ML20211E911

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs,Relaxing Slave Relay Test Frequency from Quarterly to Refueling Frequency
ML20211E911
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 08/24/1999
From:
SOUTHERN NUCLEAR OPERATING CO.
To:
Shared Package
ML20211E907 List:
References
NUDOCS 9908300170
Download: ML20211E911 (12)


Text

L s <

ENCLOSURE 3 l

VOGTLE ELECTRIC GENERATING PLANT REQUEST TO REVISE TECllNICAL SPECIFICATIONS SLAVE RELAY TEST FREQUENCY SURVEILLANCE REQUIREMENT 3.3.2.5 MARKED-UP TS AND BASES PAGES 9908300170 990824 PDR P ADOCK 05000424 PDR E3-1

r

. ESFAS instrumentation 3.3.2 SURVEILLANCE REQUIREMENTS NOTE Refer to Table 3.3.2-1 to deterrnine which SRs apply for each ESFAS Function.

SURVEILLANCE FREQUENCY SR 3.3.2.1 Perform CHANNEL CHECK. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SR 3.3.2.2 Perform ACTUATION LOGIC TEST. 31 days on a STAGGERED TEST BASIS SR 3.3.2.3 Perform MASTER RELAY TEST. 31 days on a STAGGERED TEST BASIS SR 3.3.2.4 Perform COT. 92 days O SR 3.3.2.5 Perform SLAVE RELAY TEST. OC. 1 3j lR N)nninS i SR '3.3.2.6 NOTE Verification of setpoint not required for manual initiation functions.

Perform TADOT. 18 months (continued)

~

O 3.3.2-7 Amendment No.

Vogtle Units 1 and 2 Unit 1)

Amendment No. nit 2)  !

ESFAS Instrumentttion e

B 3.3.2 BASES SURVEILLANCE h

SR 3.3.2.5 (continued)-

REQUIREMENTS where the relay contact operation can be verified without operation of the equipment. Actuation equipment that may not be operated in the design mitigation MODE is prevented from operation by the SLAVE RELAY TEST circuit. For this latter case, contact operation is verified by a continuity check of the circuit containing the slave relay. . .... mm .. r.m....__ e ;cr/ 92 dry Ne crequ:nci edequ;;;. lt b bo c6 un indu.:.j spero;bs expc.iers, eer.b- @*0 inctru nc..i seiiaomty and operaTirrg1...;erf d;te

> Tnsuf SR 3.3.2.6 SR 3.3.2.6 is the performance of a TADOT. This test is a check of the Manual Actuation Functions and AFW pump start on trip of all MFW pumps. It is performed every 18 months. Each Manual

_ Actuation Function is tested up to, and including, the master relay coils, in some instances, the test includes actuation of the end device (i.e., pump starts, valve cycles, etc.). The Frequency is based on industry operating experience and is consistent with the typical refueling cycle. The SR is modified by a Note that excludes verification of setpoints for manualinitiation Functions. The manual initiation Functions have no assumed setpoints.

SR 3.3.2.7 SR 3.3.2.7 is the performance of a CHANNEL CAllBRATION.

A CHANNEL CALIBRATION is performed cvery 18 months, or approximately at every refueling. CHANNEL CALIBRATION is a complete check of the instrument loop, including the sensor. The test verifies that the channel responds to measured parameter within the necessary range and accuracy.

CHANNEL CAllBRATIONS must be performed consistent with the assumptions of the unit specific setpoint methodology. The difference between the current "as found" values and the previous test 'as left" values must be consistent with the drift allowance used in the setpoint methodology.

