Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20217G6571999-10-13013 October 1999 Proposed Tech Specs Pages,Revising TS to Permit Relaxation of Allowed Bypass Test Times & Completion Times for LCOs 3.3.1 & 3.3.2 ML20217B1221999-10-0404 October 1999 Proposed Tech Specs Pages,Revising TS 5.5.6 Incorporating Exceptions to Reg Guide 1.35,rev 2,as Described in FSAR Section 3.8.1.7.2 Re Prestressed Concrete Containment Tendon Surveillance Program ML20212F4891999-09-22022 September 1999 Proposed Rev to TS SR 3.8.1.13,to Include Upper Limit for DG Loading for 2 H Portion of SR ML20211J5511999-08-30030 August 1999 Proposed Tech Specs,Raising Level of Approval Authority for Deviations from Guidelines Provided to Minimize Unit Staff Overtime Specified in TS 5.2.2 ML20211J7281999-08-26026 August 1999 Proposed Tech Specs Updating Versions of LCO 3.0.4 & SR 3.0.4 to Be in IAW with Versions of LCO 3.0.4 & SR 3.0.4 as Noted in Rev 1 to NUREG-1431 ML20211E9111999-08-24024 August 1999 Proposed Tech Specs,Relaxing Slave Relay Test Frequency from Quarterly to Refueling Frequency ML20196L3181999-05-18018 May 1999 Proposed Tech Specs SRs 3.8.1.3 & 3.8.1.13 Reducing Loading Requirements for DGs ML20205S3791999-04-19019 April 1999 Proposed Tech Specs Revising SR 3.3.5.2 & Associated Bases to Allow Loss of Voltage & Degraded Voltage Trip Setpoints to Be Treated as Nominal Values in Same Manner as Trip Setpoints for RTS & ESFAS Instrumentation ML20205Q7901999-04-13013 April 1999 Proposed Tech Specs,Updating Versions of LCO 3.0.4 & SR 3.0.4 to Be Consistent with Versions of LCO 3.0.4 & SR 3.0.4 as Appear in Rev 1 to NUREG-1431 ML20154M9961998-10-15015 October 1998 Proposed Tech Specs,Deleting & Modifing Conditions Which Were Issued with Licenses That Are Now Obsolete ML20151U2011998-09-0303 September 1998 Proposed Tech Specs Pages for Amends to Licenses NPF-68 & NPF-81,changing TS to Support Replacement of Nuclear Instrumentation Sys Source Range & Intermediate Range Channels & post-accident Neutron Flux Monitoring Sys ML20236R4661998-07-13013 July 1998 Proposed Tech Specs Eliminating Periodic Response Time Testing Requirements on Selected Sensors & Selected Protected Channels ML20154Q8611998-06-30030 June 1998 Proposed Tech Specs Bases Since Implementation of Improved TS on 970123 Through Aug 1998 ML20206N3131998-06-30030 June 1998 Proposed Tech Specs Re Replacement of Nuclear Instrumentation Sys Source & Intermediate Range Channels & post-accident Neutron Flux Monitoring Sys ML20236F1631998-06-26026 June 1998 Proposed Tech Specs Revising LCO 3.3.6 Re CVI Instrumentation & LCO 3.9.4 Re Containment Penetrations to Facilitate Outage Planning ML20247K5041998-05-15015 May 1998 Proposed Tech Specs Pages Revising New Program 5.5.18 to Extent That Items B,C & D. Refer to LCO Action Statement & Bases Insert for New Required Actions B.5.1 & B.5.2 ML20247G9471998-05-0808 May 1998 Proposed Tech Specs Section 5.5.7, RCP Flywheel Insp Program, Specifying Alternate Flywheel Insp Once Every Ten Years ML20216J4971998-04-16016 April 1998 Proposed Tech Specs 3.3.1 & 3.3.2 Re Reactor Trip Sys & ESFAS Instrumentation ML20199E5351998-01-27027 January 1998 Complete Replacement of All Typed Pages of TS Changes Submitted in Ltr LCV-0849-E ML20199A4131998-01-22022 January 1998 Proposed Tech Specs Adding Conditions for DG for Extended DG Completion Time of Fourteen Days ML20199J6651997-11-20020 