E.
4P6 shall fully isplement and maintain in effect all provisions of j
the Cosmission-approved physical security, guard training ask j
qualification, and safegerds contingency plans including' amendments made pursognt to provisions of' the Miscelfaneous Ameneents and M
Search Roottiresenti revisions to 10 CFR 73.55 (51 FR 27817 and N
27822) act to the authority of 10 CFR 50.90 and 10 CFR 50.54(p 4
^ '
n: ;hn:, which-contain-Safeguards-Information-protected-unde /).
i d-y A (FR 73.21,- afe-ent&tledo 2Alvin-WrVogtle Nuclear Plant-Physical
/
c4 Security-Plan /'-with revisions submitted through July 11 -1988 @
]
j A
'Alvin-WrVogtle-Nuclear-Plant Guard-Treieing ;;d b;1tfi;eti;;
i TryWfl f un,' tith-revisions-submitted-through-Jewerj 15,1".4 ;;d "Ahi p
i r
Wrvogtle-Muclear-Plant-Safeguards Contingenty-Plan,"-with-revist
/
YChanges made in accordance witA
/ b[ subst *:d thrt-January +,-498&r
-10 CFR 73.55 4. 1 L
beMaplemented'in accordance with the schedule seV forth therein t
F.
GPC shall comply with the antitrust conditions delineated in gndix gthislicense.
G.
6Pt shall implement and maintain in effect all provisions of the approved fire protection program as described in the Final Safety Analysis Report for the facility, as approved in the SER (NUREG-1137) i through Supplement g subject to the following provision:
l O
e
..... - =.. _.. - -.... -
Insert 1 Revised j
The plans are entitled: "Vogtle Electric Generating Plant Unit I and Unit 2 Physical Security and Contingency Plan," (which contains Safeguards Information protected under 10 CFR 73.21) with revisions submitted through September 12,1996, and "Vogtle Electric Generating Plant Guard Training and Qualification Plan," with revisions submitted through March 13,1996.
i i.
i I
)
i t
F