(continued) 9 Vogtle Units 1 and 2 5 3.3.2-48 Revision No.92-

e INSERT f

For slave relays and associated auxiliary relays in the ESFAS actuation system circuit that are Potter and Brumfield (P&B) type Motor Driven Relays (MDR), the SLAVE RELAY TEST is performed on an 18-month frequency. This test frequency is based on relay reliability assessments presented in WCAP-13878, " Reliability Assessment of Potter and Brmnfield MDR Series Relays." The reliability assessments are relay specific and apply only to Potter and Brumfield MDR series relays. Quarterly testing of the slave relays associated with non-P&B MDR auxiliary relays will be administratively controlled until an alternate method of testing the auxiliary relays is developed or until they are replaced by P&B MDR series relays I 1

1 l

j i

1 l

L l

[* , ESFAS instrumtntation B 3.3.2

,. BASES REFERENCES .

Amendments 43 and 44 (Unit 1) and 23 and 24 (Unit (continued) 2), revised ESFAS Interlocks Pressurizer P-11 trip setpoint and allowable value.

7. WCAP-10271-P-A, Supplement 2, Rev.1, June 1990.
8. FSAR, Chapter 16.

l 9. Westinghouse Letter GP-16696, November 5,1997.

10. WCAP-13632-P-A Revision 2, " Elimination of Pressure Sensor Response Time Testing Requirements," January 1996.
11. WCAP-14036-P-A Revision 1," Elimination of Periodic Protection Channel Response Time Tests," October 1998.
12. wcnP-l3 to y + A RM14n 6 " Re/;al;/dy o4 "RHe, +8 Reid mog f?ssessakb+ys, se,;es Ae:I /196. O I 3, lHA/ 2- !3900 $?cds.'on 6"Edenno'n o}

SL &4y ane;/6,ce TedLJc,a,1,, "

1 / pal m s

~

)y, wCAP-M i2 9 d?edrlonl,Rel,kbll$y 0HesSmenl ob IUes~Ly douse type /}(

Relays %ed as H e s S L Re la y s "

hwy M9%

9 Vogtle Units 1 and 2 B 3.3.2-52 Rev, d

(

A -

1 c .

I ENCLOSURE 4 VOGTLE ELECTRIC GENERATING PLANT REQUEST TO REVISE TECIINICAL SPECIFICATIONS SLAVE RELAY TEST FREQUENCY SURVEILLANCE REQUIREMENT 3.3.2.5 CLEAN-TYPED TS AND BASES PAGES l

l I

I E4-1

ESFAS Instrumtntation

/

  • 3.3.2

.e SURVEILLANCE REQUIREMENTS

- NorE -

Refer to Table 3.3.2 'i to determine which SRs apply for each ESFAS Function.

SURVEILLANCE FFEQUENCY SR 3.3.2.1 Perform CHANNEL CHECK. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SR 3.3.2.2 Perform ACTUATION LOGIC TEST. 31 days on a' STAGGERED TEST BASIS SR 3.3.2.3 Perform MASTER RELAY TEST. 31 days on a STAGGERED TEST BASIS SR 3.3.2.4 Perform COT. 92 days SR 3.3.2.5 Perform SLAVE RELAY TEST. 18 months l

SR 3.3.2.F NOTE Verification of setpoint not required for manual initiation functions. )

Perform TADOT. 18 months l (continuedi l

l L

1 I

~

Vogtle Units 1 and 2 3.3.2-7 Amendment No. (Unit 1)

Amendment No. (Unit 2)

ESFAS Instrum:ntation B 3.3.2 BASES SllRVEILLANCE SR 3.3.2.5 (continued)

REQUIREMENTS where the nelay contact operation can be verified without operz, tion of the eqJ.pment. Actuation equipment that may not be operated in the design mitigation MODE is prevented from operation by the SLAVE RELAY TEST circuit. For this latter case, contact operation is verified by a continuity check of the circuit containing the slave relay.

For slave relays and associated auxiliary relays in the ESFAS actuation system circuit that are Potter and Brumfield (P&B) type MOTOR-DRIVEN RELAYS (MDRs), the SLAVE RELAY TEST is performed on an 18-month frequency. This test fraquency is based on relay reliability assessments presented in WCAP 13678,

  • Reliability Assessment of Potter and Brumfield MDR Series I Relays." The reliability assessments are relay specific and apply only to Potter and Brumfield MDR series relays. Quarterly testing of the slave relays associated with non-P&B MDR auxiliary relays will be administratively controlled until an alternate method of testing the auxiliary relays is developed or until they are replaced by P&B MDR series relays.