November 1997 Proposed Tech Specs Pages Changing Capacity of Unit 1 Spent Fuel Storage Pool from 288 to 1476 Assemblies & Revising Design Features Description to Reflect Criticality Analyses & Storage Cell Spacing ML20199G3901997-11-20020 November 1997 Proposed Tech Specs Facilitating Treatment of Trip Setpoints as Nominal Values & Correct Certain Typos ML20211N2451997-10-10010 October 1997 Proposed Typed Tech Specs Pages,Revising Credit for Boron & Enrichment Increase for Fuel Storage ML20217H9051997-08-0808 August 1997 Proposed Tech Specs Pages Re Credit for Boron & Enrichment Increase for Fuel storage.W/marked-up Pages ML20141A8541997-06-13013 June 1997 Proposed Tech Specs Revising LCO 3.4.10 to Reduce Nominal Set Pressure by 1% to 2460 & Increase Tolerance to +2% ML20133L3081997-01-10010 January 1997 Proposed Tech Specs Table 3.3.1-1 Re Amends 96 & 74 ML20132C4711996-12-12012 December 1996 Proposed Tech Specs Re Physical Security & Contingency Plan ML20117N5851996-09-13013 September 1996 Proposed Tech Specs 3.8.1 Re AC Electrical Sources ML20129A6461996-09-11011 September 1996 Proposed Tech Specs,Providing Updated Documentation for License Amends Application for Southern Nuclear to Become Licensed Operator ML20117C4151996-08-23023 August 1996 Proposed Tech Specs to Convert Units 1 & 2 Based on NUREG 1431 ML20117N6471996-06-17017 June 1996 Proposed Tech Specs Section 5.3.1,allowing Use of Fuel Assemblies Containing Fuel Rods Clad W/Zirlo ML20117N6361996-06-17017 June 1996 Proposed Tech Specs,Clarifying Requirements of TS SR 4.8.1.1.2.j (2) That Prescribes Pressure Test of Portions of Diesel fuel-oil Sys Designed to Section Iii,Subsection Nd of ASME Code ML20111A5501996-05-0606 May 1996 Proposed Tech Specs,Incorporating Extended DG AOT to 14 Days from Discovery of Failure to Meet Lco,Provided Standby Auxiliary Transformer Available ML20101D4151996-03-0505 March 1996 Proposed Tech Specs Re Conversion Based on NUREG-1431 ML20100G0371996-02-19019 February 1996 Proposed Tech Specs Based on NUREG-1431 ML20097A3171996-01-30030 January 1996 Proposed Improved TS Based on NUREG-1431 ML20095J2501995-12-22022 December 1995 Proposed Tech Specs,Allowing Use of Option B of 10CFR50,App J for Type B & C Testing ML20094N4071995-11-20020 November 1995 Proposed Tech Specs,Converting Existing TS to Format & Content of NUREG-1431 ML20093K2281995-10-16016 October 1995 Proposed Tech Specs,Adding Footnote to Spec 4.6.1.2.d Stating That Type B & C Tests Scheduled for Refueling Outage 1R6 Will Be Conducted Per Option B of 10CFR50 App J & Using Guidance of RG 1.163,Rev 0 ML20098C1471995-10-0202 October 1995 Proposed Tech Specs,Allowing Next Type a Test to Be Rescheduled ML20098A4861995-09-22022 September 1995 Proposed Tech Specs,Converting Existing VEGP TS Requirements to Format & Content of NUREG-1431 ML20086G5691995-07-0606 July 1995 Proposed Tech Specs Section 3.8.3.1,Page 3/4 8-15 Re Footnote & Bases & Expansion ML20085G7171995-06-14014 June 1995 Proposed Tech Specs,Clarifying in Revised Bases of 3/4 Chapter 8,that Alignment of Standby Auxiliary Transformer Intended to Be Temporary Alignment & Will Be Utilized When Normal Preferred Offsite Power Source,Rat Unavailable ML20083M0731995-05-12012 May 1995 Proposed Tech Specs Revising SR 4.1.6.2 to Support Exemption from 10CFR50,App J Type a Test Schedule ML20083A1391995-05-0202 May 1995 Proposed Tech Specs,Adding Automatic Load Sequencer to Plant TS ML20082D9881995-04-0404 April 1995 Proposed Tech Spec Page 6-7 Reflecting Corrected Terminology Re Composition of Plant Review Board ML20081J5031995-03-17017 March 1995 Proposed TS 3.9.4 Re Containment Airlock Doors to Be Open During Fuel Movement ML20081D1591995-03-17017 March 1995 Proposed TS Table 3.3-8, Accident Monitoring Instrumentation, Deleting Loop Numbers 551,552,553 & 554 ML20082E7731995-03-0404 March 1995 Proposed Tech Specs Re Plant Review Board Composition ML20080N2451995-02-28028 February 1995 Proposed Tech Specs Pages Re Accident Montoring Instrumentation 1999-09-22
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20217G6571999-10-13013 October 1999 Proposed Tech Specs Pages,Revising TS to Permit Relaxation of Allowed Bypass Test Times & Completion Times for LCOs 3.3.1 & 3.3.2 ML20217B1221999-10-0404 October 1999 Proposed Tech Specs Pages,Revising TS 5.5.6 Incorporating Exceptions to Reg Guide 1.35,rev 2,as Described in FSAR Section 3.8.1.7.2 Re Prestressed Concrete Containment Tendon Surveillance Program ML20212F4891999-09-22022 September 1999 Proposed Rev to TS SR 3.8.1.13,to Include Upper Limit for DG Loading for 2 H Portion of SR ML20211J5511999-08-30030 August 1999 Proposed Tech Specs,Raising Level of Approval Authority for Deviations from Guidelines Provided to Minimize Unit Staff Overtime Specified in TS 5.2.2 ML20211J7281999-08-26026 August 1999 Proposed Tech Specs Updating Versions of LCO 3.0.4 & SR 3.0.4 to Be in IAW with Versions of LCO 3.0.4 & SR 3.0.4 as Noted in Rev 1 to NUREG-1431 ML20211E9111999-08-24024 August 1999 Proposed Tech Specs,Relaxing Slave Relay Test Frequency from Quarterly to Refueling Frequency ML20196L3181999-05-18018 May 1999 Proposed Tech Specs SRs 3.8.1.3 & 3.8.1.13 Reducing Loading Requirements for DGs ML20205S3791999-04-19019 April 1999 Proposed Tech Specs Revising SR 3.3.5.2 & Associated Bases to Allow Loss of Voltage & Degraded Voltage Trip Setpoints to Be Treated as Nominal Values in Same Manner as Trip Setpoints for RTS & ESFAS Instrumentation ML20205Q7901999-04-13013 April 1999 Proposed Tech Specs,Updating Versions of LCO 3.0.4 & SR 3.0.4 to Be Consistent with Versions of LCO 3.0.4 & SR 3.0.4 as Appear in Rev 1 to NUREG-1431 ML20154M9961998-10-15015 October 1998 Proposed Tech Specs,Deleting & Modifing Conditions Which Were Issued with Licenses That Are Now Obsolete ML20151U2011998-09-0303 September 1998 Proposed Tech Specs Pages for Amends to Licenses NPF-68 & NPF-81,changing TS to Support Replacement of Nuclear Instrumentation Sys Source Range & Intermediate Range Channels & post-accident Neutron Flux Monitoring Sys ML20236R4661998-07-13013 July 1998 Proposed Tech Specs Eliminating Periodic Response Time Testing Requirements on Selected Sensors & Selected Protected Channels ML20154Q8611998-06-30030 June 1998 Proposed Tech Specs Bases Since Implementation of Improved TS on 970123 Through Aug 1998 ML20206N3131998-06-30030 June 1998 Proposed Tech Specs Re Replacement of Nuclear Instrumentation Sys Source & Intermediate Range Channels & post-accident Neutron Flux Monitoring Sys ML20236F1631998-06-26026 June 1998 Proposed Tech Specs Revising LCO 3.3.6 Re CVI Instrumentation & LCO 3.9.4 Re Containment Penetrations to Facilitate Outage Planning ML20248K5801998-05-25025 May 1998 Rev 1 to VEGP Units 1 & 2 Second 10-Yr Interval Valve IST Program