SR 3.3.2.6 SR 3.3.2.6 is the performance of a TADOT. This test is a check of the Manual Actuation Functions and AFW pump start on trip of all MFW pumps. It is performed every 18 months. Each Manual Actuation Function is tested up to, and including, the master relay coils. In some instances, the test includes actuation of the end device (i.e., pump starts, valve cycles, etc.). The Frequency is based on iridustry operating experience and is consistent with the typical refueling cycle. The SR is modified by a Note that excludes verification of setpoints for manualinitiation Functions. The manual initiation Functions have no assumed setpoints.

SR 3.3.2.7 SR 3.3.2.7 is the performance of a CHANNEL CALIBRATION.

A CHANNEL CALIBRATION is performed every 18 months, or approximately at every refueling. CHANNEL CAllBRATION is a complete check of the instrument loop, including the sensor. The test verifies that the channel responds to measured parameter within the necessary range and accuracy.

Vogtle Units 1 and 2 8 3.3.2-48 Revision No.

1

)

ESFAS Instrum:ntation B 3.3.2 CHANNEL CAllBRATIONS must be performed consistent with the assumptions of the unit specific setpoint methodology. The difference between the current "as found" values and the previous test "as left" values must be consistent with the drift allowance used in the setpoint methodology.

(continued)

Vogtle Units 1 and 2 B 3.3.2-48a Revision No.

t'

' MMA L

7, .

- ESFAS Inttrument: tion B 3.3.2 1

i THIS PAGE INTENTIONALLY LEFT BLANK l

I i

o i

i l

- Vogtie Units 1 and 2 B 3.3.2 48b Revision No.

.s_

m ESFAS Instrum:ntation

, B 3.3.2 BASES REFERENCES e Amendments 43 and 44 (Unit 1) and 23 and 24 (Unit (continued) 2), revised ESFAS Interlocks Pressurizer P-11 trip setpoint and allowable value.
7. WCAP-10271-P-A, Supplement 2, Rev.1, June 1990.
8. FSAR, Chapter 16.
9. Westinghouse Letter GP-16696, November 5,1997.
10. WCAP-13632-P-A Revision 2, " Elimination of Pressure Sensor Response Time Testing Requirements," January 1996.
11. WCAP-14036-P-A Revision 1 " Elimination of Periodic Protection Channel Response Time Tests," October 1998.
12. WCAP-13878-P-A Revision 1, " Reliability Assessment of Potter

& Brumfield MDR Series Relays," April 1996.

13. WCAP-13900 Revision 0," Extension of Slave Relay Surveillance Test Intervals," April 1994.-
14. WCAP-14129 Revision 1," Reliability Assessment of Westinghouse Type AR Relays Used as SSPS Slave Relays." January 1999.

Vogtie _ Units 1 and 2 B 3.3.2-52 Revision No.

r e

ENCLOSURE 5 VOGTLE ELECTRIC GENERATING PLANT REQUEST TO REVISE TECHNICAL SPECIFICATIONS SLAVE RELAY TEST FREQUENCY SURVEILLANCE REQUIREMENT 3.3.2.5 OWNER'S GROUP LETTER l

1 l

i ES-1

Desnostic 9tIIIsles Irviernellonet Ututt6es W 8 8'O

  • Arnoncen Elecine Power Houston Uphting & Power

[4 #

Carohne Power & Light Cornrnonwealth Echeon New York Power Authorny Northeast UtilMies Southern Nucisar Tennessee Vatey Authorny Electrebet Kansel Electric Power K0'ee Electnc Power