ML20247K5041998-05-15015 May 1998 Proposed Tech Specs Pages Revising New Program 5.5.18 to Extent That Items B,C & D. Refer to LCO Action Statement & Bases Insert for New Required Actions B.5.1 & B.5.2 ML20247G9471998-05-0808 May 1998 Proposed Tech Specs Section 5.5.7, RCP Flywheel Insp Program, Specifying Alternate Flywheel Insp Once Every Ten Years ML20216J4971998-04-16016 April 1998 Proposed Tech Specs 3.3.1 & 3.3.2 Re Reactor Trip Sys & ESFAS Instrumentation ML20199E5351998-01-27027 January 1998 Complete Replacement of All Typed Pages of TS Changes Submitted in Ltr LCV-0849-E ML20199A4131998-01-22022 January 1998 Proposed Tech Specs Adding Conditions for DG for Extended DG Completion Time of Fourteen Days ML20198P6961998-01-16016 January 1998 Revised Spent Fuel Pool Boron Dilution Analysis ML20216B2621997-12-11011 December 1997 Rev 14 to ODCM, for Vogtle Electric Generating Plant ML20199G3901997-11-20020 November 1997 Proposed Tech Specs Facilitating Treatment of Trip Setpoints as Nominal Values & Correct Certain Typos ML20199J6651997-11-20020 November 1997 Proposed Tech Specs Pages Changing Capacity of Unit 1 Spent Fuel Storage Pool from 288 to 1476 Assemblies & Revising Design Features Description to Reflect Criticality Analyses & Storage Cell Spacing ML20211N2451997-10-10010 October 1997 Proposed Typed Tech Specs Pages,Revising Credit for Boron & Enrichment Increase for Fuel Storage ML20217H9051997-08-0808 August 1997 Proposed Tech Specs Pages Re Credit for Boron & Enrichment Increase for Fuel storage.W/marked-up Pages ML20141A8541997-06-13013 June 1997 Proposed Tech Specs Revising LCO 3.4.10 to Reduce Nominal Set Pressure by 1% to 2460 & Increase Tolerance to +2% ML20148E6481997-05-15015 May 1997 Rev 0 to VEGP Units 1 & 2 Second 10-Yr Interval Pump IST Program ML20148E6611997-05-15015 May 1997 Rev 0 to VEGP Units 1 & 2 Second 10-Yr Interval Valve IST Program ML20133L3081997-01-10010 January 1997 Proposed Tech Specs Table 3.3.1-1 Re Amends 96 & 74 ML20140J4591996-12-13013 December 1996 Rev 11 to ODCM for Vogtle Electric Generating Plant, ML20138F1001996-12-13013 December 1996 Revs 10 & 11 to ODCM, Part 2 ML20132C4711996-12-12012 December 1996 Proposed Tech Specs Re Physical Security & Contingency Plan ML20134J9841996-10-0808 October 1996 /Unit 2 Fuel Assembly Insp Program ML20117N5851996-09-13013 September 1996 Proposed Tech Specs 3.8.1 Re AC Electrical Sources ML20129A6461996-09-11011 September 1996 Proposed Tech Specs,Providing Updated Documentation for License Amends Application for Southern Nuclear to Become Licensed Operator ML20117C4151996-08-23023 August 1996 Proposed Tech Specs to Convert Units 1 & 2 Based on NUREG 1431 ML20117N6361996-06-17017 June 1996 Proposed Tech Specs,Clarifying Requirements of TS SR 4.8.1.1.2.j (2) That Prescribes Pressure Test of Portions of Diesel fuel-oil Sys Designed to Section Iii,Subsection Nd of ASME Code ML20117N6471996-06-17017 June 1996 Proposed Tech Specs Section 5.3.1,allowing Use of Fuel Assemblies Containing Fuel Rods Clad W/Zirlo ML20111A5501996-05-0606 May 1996 Proposed Tech Specs,Incorporating Extended DG AOT to 14 Days from Discovery of Failure to Meet Lco,Provided Standby Auxiliary Transformer Available ML20106H2391996-03-31031 March 1996 Rev 10 to Gap Security Dept Vogtle Electric Generating Plant Nuclear Security Training & Qualification Plan ML20101D4151996-03-0505 March 1996 Proposed Tech Specs Re Conversion Based on NUREG-1431 ML20100G0371996-02-19019 February 1996 Proposed Tech Specs Based on NUREG-1431 ML20097A3171996-01-30030 January 1996 Proposed Improved TS Based on NUREG-1431 ML20096G8241996-01-22022 January 1996 Inservice Insp Program, for VEGP-2 ML20095J2501995-12-22022 December 1995 Proposed Tech Specs,Allowing Use of Option B of 10CFR50,App J for Type B & C Testing ML20094N4071995-11-20020 November 1995 Proposed Tech Specs,Converting Existing TS to Format & Content of NUREG-1431 ML20093K2281995-10-16016 October 1995 Proposed Tech Specs,Adding Footnote to Spec 4.6.1.2.d Stating That Type B & C Tests Scheduled for Refueling Outage 1R6 Will Be Conducted Per Option B of 10CFR50 App J & Using Guidance of RG 1.163,Rev 0 ML20098C1471995-10-0202 October 1995 Proposed Tech Specs,Allowing Next Type a Test to Be Rescheduled 1999-09-22
[Table view] |
Text
L s <
ENCLOSURE 3 l
VOGTLE ELECTRIC GENERATING PLANT REQUEST TO REVISE TECllNICAL SPECIFICATIONS SLAVE RELAY TEST FREQUENCY SURVEILLANCE REQUIREMENT 3.3.2.5 MARKED-UP TS AND BASES PAGES 9908300170 990824 PDR P ADOCK 05000424 PDR E3-1
r
. ESFAS instrumentation 3.3.2 SURVEILLANCE REQUIREMENTS NOTE Refer to Table 3.3.2-1 to deterrnine which SRs apply for each ESFAS Function.
SURVEILLANCE FREQUENCY SR 3.3.2.1 Perform CHANNEL CHECK. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SR 3.3.2.2 Perform ACTUATION LOGIC TEST. 31 days on a STAGGERED TEST BASIS SR 3.3.2.3 Perform MASTER RELAY TEST. 31 days on a STAGGERED TEST BASIS SR 3.3.2.4 Perform COT. 92 days O SR 3.3.2.5 Perform SLAVE RELAY TEST. OC. 1 3j lR N)nninS i SR '3.3.2.6 NOTE Verification of setpoint not required for manual initiation functions.
Perform TADOT. 18 months (continued)
~
O 3.3.2-7 Amendment No.
Vogtle Units 1 and 2 Unit 1)
Amendment No. nit 2) !
ESFAS Instrumentttion e
B 3.3.2 BASES SURVEILLANCE h
SR 3.3.2.5 (continued)-
REQUIREMENTS where the relay contact operation can be verified without operation of the equipment. Actuation equipment that may not be operated in the design mitigation MODE is prevented from operation by the SLAVE RELAY TEST circuit. For this latter case, contact operation is verified by a continuity check of the circuit containing the slave relay. . .... mm .. r.m....__ e ;cr/ 92 dry Ne crequ:nci edequ;;;. lt b bo c6 un indu.:.j spero;bs expc.iers, eer.b- @*0 inctru nc..i seiiaomty and operaTirrg1...;erf d;te
> Tnsuf SR 3.3.2.6 SR 3.3.2.6 is the performance of a TADOT. This test is a check of the Manual Actuation Functions and AFW pump start on trip of all MFW pumps. It is performed every 18 months. Each Manual
_ Actuation Function is tested up to, and including, the master relay coils, in some instances, the test includes actuation of the end device (i.e., pump starts, valve cycles, etc.). The Frequency is based on industry operating experience and is consistent with the typical refueling cycle. The SR is modified by a Note that excludes verification of setpoints for manualinitiation Functions. The manual initiation Functions have no assumed setpoints.
SR 3.3.2.7 SR 3.3.2.7 is the performance of a CHANNEL CAllBRATION.
A CHANNEL CALIBRATION is performed cvery 18 months, or approximately at every refueling. CHANNEL CALIBRATION is a complete check of the instrument loop, including the sensor. The test verifies that the channel responds to measured parameter within the necessary range and accuracy.