  1. WO)

-4

! consohdated Edson Duquesne upht Northern States Power Pacilic Gas & E6scenc TU Enoctric Union ElecWic Nuc6eer Electnc pic Virginie Power Nukieerne Elektrana 9,$ g e Duke Power Public Service Electic & Gas Wisconsin Electric Power Spanish Utilmes 4, oe Georgis Power . Rochester Gas & Electric Waconsin Public service Taman Power

. Florida Power & Ught South Carohne Electric & Gas Vettenfell Won creek Nuclear OG-98-018 WCAP-13878-P-A, Rev.1 WCAP-14117-NP-A, Rev.1 Project Number 694 February 13,1998 Document Control Desk U.S. Nuclear Regulatory Commission Washiagiaa. DC 20555-0001 Attention: Chief, Information Management Branch, Division ofInspection and Support Programs

Subject:

Westmghouse Owners Group Transmittal of Reports: WCAP-13878-P-A. Rev.1 (Proprietary) and WCAP-14117 NP A. Rev.1 (Non-Proprietary). Entitled " Reliability Assessment of Potter &

Brumfield MDR Series Relavs" (MUHP-7042) .

This letter transmits fifteen (15) copies of the report WCAP-13878-P-A, Rev.1 (Proprietary) and_ twelve ..

}

i (12) copies of the report WCAP-14117-NP-A, Rev.1 (Non-Proprietary), all entitled " Reliability Assessment of Potter & Brumfield MDR Series Relays", dated January 1997.

Reference:

CAW-94-739, dated October 17,1994.

Ihe above reference transmitted the following documents to Document Control Desk.

1. One (1) copy of the Application of Withholding Proprietary Information from P'ublic Disclosure, CAW-94-739 (Non-proprietary).
2. One (1) copy of Affidavit CAW-94-739 (Non-proprietary).
3. One (1) copy of the Copyright Notice.
4. _ One (1) copy of the Proprietary Information Notice "Ihis letter transmits the approved versions of the proprietary and non-proprietary WCAPs in accordance with the procedures established in NUREG-0390. Previous versions of these reports were transmitted to the NRC by ' i

- Pacific Gas & Electric Cm===y letter, DCL-94-254, dated November 14,1994, as part of the license amendment  !

request for the Diablo Canyon Units 1 & 2, one of the lead plants for slave relay test frequency relaxation. 'Ihe j NRC SER approving the WCAP report states that WCAP-13878 may be referenced in license amendment  ;

applications for other WMaghanne press:rized water reactors.

(" &

7 .' , .

. -1;;t e &

f,e .

s rr w - r /

Page 2 /gf gy ff g/

OG-98-018 February 13,1998 As this report, WCAP-13878-P-A, Rev.1, contains information proprietary to Westinghouse Electric Corporation, it is being controlled with amdavits transnuaed previously and signed by Westinghouse, the owner of the information. The amdavits set forth the basis on which the information be withheld from public disclosure by the Commission and addresses with specificity the considerations listed in paragraph (b)(4) of Section 2.790 of the Commission's regulations. Accordingly, it is respectively requested that the information which is proprietary be withheld from public disclosure in accordance with 10CFR Section 2.790 of the Commission's regulations.

Correspondence with respect to the proprietary aspect of the Applications for Withholding or the supporting Westinghouse amdavits should reference CAW-94-739 as appropriate and should be addressed to Mr. H.A. Sepp, Manager, Regulatory and Licensing Engineering, Westinghouse Electric Corporation, P.O. Box 355, Pittsburgh, PA 15230-0355.

Very truly yours, Louis F. Liberatori, Jr. , Chairman Westinghouse Owners Group JDC/LFI/

l enclosures

]

WOG Steering Committee (IL) cc: ,

WOG Primary Representatives (IL)

WOG SRT Subgroup Representatives 1 T.H. Clonmger, Houston Lighting & P.. .r (IL)

J. Bailey,TVA(1L)

Claudia Craig, USNRC (IL)

A.P. Drakel - ECE 5-16 (IL) 9000018. des Pues 2