CHANNEL CAllBRATIONS must be performed consistent with the assumptions of the unit specific setpoint methodology. The difference between the current "as found" values and the previous test 'as left" values must be consistent with the drift allowance used in the setpoint methodology.
(continued) 9 Vogtle Units 1 and 2 5 3.3.2-48 Revision No.92-
e INSERT f
For slave relays and associated auxiliary relays in the ESFAS actuation system circuit that are Potter and Brumfield (P&B) type Motor Driven Relays (MDR), the SLAVE RELAY TEST is performed on an 18-month frequency. This test frequency is based on relay reliability assessments presented in WCAP-13878, " Reliability Assessment of Potter and Brmnfield MDR Series Relays." The reliability assessments are relay specific and apply only to Potter and Brumfield MDR series relays. Quarterly testing of the slave relays associated with non-P&B MDR auxiliary relays will be administratively controlled until an alternate method of testing the auxiliary relays is developed or until they are replaced by P&B MDR series relays I 1
1 l
j i
1 l
L l
[* , ESFAS instrumtntation B 3.3.2
,. BASES REFERENCES .
Amendments 43 and 44 (Unit 1) and 23 and 24 (Unit (continued) 2), revised ESFAS Interlocks Pressurizer P-11 trip setpoint and allowable value.
- 7. WCAP-10271-P-A, Supplement 2, Rev.1, June 1990.
- 8. FSAR, Chapter 16.
l 9. Westinghouse Letter GP-16696, November 5,1997.
- 10. WCAP-13632-P-A Revision 2, " Elimination of Pressure Sensor Response Time Testing Requirements," January 1996.
- 11. WCAP-14036-P-A Revision 1," Elimination of Periodic Protection Channel Response Time Tests," October 1998.
- 12. wcnP-l3 to y + A RM14n 6 " Re/;al;/dy o4 "RHe, +8 Reid mog f?ssessakb+ys, se,;es Ae:I /196. O I 3, lHA/ 2- !3900 $?cds.'on 6"Edenno'n o}
SL &4y ane;/6,ce TedLJc,a,1,, "
1 / pal m s
~
)y, wCAP-M i2 9 d?edrlonl,Rel,kbll$y 0HesSmenl ob IUes~Ly douse type /}(
Relays %ed as H e s S L Re la y s "
- hwy M9%
9 Vogtle Units 1 and 2 B 3.3.2-52 Rev, d
(
A -
1 c .
I ENCLOSURE 4 VOGTLE ELECTRIC GENERATING PLANT REQUEST TO REVISE TECIINICAL SPECIFICATIONS SLAVE RELAY TEST FREQUENCY SURVEILLANCE REQUIREMENT 3.3.2.5 CLEAN-TYPED TS AND BASES PAGES l
l I
I E4-1
ESFAS Instrumtntation
/
.e SURVEILLANCE REQUIREMENTS
- NorE -
Refer to Table 3.3.2 'i to determine which SRs apply for each ESFAS Function.
SURVEILLANCE FFEQUENCY SR 3.3.2.1 Perform CHANNEL CHECK. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SR 3.3.2.2 Perform ACTUATION LOGIC TEST. 31 days on a' STAGGERED TEST BASIS SR 3.3.2.3 Perform MASTER RELAY TEST. 31 days on a STAGGERED TEST BASIS SR 3.3.2.4 Perform COT. 92 days SR 3.3.2.5 Perform SLAVE RELAY TEST. 18 months l
SR 3.3.2.F NOTE Verification of setpoint not required for manual initiation functions. )
Perform TADOT. 18 months l (continuedi l
l L
1 I
~
Vogtle Units 1 and 2 3.3.2-7 Amendment No. (Unit 1)
Amendment No. (Unit 2)
ESFAS Instrum:ntation B 3.3.2 BASES SllRVEILLANCE SR 3.3.2.5 (continued)
REQUIREMENTS where the nelay contact operation can be verified without operz, tion of the eqJ.pment. Actuation equipment that may not be operated in the design mitigation MODE is prevented from operation by the SLAVE RELAY TEST circuit. For this latter case, contact operation is verified by a continuity check of the circuit containing the slave relay.
For slave relays and associated auxiliary relays in the ESFAS actuation system circuit that are Potter and Brumfield (P&B) type MOTOR-DRIVEN RELAYS (MDRs), the SLAVE RELAY TEST is performed on an 18-month frequency. This test fraquency is based on relay reliability assessments presented in WCAP 13678,
- Reliability Assessment of Potter and Brumfield MDR Series I Relays." The reliability assessments are relay specific and apply only to Potter and Brumfield MDR series relays. Quarterly testing of the slave relays associated with non-P&B MDR auxiliary relays will be administratively controlled until an alternate method of testing the auxiliary relays is developed or until they are replaced by P&B MDR series relays.
SR 3.3.2.6 SR 3.3.2.6 is the performance of a TADOT. This test is a check of the Manual Actuation Functions and AFW pump start on trip of all MFW pumps. It is performed every 18 months. Each Manual Actuation Function is tested up to, and including, the master relay coils. In some instances, the test includes actuation of the end device (i.e., pump starts, valve cycles, etc.). The Frequency is based on iridustry operating experience and is consistent with the typical refueling cycle. The SR is modified by a Note that excludes verification of setpoints for manualinitiation Functions. The manual initiation Functions have no assumed setpoints.
SR 3.3.2.7 SR 3.3.2.7 is the performance of a CHANNEL CALIBRATION.
A CHANNEL CALIBRATION is performed every 18 months, or approximately at every refueling. CHANNEL CAllBRATION is a complete check of the instrument loop, including the sensor. The test verifies that the channel responds to measured parameter within the necessary range and accuracy.
Vogtle Units 1 and 2 8 3.3.2-48 Revision No.
1
)
ESFAS Instrum:ntation B 3.3.2 CHANNEL CAllBRATIONS must be performed consistent with the assumptions of the unit specific setpoint methodology. The difference between the current "as found" values and the previous test "as left" values must be consistent with the drift allowance used in the setpoint methodology.
(continued)
Vogtle Units 1 and 2 B 3.3.2-48a Revision No.
t'
' MMA L
7, .
- ESFAS Inttrument: tion B 3.3.2 1
i THIS PAGE INTENTIONALLY LEFT BLANK l
I i
o i
i l
- Vogtie Units 1 and 2 B 3.3.2 48b Revision No.
.s_
m ESFAS Instrum:ntation
- , B 3.3.2 BASES REFERENCES e Amendments 43 and 44 (Unit 1) and 23 and 24 (Unit (continued) 2), revised ESFAS Interlocks Pressurizer P-11 trip setpoint and allowable value.
- 7. WCAP-10271-P-A, Supplement 2, Rev.1, June 1990.
- 8. FSAR, Chapter 16.
- 9. Westinghouse Letter GP-16696, November 5,1997.
- 10. WCAP-13632-P-A Revision 2, " Elimination of Pressure Sensor Response Time Testing Requirements," January 1996.
- 11. WCAP-14036-P-A Revision 1 " Elimination of Periodic Protection Channel Response Time Tests," October 1998.
- 12. WCAP-13878-P-A Revision 1, " Reliability Assessment of Potter
& Brumfield MDR Series Relays," April 1996.
- 13. WCAP-13900 Revision 0," Extension of Slave Relay Surveillance Test Intervals," April 1994.-
- 14. WCAP-14129 Revision 1," Reliability Assessment of Westinghouse Type AR Relays Used as SSPS Slave Relays." January 1999.
Vogtie _ Units 1 and 2 B 3.3.2-52 Revision No.
r e
ENCLOSURE 5 VOGTLE ELECTRIC GENERATING PLANT REQUEST TO REVISE TECHNICAL SPECIFICATIONS SLAVE RELAY TEST FREQUENCY SURVEILLANCE REQUIREMENT 3.3.2.5 OWNER'S GROUP LETTER l
1 l
i ES-1
Desnostic 9tIIIsles Irviernellonet Ututt6es W 8 8'O
- Arnoncen Elecine Power Houston Uphting & Power
[4 #
Carohne Power & Light Cornrnonwealth Echeon New York Power Authorny Northeast UtilMies Southern Nucisar Tennessee Vatey Authorny Electrebet Kansel Electric Power K0'ee Electnc Power
- WO)
-4
! consohdated Edson Duquesne upht Northern States Power Pacilic Gas & E6scenc TU Enoctric Union ElecWic Nuc6eer Electnc pic Virginie Power Nukieerne Elektrana 9,$ g e Duke Power Public Service Electic & Gas Wisconsin Electric Power Spanish Utilmes 4, oe Georgis Power . Rochester Gas & Electric Waconsin Public service Taman Power
. Florida Power & Ught South Carohne Electric & Gas Vettenfell Won creek Nuclear OG-98-018 WCAP-13878-P-A, Rev.1 WCAP-14117-NP-A, Rev.1 Project Number 694 February 13,1998 Document Control Desk U.S. Nuclear Regulatory Commission Washiagiaa. DC 20555-0001 Attention: Chief, Information Management Branch, Division ofInspection and Support Programs
Subject:
Westmghouse Owners Group Transmittal of Reports: WCAP-13878-P-A. Rev.1 (Proprietary) and WCAP-14117 NP A. Rev.1 (Non-Proprietary). Entitled " Reliability Assessment of Potter &
Brumfield MDR Series Relavs" (MUHP-7042) .
This letter transmits fifteen (15) copies of the report WCAP-13878-P-A, Rev.1 (Proprietary) and_ twelve ..
}
i (12) copies of the report WCAP-14117-NP-A, Rev.1 (Non-Proprietary), all entitled " Reliability Assessment of Potter & Brumfield MDR Series Relays", dated January 1997.
Reference:
CAW-94-739, dated October 17,1994.
Ihe above reference transmitted the following documents to Document Control Desk.
- 1. One (1) copy of the Application of Withholding Proprietary Information from P'ublic Disclosure, CAW-94-739 (Non-proprietary).
- 2. One (1) copy of Affidavit CAW-94-739 (Non-proprietary).
- 3. One (1) copy of the Copyright Notice.
- 4. _ One (1) copy of the Proprietary Information Notice "Ihis letter transmits the approved versions of the proprietary and non-proprietary WCAPs in accordance with the procedures established in NUREG-0390. Previous versions of these reports were transmitted to the NRC by ' i
- Pacific Gas & Electric Cm===y letter, DCL-94-254, dated November 14,1994, as part of the license amendment !
request for the Diablo Canyon Units 1 & 2, one of the lead plants for slave relay test frequency relaxation. 'Ihe j NRC SER approving the WCAP report states that WCAP-13878 may be referenced in license amendment ;
applications for other WMaghanne press:rized water reactors.
(" &
7 .' , .
. -1;;t e &
f,e .
s rr w - r /
Page 2 /gf gy ff g/
OG-98-018 February 13,1998 As this report, WCAP-13878-P-A, Rev.1, contains information proprietary to Westinghouse Electric Corporation, it is being controlled with amdavits transnuaed previously and signed by Westinghouse, the owner of the information. The amdavits set forth the basis on which the information be withheld from public disclosure by the Commission and addresses with specificity the considerations listed in paragraph (b)(4) of Section 2.790 of the Commission's regulations. Accordingly, it is respectively requested that the information which is proprietary be withheld from public disclosure in accordance with 10CFR Section 2.790 of the Commission's regulations.
Correspondence with respect to the proprietary aspect of the Applications for Withholding or the supporting Westinghouse amdavits should reference CAW-94-739 as appropriate and should be addressed to Mr. H.A. Sepp, Manager, Regulatory and Licensing Engineering, Westinghouse Electric Corporation, P.O. Box 355, Pittsburgh, PA 15230-0355.
Very truly yours, Louis F. Liberatori, Jr. , Chairman Westinghouse Owners Group JDC/LFI/
l enclosures
]
WOG Steering Committee (IL) cc: ,
WOG Primary Representatives (IL)
WOG SRT Subgroup Representatives 1 T.H. Clonmger, Houston Lighting & P.. .r (IL)
J. Bailey,TVA(1L)
Claudia Craig, USNRC (IL)
A.P. Drakel - ECE 5-16 (IL) 9000018. des Pues 2